Red flags

  • 7 complaints at RERA Karnataka
  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • Separate project account declared
Dec 2023Possession promisedmoved 36 months from the original
7Complaints at RERA Karnatakaon this registration
Jump to the 133 documents Report an error

SOWPARNIKA COLUMNS is a Residential/Group Housing project by SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/171024/000764 on 24 Oct 2017. Possession is promised by 15 Dec 2023. The completion date has moved by 36 months from the original filing. 7 complaints are on record with the regulator.

At a glance

Project

  • NameSOWPARNIKA COLUMNS
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/304/PR/171024/000764
  • ReraGenie IDRG-KA-95327

Builder

  • NameSOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.
  • Entity typeCompany
  • CINU45201KA2007PTC043166
  • Authorized SignatoryMEENAKSHI RAMJI
  • OthersMOHAMAD ZEAULLA
  • Other registrations3 more →

Key dates

this monthRegisteredOct 2017First promiseDec 2020Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Oct 2017
  • Promised completion15 Dec 2023
  • Revised completionRevised to 15 Dec 2023 (originally 31 Dec 2020)
  • Buildings1 building record
  • Documents filed133 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---3900390

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 23 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 23 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,687 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 52.43 cr

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2020 → Jun 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1250/304/PR/210401/000764Jun 2022 → Dec 2021

Reason as filed by the promoterApplied for modification

ExtensionDec 2021 → Dec 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka7

Case no.ComplainantRespondentFiled
CMP/201201/0007151-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.01/12/2020
CMP/201201/0007152-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.01/12/2020
CMP/210803/0008202-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.03/08/2021
CMP/220818/0009913-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.18/08/2022
CMP/220915/0010018-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.15/09/2022
CMP/221104/0010181-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.04/11/2022
00745/2024-SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.19/08/2024

Documents filed133

As listed on the registration, under the names the promoter filed them with; the newest 80 of 133 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/171024/000764 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Sowparnika Columns Quarterly Update from Q3 (2018-19) to Q3 (2020-21)File: Columns QU till Q3 ( 2020-21).pdf23 Mar 2021
Sowparnika Columns Quarterly Update from Q3 (2018-19) to Q3 (2020-21)File: Columns QU till Q3 ( 2020-21).pdf23 Mar 2021
RERA Order approving the modification of sanction plans for 390 units for Sowparnika ColumnsFile: Sowparnika Columns - Order for Approval of Modification of Plan.pdf25 Feb 2021
Mail from RERA approving the modification of sanction plans for 390 units for Sowparnika ColumnsFile: Sowparnika Columns - Mail Approving the Modification of Plans.pdf25 Feb 2021
BHK wise break-up of units as per Original Plan and modified plan for Sowparnika ColumnsFile: Sowparnika Columns - RERA - BHK Details.xlsx25 Feb 2021
Checklist for Project Extension as Circular dated 17.12.2019File: Sowparnika Columns - Checklist for Project Extension as per Circular.xlsx22 Sep 2020
Sold and Unsold unitsFile: Columns Sold -Un sold units.pdf22 Sep 2020
CA certificate for funds utilised towards completion of workFile: Fund utilisation.pdf22 Sep 2020
CA certificate for funds required for pending workFile: Funds required.pdf22 Sep 2020
Architect certificate for percentage of pending work as on date.File: Architect Certificate.pdf22 Sep 2020
Engineer certificate for percentage of completion of work and pending work as on dateFile: Engineer Certificate-PRJCT-COLUMNS-21-9-2020.pdf22 Sep 2020
Affidavit sworn before notary for taking responsibility of paying compensationFile: RERA Affidavit.pdf22 Sep 2020
CertificateFile: 2 SPIPL - COI.jpeg-
Project Details-
Already registered project ongoing detailsFile: Ongoing Projects.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: 3 Site Plan.pdf-
Elevation, Sections, Specifications ( If changes are there )File: 7 Elevation and Section.pdf-
List Of AllotteesFile: List of Allottees.pdf-
List Of ComplaintsFile: LIST OF COMPLAINTS.pdf-
Consent LetterFile: Consent letter.pdf-
List Of Pending LitigationsFile: LIST OF PENDING LITIGATIONS.pdf-
Chartered Accountant CertificateFile: Form 4 CA CERTIFICATE.pdf-
Notarized AffidavitFile: Sowparnika Columns - Affidavit Cum Declaration.pdf-
Engineer CertificateFile: Form 6 Engineer Certificate.pdf-
Architect CertificateFile: Form 5 Architect Certificate.pdf-
Structural Engineer Certificate for stability of structureFile: COLUMNS STRUCTURAL STABILITY CERTIFICATE 8-9-2020.pdf-
Modification of Plan DetailsFile: Sowparnika Columns - Development Plan.pdf-
Modification of Plan DetailsFile: Sowparnika Columns - Development Plan.pdf-
Modification of Plan DetailsFile: Columns - Commencement Certificate - Old.pdf-
Modification of Plan DetailsFile: Columns - Commencement Certificate.pdf-
Modification of Plan DetailsFile: Columns Sold -Un sold units.pdf-
Modification of Plan DetailsFile: Columns Sold -Un sold units.pdf-
Document 1File: Columns - Revised Fire NOC.pdf-
Document 2File: Columns - NOC - AAI.pdf-
Document 3File: Columns - Revised BESCOM NOC.PDF-
Document 4File: Columns - Revised KSPCB NOC.PDF-
Document 5File: Columns - NOC - BSNL.pdf-
Document 6File: Columns - NOC - Panchayat Water.pdf-
Document 7File: Columns - Revised MOEF - Corrigendum.jpg-
Basement 1( Upper) Floor PlanFile: 1 Basement 1( Upper) Floor Plan.pdf-
Basement 2 ( Lower) Floor PlanFile: 2 Basement 2 ( Lower) Floor Plan.pdf-
Typical Floor PlanFile: 4 Typical Floor Plan.pdf-
Ground Floor PlanFile: 5 Ground Floor Plan.pdf-
Terrace Floor PlanFile: 6 Terrace Floor Plan.pdf-
Fee Receipt for Rs. 63435File: Sowparnika Columns - Fee Receipt for Rs. 63435.pdf-
Designated Bank Account Statement - Part IFile: Sowparnika Columns - Designated Bank Account - HDFC Account No. 0222 - Part I.pdf-
Designated Bank Account Statement - Part IIFile: Sowparnika Columns - Designated Bank Account - HDFC Account No. 0222 - Part II.pdf-
Designated Bank Account Statement - Part IIIFile: Sowparnika Columns - Designated Bank Account - HDFC Account No. 0222 - Part III.pdf-
Quarterly Update screenshot of RERAFile: Sowparnika Columns - Quarterly Update - Screenshot.PNG-
Abtract of Inventory of different types of BHK as per Original Plan and Modified PlanFile: Sowparnika Columns BHK Type as per Old and Modified Plans.pdf-
Development Details - Exclusive Open Terrace Area - ClarificationFile: Sowparnika Columns - Development Details - Exclusive Open Terrace Area - Clarification.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate - Work Completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate - Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate - Fund Utilised.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate - Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate - Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate - Fund Required.pdf-
AffidavitFile: RERA - Form B for Extension - Signed.pdf-
Latest Encumbrance CertificateFile: Columns - EC-min.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and Unsold Details.xlsx-
NOC DetailsFile: Columns - Revised KSPCB N.pdf-
Document 1File: Delay RERA Letter.pdf-
Document 2File: RERA Affidavit US 18.pdf-
Document 3File: Revised Plan.pdf-
Document 4File: Sowparnika Columns - Collection ESCROW AC - Full.pdf-
Document 5File: Commencement Certificate.pdf-
Document 6File: Columns - Revised BESCOM NOC.pdf-
Document 7File: Columns - Revised Fire NOC.pdf-
Document 8File: Columns - Revised KSPCB NOC.pdf-
Document 9File: Columns - Revised MOEF - Corrigendum.jpg-
Document 10File: 808 - Customer Agreement Scan.pdf-
Document 11File: 1322 - Customer Agreement Scan.pdf-
Document 12File: G10 - Customer Agreement Scan.pdf-
Document 13File: Sowparnika - Customer's Consent for Extension.pdf-
Document 14File: Form B.pdf-
Document 15File: Revised Plan.pdf-
Document 16File: Sowparnika Columns - Letter to RERA Authority.pdf-
Document 17File: Sowparnika - Customer's Consent for Extension.pdf-
Document 18File: Under Section 18 Affidavit.pdf-
Document 19File: Revised Plan.pdf-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 36 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep SOWPARNIKA COLUMNS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD.

SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. has 4 registrations on RERA Karnataka, including SOWPARNIKA COLUMNS and SOWPARNIKA PURPLE ROSE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if SOWPARNIKA COLUMNS is delayed beyond 15 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOWPARNIKA COLUMNS?

The registered promoter entity is SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD., a company as per the filing. Its CIN U45201KA2007PTC043166 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOWPARNIKA COLUMNS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SOWPARNIKA COLUMNS?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in SOWPARNIKA COLUMNS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOWPARNIKA COLUMNS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOWPARNIKA COLUMNS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.