Registration lapsed No litigation declared Residential / Group Housing project

SOMVIJAY PRIDE

By RAJENDRA VASANTRAO KHANKARI

RG-MH-60427 · RERA P49800048643 · Last updated on MahaRERA portal: 5 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 21 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.
Jan 2025Possession promised21 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

SOMVIJAY PRIDE is a Residential / Group Housing project by RAJENDRA VASANTRAO KHANKARI in Dhule, Maharashtra, registered with MahaRERA as P49800048643 on 10 Jan 2023. Possession was promised by 31 Jan 2025 and is now 21 months past that date.

At a glance

Project

  • NameSOMVIJAY PRIDE
  • TypeResidential / Group Housing
  • Location
    • JAMANAGIRI ROAD
    • ASHOK NAGAR
    • Dhule (M Corp.)
    • Dhule
    • 424001
  • Pincode424001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49800048643
  • ReraGenie IDRG-MH-60427

Builder

  • NameRAJENDRA VASANTRAO KHANKARI
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

21 months past promisethis monthRegisteredJan 2023PromisedJan 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Jan 2023
  • Promised completion31 Jan 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOMVIJAY PRIDENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SOMVIJAY PRIDE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered16
Open Space18

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area609 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VIMAL DEVELOPERS PROP. RAJENDRA VASANTRAO KHANKARIDhule (M Corp.)Dhule
MR SOMNATH BHIKA BAGADDhule (M Corp.)Dhule

Approvals and building plan

Permissible FSI1586.95
Proposed, not sanctioned1,587 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLANE NO 6 DHULE

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIVAR CONSCTRUTIONS
EngineerHEMANT B ISAI
EngineerABHAY V BHADALIKAR
Chartered AccountantS S PASARI AND CO
Chartered AccountantCA Ankita S Runwal & Co
Chartered AccountantNeha R Agrawal & Co
PartnerRole in project
RAJENDRA VASANTRAO KHANKARI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEW MARCH 2024.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEW FORM 1 2024.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEW FORM1 2024.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEW 1 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM 2 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM NO 2 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 1 NEW 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM 2 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM 2 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW FORM 2 2024.pdf5 Jun 2025
Status of ConveyanceFile: 188 17032025.pdf5 Jun 2025
Other - TechnicalFile: NEW FORM 2A 2024.pdf5 Jun 2025
Other - TechnicalFile: NEW FORM 2A 2024.pdf5 Jun 2025
Other - TechnicalFile: NEW FORM 2A 2024.pdf5 Jun 2025
Other - TechnicalFile: NEW 2A 2024.pdf5 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NEW FORM 2A 2024.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA from 3.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Mar 2024.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form June 2024.pdf11 Mar 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Delceration Deed 03 (1).pdf21 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Delceration Deed 04 (1).pdf21 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Delceration Deed 02 (1).pdf21 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Delceration Deed 01 (1).pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Forn no 2.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 02.pdf18 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complection Certificate.pdf18 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form no 04.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosed inventery.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: IMG_20250218_0044_NEW.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: IMG_20250218_0045_NEW.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: IMG_20250218_0046_NEW.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: IMG_20250218_0047_NEW.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: forn no 1.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2.pdf21 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf21 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: IMG_20231221_0001_NEW.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 JUNE 2023_compressed.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 SEP2023_compressed.pdf16 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 2023.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 2023.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 2023.pdf17 May 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTRY MARCH 2023.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3 March 20233.pdf15 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organzations.pdf3 Jan 2023
Proforma of Agreement for saleFile: Draft of Areement to Sale (RERA)2023.pdf3 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Modal form of agreement for sale_.pdf3 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEW CA CERTIFICATE 2022.pdf28 Dec 2022
Deviation Report with respect to Allotment letterFile: allotment letter model copy_.pdf18 Dec 2022
Copy of the legal title reportFile: legal tital report.pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: Flow of Land.pdf7 Dec 2022
Details of encumbrances concerned to LegalFile: Flow of Land.pdf7 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf7 Dec 2022
Layout approvalFile: Lay Out.pdf25 Nov 2022
Building plan approvalFile: Building Plan.pdf25 Nov 2022
PAN CardFile: PAN - RVK.pdf25 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate.pdf25 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrances Certificate.pdf25 Nov 2022
Copy of Layout Approval (in case of layout)File: Lay Out.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencment certificate.pdf25 Nov 2022
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf25 Nov 2022
Declaration in FORM BFile: Form B.pdf25 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Certificate.pdf25 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf25 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH APARMENTS NO 71 1 KESHAR NAGAR DEOPUR DHULE7CompletedMar 2015Mar 2015

How this compares with Dhule

21%of Dhule projects moved their completion datethis one has not
30%of Dhule registrations have lapsed or been cancelledthis one is among them

Computed across the 71 Dhule projects on ReraGenie, from their own filings.

Keep SOMVIJAY PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ASHOK NAGAR71 in Dhule

2 kmSOMVIJAY PRIDECompleted 8Lapsed / revoked 6Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: RAJENDRA VASANTRAO KHANKARI

RAJENDRA VASANTRAO KHANKARI has 3 registrations on MahaRERA, including VASUDHA VIHAR and RAMKRISHNA APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Dhule district page.

Frequently asked questions

What does it mean that SOMVIJAY PRIDE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SOMVIJAY PRIDE is delayed beyond 31 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOMVIJAY PRIDE?

The registered promoter entity is RAJENDRA VASANTRAO KHANKARI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOMVIJAY PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOMVIJAY PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOMVIJAY PRIDE?

The professionals named in the filing: Architect: NIVAR CONSCTRUTIONS; Engineer: HEMANT B ISAI; Engineer: ABHAY V BHADALIKAR; Chartered Accountant: S S PASARI AND CO; Chartered Accountant: CA Ankita S Runwal & Co; Chartered Accountant: Neha R Agrawal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOMVIJAY PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOMVIJAY PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOMVIJAY PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.