Completed No litigation declared Mixed project

SOMESHWAR VASTU NIRMITI

By SOMESHWAR VASTU NIRMITI

RG-MH-27513 · RERA P52700034424 · Last updated on MahaRERA portal: 2 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
22 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SOMESHWAR VASTU NIRMITI is a Mixed project by SOMESHWAR VASTU NIRMITI in Satara, Maharashtra, registered with MahaRERA as P52700034424 on 5 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 10 months from the original filing. 11 of the 33 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSOMESHWAR VASTU NIRMITI
  • TypeMixed
  • Location
    • VADUJ
    • Khatav
    • Satara
    • 415506
  • Pincode415506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700034424
  • ReraGenie IDRG-MH-27513

Builder

  • NameSOMESHWAR VASTU NIRMITI
  • Entity typePartnership

Key dates

this monthRegisteredApr 2022First promiseFeb 2025Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 28 Feb 2025)
  • Buildings1 building record
  • Documents filed59 files

Current status

33%11 of 33 units booked
103.4%Work done, per cost certificate

Figures as on 2 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOMESHWAR VASTU NIRMITINA54141832

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SOMESHWAR VASTU NIRMITI82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area680 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHIVAJI RAMCHANDRA GODASEVadujSatara
MAHADEV RAMCHANDRAGODASEVadujSatara

Approvals and building plan

Sanctioning authorityVADUJ NAGARPANCHYAT
Permissible FSI882.98
Proposed, not sanctioned883 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVADUJ
Estimated costRs 1.33 cr
Cost incurredRs 1.37 cr
Work done103.37%
BuildingWingEstimatedIncurred
SOMESHWAR VASTU NIRMITINARs 1.33 crRs 1.37 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPURUSHOTTAM B PATIL
EngineerMAYUR GAIKWAD
Chartered AccountantCA JIVAN V JAGTAP
Chartered AccountantHARSHVARDHAN JAIDEEP JADHAV
PartnerRole in project
SOMESHWAR VASTU NIRMITI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700028293Feb 2025 → Dec 2025

Reason as filed by the promoterProject is still incomplete hence we request further time for the completion of project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2026

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: MAIL.pdf2 Apr 2026
Occupational CertificateFile: Occupancy Certificate.pdf27 Mar 2026
Completion CertificateFile: Occupancy Certificate.pdf27 Mar 2026
Occupational CertificateFile: Letter Signed.pdf27 Mar 2026
Withdrawal Update Form 1File: FORM A.pdf26 Mar 2026
Withdrawal Update Form 2File: FORM B.pdf26 Mar 2026
Withdrawal Update Form 3File: FORM 3 SIGNED.pdf26 Mar 2026
Form 1File: FORM A.pdf21 Nov 2025
Form 2File: FORM B.pdf21 Nov 2025
Form 3File: FORM 3 Q2 FY 25-26.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY_SCANNED.pdf21 Nov 2025
Form 1File: FORM A.pdf25 Oct 2025
Form 2File: FORM B.pdf25 Oct 2025
Form 3File: SCANNEND AND SIGNED FORM 3.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf25 Oct 2025
Form 5 (FY 2024-2025)File: form 5 final.pdf30 Sep 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 SIGNED.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4_11zon.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 CA Q1 scanned.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 Signed_11zon.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SIGNED.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOMESHWAR VASHTU NIRMITI FORM 3.pdf23 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SOMESHWAR VASTU NIRMITI.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL (2)_11zon.pdf31 Mar 2022
Proforma of Allotment letterFile: ALLOTMENTLETTER.pdf31 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: bandhkam paravana_11zon.pdf26 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc sa_11zon.pdf24 Mar 2022
Layout approvalFile: 2_3_2_4_merged_11zon.pdf17 Mar 2022
Copy of Layout Approval (in case of layout)File: 2_3_2_4_merged_11zon.pdf17 Mar 2022
Declaration in FORM BFile: SOMESHWAR NA.pdf17 Mar 2022
Proforma of Allotment letterFile: SALEDEED.pdf17 Mar 2022
Copy of the legal title reportFile: Legal Title report Final.pdf16 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231278284_For_Asset_Based_Search_28_02_2022_12_25_24_121.pdf28 Feb 2022
Building plan approval or NA orderFile: Plan.pdf26 Feb 2022
PAN CardFile: PARTNERSHIP PAN_compressed.pdf26 Feb 2022
Details of encumbrancesFile: ENCOMBRANCES.pdf26 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf26 Feb 2022
Declaration about Commencement CertificateFile: DELECRATION CERTIFICATE.pdf26 Feb 2022

How this compares with Satara

33%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 10 months
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SOMESHWAR VASTU NIRMITI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADUJ1,100+ in Satara

Builder: SOMESHWAR VASTU NIRMITI

SOMESHWAR VASTU NIRMITI has 1 registration on MahaRERA, including SOMESHWAR VASTU NIRMITI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if SOMESHWAR VASTU NIRMITI is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOMESHWAR VASTU NIRMITI?

The registered promoter entity is SOMESHWAR VASTU NIRMITI, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOMESHWAR VASTU NIRMITI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOMESHWAR VASTU NIRMITI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOMESHWAR VASTU NIRMITI?

The professionals named in the filing: Architect: PURUSHOTTAM B PATIL; Engineer: MAYUR GAIKWAD; Chartered Accountant: CA JIVAN V JAGTAP; Chartered Accountant: HARSHVARDHAN JAIDEEP JADHAV. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOMESHWAR VASTU NIRMITI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOMESHWAR VASTU NIRMITI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOMESHWAR VASTU NIRMITI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.