Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 6 months from the original
2 of 11Construction stages donefurthest along: Basement (if any), 90%
59 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Space Grandeur is a Others project by Space Builder & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077838 on 7 Nov 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 6 months from the original filing. 7 of the 66 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSpace Grandeur
  • TypeOthers
  • Location
    • St.Antony Road
    • Santacruz East
    • Kolekalyan
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077838
  • ReraGenie IDRG-MH-18893

Builder

  • NameSpace Builder & Developers
  • Entity typePartnership
  • GSTIN27ADAFS2131B1ZQ
  • PartnersAnil Ram Tinani, Sonia Anil Tinani

Key dates

this monthRegisteredNov 2024First promiseDec 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed71 files

Current status

11%7 of 66 units booked
46.8%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Space GrandeurNA101064266

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

Space Grandeur: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,124 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Vakola Rising Sun Co Operative Housing Society LtdGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI4499.7
Proposed, not sanctioned3,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No -509 Sharada 32nd Floor Opp R D National College Bandra West Mumbai -400050
Estimated costRs 17.00 cr
Cost incurredRs 7.96 cr
Work done46.8%
BuildingWingEstimatedIncurred
Space GrandeurNARs 16.15 crRs 7.96 cr
-NARs 85.00 lakh-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Core Architects
ArchitectVishaarad Architects
EngineerChirag Dilipkumar Jain
EngineerSubhash Mhatre
EngineerS K Consultants And Engineers
EngineerSUBHASH GOVIND MHATRE
Chartered AccountantMs Pratiksha Tulshyan & Associates
Chartered AccountantPRANAV BHASKARAN & ASSOCIATES
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Space Builder & Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27072621878Dec 2026 → Jun 2027

Reason as filed by the promoterThe delay has occurred due to the fact that the finishing works of the project, including internal and external finishing activities such as plastering, flooring, painting, installation of fixtures, fittings, and allied infrastructure works, are still in progress and are expected not to be completed by December as initially planned. These activities are dependent on multiple sequential stages of execution and coordination among various specialized agencies and contractors, which has resulted in slower-than-anticipated progress at the final stage of construction. Further, availability of skille

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf6 Aug 2026
Withdrawal Update Form 1File: Form 1 June 2026 Signed.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 June 2026 Signed.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 June 2026 Signed.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2026.pdf27 Jul 2026
Withdrawal Update Form 3File: Space Grandeur Form 3 June 2026.pdf27 Jul 2026
Withdrawal Update Form 3File: Space Grandeur Form 3 June 2026.pdf27 Jul 2026
Withdrawal Update Form 3File: Space Grandeur Form 3 June 2026.pdf27 Jul 2026
Form 1File: Form 1 - Space Grandeur March 2026.pdf22 Jul 2026
Form 2File: Form 2 - Space Grandeur March 2026.pdf22 Jul 2026
Form 3File: Form 3 - Space Grandeur March 2026.pdf22 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Space Grandeur March 2026.pdf22 Jul 2026
Form 1File: Form 1 - Space Grandeur June 2026.pdf22 Jul 2026
Form 2File: Form 2 - Space Grandeur June 2026.pdf22 Jul 2026
Form 3File: Form 3 - Space Grandeur June 2026.pdf22 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Space Grandeur June 2026.pdf22 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A Space Grandeur for FY 24-25.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Space Grandeur for FY 25-26.pdf7 Jul 2026
Form 1File: Form 1 - Space Grandeur as on March 2025.pdf5 Sep 2025
Form 2File: Form 2 - Space Grandeur as on March 2025.pdf5 Sep 2025
Form 3File: Form 3 - Space Grandeur as on March 2025.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Space Grandeur as on March 2025.pdf5 Sep 2025
Form 1File: Form 1 - Space Grandeur as on December 2024.pdf5 Sep 2025
Form 2File: Form 2 - Space Grandeur as on December 2024.pdf5 Sep 2025
Form 3File: Form 3 - Space Grandeur as on December 2024.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Space Grandeur as on December 2024.pdf5 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Other - Finance.pdf19 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Pilith CC Ms Space Builder Developers HE -Ward.pdf18 Oct 2024
Other - FinanceFile: Space Builder And Developers Declartion (1).pdf18 Oct 2024
Building plan approvalFile: Page 6 -Space Grandeur.pdf10 Oct 2024
Building plan approvalFile: Page 5 -Space Grandeur.pdf10 Oct 2024
Building plan approvalFile: PAGE 4 Space grandeur_11zon (1).pdf10 Oct 2024
Building plan approvalFile: Page 3 Space Grandeurr.pdf10 Oct 2024
Building plan approvalFile: Page 2 Space Grandeur.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PAGE 4 Space grandeur_11zon (1).pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 2 Space Grandeur.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 3 Space Grandeurr.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 5 -Space Grandeur.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 6 -Space Grandeur.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: SPACE FINANCE.pdf31 Jul 2024
Details of encumbrances concerned to FinanceFile: SPACE LEGAL.pdf31 Jul 2024
Details of encumbrances concerned to LegalFile: SPACE FINANCE.pdf31 Jul 2024
Details of encumbrances concerned to LegalFile: SPACE LEGAL.pdf31 Jul 2024
Other - LegalFile: LLP DEED_SPACE INDIA BUILDERS DEVELOPERS LLP.pdf30 Jul 2024
Building plan approvalFile: Page 1 Space Garndeur - Copy.pdf22 Jul 2024
Layout approvalFile: Page 1 Space Garndeur.pdf22 Jul 2024
Copy of the legal title reportFile: Legal Title Report - Vakola.pdf22 Jul 2024
Copy of Layout Approval (in case of layout)File: Page 1 Space Garndeur.pdf22 Jul 2024
Proforma of Allotment letterFile: Allotment _Space Grandeur_Space Builder and Developer_06092024.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1st Certificate before registration SIGNED.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised with type of flat.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Space Grandeur- as on 27_07_2024 SIGNED (2).pdf22 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 1 Space Garndeur - Copy.pdf22 Jul 2024
Declaration about Commencement CertificateFile: Declaration Format D.PDF22 Jul 2024
Proforma of Agreement for saleFile: AFS_Space Grandeur_Space Builder and Developer_06092024 Final Agreement.pdf22 Jul 2024
PAN CardFile: sbd pan card.pdf18 Jul 2024
Declaration in FORM BFile: Form B -Promoter.pdf18 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Space Grandeur CC.pdf18 Jul 2024
CERSAI detailsFile: 1 CERSAI details (1).pdf18 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A -Revised.pdf18 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Report -Allotment.pdf18 Jul 2024
Other - TechnicalFile: 1 Other - Technical (16).pdf18 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report (4).pdf18 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (14).pdf18 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -REVISED.pdf18 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declaration of Secured Unsecured Fianance.pdf18 Jul 2024

How this compares with Mumbai Suburban

11%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Space Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Santacruz East6,700+ in Mumbai Suburban

2 kmSpace GrandeurCompleted 98Lapsed / revoked 60Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 284 registered projects within 2 km.

Builder: Space Builder & Developers

Space Builder & Developers has 1 registration on MahaRERA, including Space Grandeur. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Space Grandeur is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Space Grandeur?

The registered promoter entity is Space Builder & Developers, a partnership as per the filing. Its GSTIN 27ADAFS2131B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Space Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Space Grandeur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Space Grandeur?

The professionals named in the filing: Architect: Design Core Architects; Architect: Vishaarad Architects; Engineer: Chirag Dilipkumar Jain; Engineer: Subhash Mhatre; Engineer: S K Consultants And Engineers; Engineer: SUBHASH GOVIND MHATRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Space Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Space Grandeur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Space Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.