Pashmina Brookwoods

By Shashwati Realty Pvt Ltd

RG-KA-25553 · RERA PRM/KA/RERA/1250/304/PR/171015/000556 · Last updated on RERA Karnataka portal: 27 Oct 2025

Source: official RERA Karnataka filing

Red flags

  • 79 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2022Possession promisedmoved 9 months from the original
79Complaints at RERA Karnatakaon this registration
Jump to the 110 documents Report an error

Pashmina Brookwoods is a Residential/Group Housing project by Shashwati Realty Pvt Ltd in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/171015/000556 on 15 Oct 2017. Possession is promised by 30 Jun 2022. The completion date has moved by 9 months from the original filing. 79 complaints are on record with the regulator.

At a glance

Project

  • NamePashmina Brookwoods
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/304/PR/171015/000556
  • ReraGenie IDRG-KA-25553

Builder

  • NameShashwati Realty Pvt Ltd
  • Entity typeCompany
  • CINU45400MH2007PTC169301
  • Authorized SignatoryMr.Haresh Kumar

Key dates

this monthRegisteredOct 2017First promiseSep 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Sep 2021)
  • Buildings5 building records
  • Documents filed110 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block -1---1780178
Block-2---5650565
Block-3---3940394
Block-4---2860286
Block-5---4560456

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 27 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 27 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area41,278 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 398.37 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectN Sasi Kumar
EngineerB E Pruthviraj

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2021 → Jun 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka79

Case no.ComplainantRespondentFiled
CMP/190830/0004075-Shashwati Realty Pvt Ltd30/08/2019
CMP/190831/0004092-Shashwati Realty Pvt Ltd31/08/2019
CMP/190929/0004339-Shashwati Realty Pvt Ltd29/09/2019
CMP/200816/0006374-Shashwati Realty Pvt Ltd16/08/2020
CMP/200907/0006526-Shashwati Realty Pvt Ltd07/09/2020
CMP/200917/0006610-Shashwati Realty Pvt Ltd17/09/2020
CMP/200924/0006653-Shashwati Realty Pvt Ltd24/09/2020
CMP/200926/0006671-Shashwati Realty Pvt Ltd26/09/2020
CMP/200929/0006704-Shashwati Realty Pvt Ltd29/09/2020
CMP/201003/0006752-Shashwati Realty Pvt Ltd03/10/2020
CMP/201004/0006748-Shashwati Realty Pvt Ltd04/10/2020
CMP/201004/0006755-Shashwati Realty Pvt Ltd04/10/2020
CMP/201004/0006757-Shashwati Realty Pvt Ltd04/10/2020
CMP/201004/0006759-Shashwati Realty Pvt Ltd04/10/2020
CMP/201005/0006746-Shashwati Realty Pvt Ltd05/10/2020
CMP/201014/0006845-Shashwati Realty Pvt Ltd14/10/2020
CMP/201022/0006928-Shashwati Realty Pvt Ltd22/10/2020
CMP/201104/0007010-Shashwati Realty Pvt Ltd04/11/2020
CMP/210308/0007757-Shashwati Realty Pvt Ltd08/03/2021
CMP/210618/0008016-Shashwati Realty Pvt Ltd18/06/2021
CMP/210929/0008397-Shashwati Realty Pvt Ltd29/09/2021
CMP/211008/0008422-Shashwati Realty Pvt Ltd08/10/2021
CMP/211102/0008511-Shashwati Realty Pvt Ltd02/11/2021
CMP/211108/0008522-Shashwati Realty Pvt Ltd08/11/2021
CMP/220317/0009145-Shashwati Realty Pvt Ltd17/03/2022
CMP/220811/0009863-Shashwati Realty Pvt Ltd11/08/2022
CMP/220811/0009870-Shashwati Realty Pvt Ltd11/08/2022
CMP/221017/0010111-Shashwati Realty Pvt Ltd17/10/2022
CMP/221108/0010227-Shashwati Realty Pvt Ltd08/11/2022
00134/2023-Shashwati Realty Pvt Ltd31/01/2023
00135/2023-Shashwati Realty Pvt Ltd31/01/2023
00199/2023-Shashwati Realty Pvt Ltd11/02/2023
00341/2023-Shashwati Realty Pvt Ltd16/03/2023
00343/2023-Shashwati Realty Pvt Ltd18/03/2023
00344/2023-Shashwati Realty Pvt Ltd18/03/2023
00398/2023-Shashwati Realty Pvt Ltd31/03/2023
00521/2023-Shashwati Realty Pvt Ltd19/04/2023
00627/2023-Shashwati Realty Pvt Ltd02/05/2023
00746/2023-Shashwati Realty Pvt Ltd16/05/2023
00774/2023-Shashwati Realty Pvt Ltd19/05/2023
00812/2023-Shashwati Realty Pvt Ltd22/05/2023
00813/2023-Shashwati Realty Pvt Ltd22/05/2023
00952/2023-Shashwati Realty Pvt Ltd22/06/2023
00955/2023-Shashwati Realty Pvt Ltd22/06/2023
00960/2023-Shashwati Realty Pvt Ltd22/06/2023
00989/2023-Shashwati Realty Pvt Ltd28/06/2023
01062/2023-Shashwati Realty Pvt Ltd06/07/2023
01305/2023-Shashwati Realty Pvt Ltd01/09/2023
01370/2023-Shashwati Realty Pvt Ltd06/09/2023
01383/2023-Shashwati Realty Pvt Ltd11/09/2023
01413/2023-Shashwati Realty Pvt Ltd14/09/2023
01559/2023-Shashwati Realty Pvt Ltd09/10/2023
01786/2023-Shashwati Realty Pvt Ltd01/12/2023
01813/2023-Shashwati Realty Pvt Ltd09/12/2023
01846/2023-Shashwati Realty Pvt Ltd18/12/2023
01847/2023-Shashwati Realty Pvt Ltd18/12/2023
00075/2024-Shashwati Realty Pvt Ltd18/01/2024
00095/2024-Shashwati Realty Pvt Ltd20/01/2024
00148/2024-Shashwati Realty Pvt Ltd31/01/2024
00224/2024-Shashwati Realty Pvt Ltd23/02/2024

Documents filed110

As listed on the registration, under the names the promoter filed them with; the newest 80 of 110 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/171015/000556 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
List of AllotteesFile: 5 List of Allottees.xlsx27 Oct 2025
List of DirectorsFile: 7 List of Directors.xlsx27 Oct 2025
STABILITY CERT-PBWFile: 19 STABILITY CERT-PBW.pdf27 Oct 2025
BHK Wise BreakupFile: 18 BHK Wise Breakup.pdf27 Oct 2025
PBW- STP location signedFile: 20 PBW- STP location signed.pdf27 Oct 2025
Water NOCFile: 1 Water NOC.pdf27 Oct 2025
Partial CFO - PBW Block 1File: 2 Partial CFO - PBW Block 1.pdf27 Oct 2025
AAI NOC new and oldFile: 3 AAI NOC new and old.pdf27 Oct 2025
BESCOM Electricity approvalFile: 4 BESCOM Electricity approval.pdf27 Oct 2025
PBW KSPCB NOCFile: 5 PBW KSPCB NOC.pdf27 Oct 2025
FIRE NOC and ClearanceFile: 6 FIRE NOC and Clearance.pdf27 Oct 2025
Form 4 CA Certificate Q1 2025-26File: 1 Form 4 CA Certificate Q1 2025-26.pdf8 Oct 2025
Form 5 Architect Certificate Q1 2025-26File: 2 Form 5 Architect Certificate Q1 2025-26.pdf8 Oct 2025
Form 6 Engg certificate Q1 2025-26File: 3 Form 6 Engg certificate Q1 2025-26.pdf8 Oct 2025
Clarification on Bank Ac NoFile: 4 Clarification on Bank Ac No.pdf8 Oct 2025
List of AllotteesFile: 5 List of Allottees.xlsx8 Oct 2025
List of DirectorsFile: 7 List of Directors.xlsx8 Oct 2025
Form B AffidavitFile: 8 Form B Affidavit.pdf8 Oct 2025
Form EX-7 AffidavitFile: 9 Form EX-7 Affidavit.pdf8 Oct 2025
Architect Certificate - Work CompletedFile: 10 Architect Certificate - Work Completed.pdf8 Oct 2025
Architect Certificate - Work PendingFile: 11 Architect Certificate - Work Pending.pdf8 Oct 2025
CA Cert for funds utilisationFile: 12 CA Cert for funds utilisation.pdf8 Oct 2025
CA Cert for funds requiredFile: 13 CA Cert for funds required.pdf8 Oct 2025
Engg certificate - work completedFile: 14 Engg certificate - work completed.pdf8 Oct 2025
Engg certificate - work pendingFile: 15 Engg certificate - work pending.pdf8 Oct 2025
Provisional Structural stability certificateFile: 16 Provisional Structural stability certificate.pdf8 Oct 2025
BLOCK 1 OCFile: 16 BLOCK 1 OC.pdf8 Oct 2025
BLOCK 2 OCFile: 17 BLOCK 2 OC.PDF8 Oct 2025
BHK Wise BreakupFile: 18 BHK Wise Breakup.pdf8 Oct 2025
STABILITY CERT-PBWFile: 19 STABILITY CERT-PBW.pdf8 Oct 2025
PBW- STP location signedFile: 20 PBW- STP location signed.pdf8 Oct 2025
Bank statement FY 21-22File: 1 Bank statement FY 21-22.pdf8 Oct 2025
Bank Statement FY 22-23File: 2 Bank Statement FY 22-23.pdf8 Oct 2025
Bank Statement FY 23-24File: 3 Bank Statement FY 23-24.pdf8 Oct 2025
Bank Statement FY 24-25File: 4 Bank Statement FY 24-25.pdf8 Oct 2025
Water NOCFile: 1 Water NOC.pdf8 Oct 2025
Partial CFO - PBW Block 1File: 2 Partial CFO - PBW Block 1.pdf8 Oct 2025
AAI NOC new and oldFile: 3 AAI NOC new and old.pdf8 Oct 2025
BESCOM Electricity approvalFile: 4 BESCOM Electricity approval.pdf8 Oct 2025
PBW KSPCBFile: 5 PBW KSPCB.pdf8 Oct 2025
FIRE NOC and ClearanceFile: 6 FIRE NOC and Clearance.pdf8 Oct 2025
CertificateFile: Certificate of Incorporation-Shashwati.pdf-
Certificate form Architect,Engineer,CA etc.File: ARCHITECTS Engineer and CA certificates PBW 1 MB.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc Cert for Work Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Cert Status of Work.pdf-
CA Certificate for Funds UtilizationFile: CA Cert for funds utilisation.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc Cert for Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Cert Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Cert for funds required.pdf-
AffidavitFile: Affidavit Seeking Ext.pdf-
Latest Encumbrance CertificateFile: EC.PDF-
Consent letter from 2/3rd of AllotteesFile: Affidavit 2 3rd consent.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: AA1 NOC.pdf-
Document 2File: BESCOM NOC.pdf-
Document 3File: BSNL NOC.pdf-
Document 4File: FIRE NOC.pdf-
Document 5File: SLEIAA.pdf-
Document 6File: Water NOC.pdf-
Document 7File: Affidavit 2 3rd consent.pdf-
Document 8File: Affidavit Form B.pdf-
Document 9File: Affidavit Seeking Ext.pdf-
Document 10File: REASON FOR EXTENSION.pdf-
Permission to Construct-PBW-
Building plan-
PBW DP sanctioned-
Pashmina Brookwoods- Draft Sale deed PDF-
Draft Sale Agreement 15 July 2017 PDF-
PBW DP sanctioned-
Approved section-
RTC -PBW-
pbw -section-
Area development plan-pbw-
Allotment Letter - Pashmina Brookwoods-
BrookWoods-Brochure-
NOC of Airport authority India latest-
PBW specs PDF copy-
Pashmina Brookwoods -Up to date EC-PDF-
E Katha 5 1MB-
Relinquisment Deed-1mb-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 9 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Pashmina Brookwoods on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: Shashwati Realty Pvt Ltd

Shashwati Realty Pvt Ltd has 1 registration on RERA Karnataka, including Pashmina Brookwoods. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Pashmina Brookwoods is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Pashmina Brookwoods?

The registered promoter entity is Shashwati Realty Pvt Ltd, a company as per the filing. Its CIN U45400MH2007PTC169301 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Pashmina Brookwoods?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pashmina Brookwoods?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Pashmina Brookwoods?

The professionals named in the filing: Architect: N Sasi Kumar; Engineer: B E Pruthviraj. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pashmina Brookwoods?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pashmina Brookwoods. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pashmina Brookwoods to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.