ReraGenieLog inGet a buyer report

Home / Browse projects / SPARKLINE RESIDENCY

Registered No litigation declared Others project

SPARKLINE RESIDENCY

By A B DEVELOPERS

RG-MH-45130 · RERA P52100055353 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
3 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

SPARKLINE RESIDENCY is a Others project by A B DEVELOPERS in Chovisawadi, 412105, registered with MahaRERA as P52100055353 on 22 Mar 2024. Possession is promised by 31 Dec 2026. 36 of the 39 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSPARKLINE RESIDENCY
  • TypeOthers
  • Location
    • Nr Radcliffe School
    • Chovisawadi
    • 412105
  • Pincode412105
  • RERA no.P52100055353
  • ReraGenie IDRG-MH-45130

Builder

  • NameA B DEVELOPERS
  • Entity typePartnership
  • PartnersPradeep Suresh Tapkir, Dipali Sachin Tapkir
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

92%36 of 39 units booked
97.9%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SPARKLINE RESIDENCYNA8735439

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SPARKLINE RESIDENCY: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,270 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025

Approvals and building plan

Permissible FSI5428.9
Proposed, not sanctioned1,223 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Silvana County Shop No 7, Alandi Road, Chovisawadi Pune 412105
Estimated costRs 5.60 cr
Cost incurredRs 5.48 cr
Work done97.89%
BuildingWingEstimatedIncurred
SPARKLINE RESIDENCYNARs 5.60 crRs 5.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil and Bugade Associates
EngineerRK R K Randhave
EngineerPratik Babasaheb Ghare
Chartered AccountantSUNSVG And Associates
Chartered AccountantPRAVIN PISE & ASSOCIATES
Chartered AccountantR H Pothiwal and Associates
PartnerRole in project
A B DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1.pdf5 May 2026
Withdrawal Update Form 2File: Engineer certificate march.pdf5 May 2026
Withdrawal Update Form 3File: F3 AB DEVELOPERS.pdf5 May 2026
Withdrawal Update Form 1File: Architect cer oct-jan333.pdf25 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Sparkline Residency.pdf25 Feb 2026
Withdrawal Update Form 3File: Form_3.pdf25 Feb 2026
Withdrawal Update Form 1File: Architect cer oct-jan333.pdf4 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Sparkline Residency.pdf4 Feb 2026
Withdrawal Update Form 3File: F3-AB DEVELOPERS.pdf4 Feb 2026
Withdrawal Update Form 1File: Architect Certificate 14_07_025.pdf14 Nov 2025
Withdrawal Update Form 1File: FM1_Sep_2025.pdf14 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate June.pdf14 Nov 2025
Withdrawal Update Form 2File: Engineer Cert Singned.pdf14 Nov 2025
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf14 Nov 2025
Withdrawal Update Form 3File: F3-AB DEVELOPERS-SEPT-25.pdf14 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_June 25.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Jun 25.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate_June 25.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_June 25.pdf22 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure_June 25.pdf22 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March'25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate JFM 2025_compressed.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Mar 25_compressed (1).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer March'25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory March'25.pdf19 Apr 2025
Other - TechnicalFile: Form 2A 2024-25.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_2023-24.pdf2 Apr 2025
Layout approvalFile: 1 - converted.pdf7 Feb 2025
Building plan approvalFile: 1 - converted.pdf7 Feb 2025
Building plan approvalFile: 2.pdf7 Feb 2025
Copy of Layout Approval (in case of layout)File: 1 - converted.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 - converted.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf7 Feb 2025
Declaration about Commencement CertificateFile: Format D.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Dec 24 - converted.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Dec 24 - converted.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory_Dec 24.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer March-2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer June-2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Sep-2024.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March-24.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June-24.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June-24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep-24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March-24.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report_23-24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate AB Developers 30062024.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginrrt's Certificate AB Developers 30062024.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - AB Developers Sparkline Residency as on 30062024.pdf2 Aug 2024
Other - LegalFile: Declaration Cum Undertaking Anexure A.pdf26 Feb 2024
Other - FinanceFile: Declaration Cum Undertaking Anexure A.pdf26 Feb 2024
Other - TechnicalFile: Declaration Cum Undertaking Anexure A.pdf26 Feb 2024
CERSAI detailsFile: No CERSAI certificate 070224.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 PRadeep tapkir Declarations format A.pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Prashant tapkir Declarations format A.pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Komal tapkir Declarations format A.pdf3 Feb 2024
Proforma of Agreement for saleFile: Agreement Draft- SPARKLINE RESIDENCY0302.pdf3 Feb 2024
Copy of the legal title reportFile: AB Developers MaHa rera Search Report.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate26-2-24.pdf2 Feb 2024
Layout approvalFile: 1 Sanction Plan AB Sparkline -1_compressed.pdf6 Jan 2024
Building plan approvalFile: 1 Sanction Plan AB Sparkline -1_compressed.pdf6 Jan 2024
Building plan approvalFile: 1 Sanction Plan AB Sparkline -2_compressed.pdf6 Jan 2024
PAN CardFile: 0 Pan Card - A b.pdf6 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance0302.pdf6 Jan 2024
Details of encumbrances concerned to FinanceFile: 1 Encumbrances Legal.pdf6 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances Finance0302.pdf6 Jan 2024
Details of encumbrances concerned to LegalFile: 1 Encumbrances Legal.pdf6 Jan 2024
Copy of Layout Approval (in case of layout)File: 1 Sanction Plan AB Sparkline -1_compressed.pdf6 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Sanction Plan AB Sparkline -1_compressed.pdf6 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Sanction Plan AB Sparkline -2_compressed.pdf6 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Sparkline AB_compressed.pdf6 Jan 2024
Declaration about Commencement CertificateFile: 3 Commencement Declaration.pdf6 Jan 2024
Declaration in FORM BFile: 7 Form B Declaration - promoter.pdf6 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
SPARKLINE SOCIETYVillage - Chovisawadi Ta Haveli Pune 412105CompletedFeb 2024Jul 2023

Keep SPARKLINE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chovisawadi

Builder: A B DEVELOPERS

A B Developers has 3 registrations on MahaRERA, including Anandam Residency and SPARKLINE SOCIETY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if SPARKLINE RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPARKLINE RESIDENCY?

The registered promoter entity is A B DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPARKLINE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPARKLINE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPARKLINE RESIDENCY?

The professionals named in the filing: Architect: Patil and Bugade Associates; Engineer: RK R K Randhave; Engineer: Pratik Babasaheb Ghare; Chartered Accountant: SUNSVG And Associates; Chartered Accountant: PRAVIN PISE & ASSOCIATES; Chartered Accountant: R H Pothiwal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPARKLINE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPARKLINE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPARKLINE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.