Completed No litigation declared Residential / Group Housing project

Spring Valley Phase II

By SHUBH GANESH PROPERTIES

RG-MH-25920 · RERA P52100013807 · Last updated on MahaRERA portal: 8 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
2Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Spring Valley Phase II is a Residential / Group Housing project by SHUBH GANESH PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100013807 on 25 Oct 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSpring Valley Phase II
  • TypeResidential / Group Housing
  • Location
    • MAHARASHTRA
    • CHAROLI
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013807
  • ReraGenie IDRG-MH-25920

Builder

  • NameSHUBH GANESH PROPERTIES
  • Entity typePartnership
  • PartnersSHAM DATTATRAY ADHAV, SANDIP SONYABAPU SHINDE
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredOct 2017First promiseJun 2021Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Oct 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WingNA170000
C WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

B Wing99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 8 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered92
BuildingClosed/CoveredTotal
B Wing4646
C WING4646

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,052 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8629.64
Proposed, not sanctioned7,109 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2,3 FLORENCE BUILDING, VIMAN NAGAR, OFF PUNE NAGAR, HIGHWAY PUNE - 411014

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNILKSHIRSAGAR
PartnerRole in project
SHUBH GANESH PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009650Jun 2021 → Jun 2022

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000054021Marcus Victor ParkerSUBH GANESH PROPERTIES12/01/2021
CC005000000371001Sakshi Vikas ChandratreShubh Ganesh Properties24/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2025

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Verification Email to Corporation.pdf8 Feb 2025
Other - TechnicalFile: Verification Email to Corporation.pdf7 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form4 Phase2 SPVL.pdf28 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate.pdf25 Nov 2024
Layout approvalFile: SPVL 2022.pdf29 Dec 2022
Details of encumbrancesFile: Shubh Ganesh Properties NDC NOC.pdf29 Dec 2022
Copy of Layout Approval (in case of layout)File: SPVL 2022.pdf29 Dec 2022
Other - FinanceFile: Shubh Ganesh Properties NDC NOC.pdf29 Dec 2022
Details of encumbrancesFile: ENCUMBRANCES DECLARATION.pdf7 Dec 2021
Building plan approvalFile: Building Plan Aproval - IOD - 2021.pdf11 Oct 2021
Building Plan Approval (IOD)File: Building Plan Aproval - IOD - 2021.pdf11 Oct 2021
Building plan approvalFile: Spring Valley_CC_2019.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_1-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_2-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_3-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_4-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_5-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_6-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_7-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_8-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_9-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_10-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_11-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_12-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_13-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_14-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_15-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_16-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_17-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_18-19.pdf3 Aug 2021
Building plan approvalFile: Spring Valley_Sanction Plan_2019_19-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_CC_2019.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_1-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_2-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_3-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_4-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_5-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_6-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_7-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_8-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_9-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_10-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_11-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_12-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_13-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_14-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_15-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_16-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_17-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_18-19.pdf3 Aug 2021
Building Plan Approval (IOD)File: Spring Valley_Sanction Plan_2019_19-19.pdf3 Aug 2021
Form 2AFile: RAJKUMAR SAGAR.pdf3 Aug 2021
Form 2AFile: SACHIN LOKHANDE.pdf3 Aug 2021
Form 2AFile: SAGAR KOPANBONE.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RAJKUMAR SAGAR.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SACHIN LOKHANDE.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SAGAR KOPANBONE.pdf3 Aug 2021
Disclosure of sold/ booked inventoryFile: B WING SOLD UNSOLD DETAILS.pdf3 Aug 2021
Disclosure of sold/ booked inventoryFile: C WING SOLD UNSOLD DETAILS.pdf3 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: SPVL PHASE 2 B WING REG CERTIFICATE.pdf24 May 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: SPVL PHASE 2 C WING REG CERTIFICATE.pdf24 May 2021
Form 2AFile: Form 2A Phase II.pdf5 Feb 2019
Certificates of CA (Form 5)File: Form 5 Self Declaration.pdf1 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Wadmukhwadi Plinth.pdf6 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_SGP.pdf15 Mar 2018
Layout approvalFile: MYSCAN_20170911_0010.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0015_b.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0016_2_B.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0016_b.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0017_2_b_c.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0017_B_c.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0018_2.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0018_C.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0020_2_C.pdf6 Oct 2017
Building plan approvalFile: MYSCAN_20170911_0020_C.pdf6 Oct 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf6 Oct 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170911_0010.pdf6 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170911_0015_b.pdf6 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170911_0016_2_B.pdf6 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170911_0016_b.pdf6 Oct 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Spring Valley Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAROLI13,700+ in Pune

2 kmSpring Valley Phase IICompleted 32Lapsed / revoked 14Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: SHUBH GANESH PROPERTIES

SHUBH GANESH PROPERTIES has 4 registrations on MahaRERA, including SPRING VALLEY PHASE I and Spring Valley Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Spring Valley Phase II is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Spring Valley Phase II?

The registered promoter entity is SHUBH GANESH PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Spring Valley Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Spring Valley Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Spring Valley Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Spring Valley Phase II?

The professionals named in the filing: Architect: SWAPNILKSHIRSAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Spring Valley Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Spring Valley Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Spring Valley Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.