Registration approved Litigation declared Residential/Group Housing project

Sobha Brooklyn Towers - Town Park Phase 4, W4

By SOBHA LIMITED

RG-KA-31454 · RERA PRM/KA/RERA/1251/308/PR/270922/005269 · Last updated on RERA Karnataka portal: 13 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2029Possession promisedno revision filed
3 of 18Construction stages donefurthest along: Basic work of Water supply, 87%
0 of 99Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 159 documents Report an error

Sobha Brooklyn Towers - Town Park Phase 4, W4 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/270922/005269 on 27 Sep 2022. Possession is promised by 30 Jun 2029. 99 of the 99 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.

At a glance

Project

  • NameSobha Brooklyn Towers - Town Park Phase 4, W4
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562106
  • Pincode562106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/270922/005269
  • ReraGenie IDRG-KA-31454

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryMr. Suresh Ganiga
  • Managing DirectorMr Jagadish Nangineni
  • DirectorsRavi P N C Menon, Mr Jagadish Nangineni
  • Project HeadMr.Yatheesha
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredSep 2022PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Sep 2022
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed159 files

Current status

100%99 of 99 units booked
48.1%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
wing 4---99099

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete. The stage furthest along is Basic work of Water supply, at 87%.

Building: 35% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level30%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure100%
Masonry Construction54%
Plastering inside , outside & Ceiling72%
Joinery: Doors, Windows, Ventilators etc2%
Basic work of Water supply, Sanitary and Electrification87%
Dadoing, Skirting, Flooring, Tiles work (All types)23%
Railing and Grill fixing32%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network30%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes15%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes10%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes2%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes10%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesYes100%
Common entrance and exit for the building/common portico/foyer/verandahYes69%
BasementNoNot applicable
TerraceYes25%
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,385 sq m
Named landowners6
LandownerVillageDistrict
M/s. Urban Space Projects Private Limited--
M/s. Urban Space Projects Private Limited--
M/s. Urban Space Projects Private Limited--
A.G.Hemanth Kumar--
T.Shivaraj--
A.G.Hemanth Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 110.30 cr
Cost incurredRs 53.11 cr
Spent of the estimate48.15%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 79.41 crRs 41.09 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 16.49 crRs 96,139
Payment of taxesRs 8.84 crRs 9.67 cr
On-site expenditure-Site OverheadRs 5.56 crRs 2.35 cr
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 1-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArun Kumar
EngineerMr.HAREESH GOWDA
Chartered AccountantBalaji D

Litigation declaredYes

The promoter declares litigation on this registration. The case records are in the filed documents.

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed159

As listed on the registration, under the names the promoter filed them with; the newest 80 of 159 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/270922/005269 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 4 C.pdf13 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn Ph4.pdf13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Ph4.pdf13 Oct 2026
Q2 2026-27 Water supply and sewage board13 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Oct 2026
Q2 2026-27 KPTCL- BESCOM13 Oct 2026
Q2 2026-27 Fire and Safety13 Oct 2026
Q2 2026-27 Registration documentFile: Brooklyn DOD C.pdf13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 4.pdf10 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Brooklyn PH4.pdf10 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 4.pdf10 Jul 2026
Q1 2026-27 Water supply and sewage board10 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)10 Jul 2026
Q1 2026-27 KPTCL- BESCOM10 Jul 2026
Q1 2026-27 Fire and Safety10 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 4.pdf10 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Brooklyn Phase 4.pdf10 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn Phase 4.pdf10 Apr 2026
Q4 2025-26 Water supply and sewage board10 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)10 Apr 2026
Q4 2025-26 KPTCL- BESCOM10 Apr 2026
Q4 2025-26 Fire and Safety10 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Brooklyn Phase 4.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Sobha Brooklyn PH 4.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Brooklyn PH 4.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
Status of the projectFile: 1 Status of the projects.pdf19 Sep 2022
Plan area is not matched please clarifyFile: 3 Plan area.pdf19 Sep 2022
Need to upload RTC and MR for all syno obtained from revenue department officeFile: 4 RTC and MR c.pdf19 Sep 2022
Need title deed to urban spaces for syno 51 ext 2.30 51/2 ext 0.7.02 guntas ,52/1 ext 2acres 30guntFile: Sy no 51 1 Merged compressed.pdf19 Sep 2022
Need title deed to 52/2 ext 1 acre 13 guntas to t shivrajaFile: Sy no 52 2 Merged compressed.pdf19 Sep 2022
Need title deed to a g hemantha kumar for syno 52/2ext 10guntasFile: Sy no 52 2 Merged compressed.pdf19 Sep 2022
Need title deed to a g hemanth kumar for syno 53 ext acre 15 guntasFile: Sy no 53 merged.pdf19 Sep 2022
For syno 51/2 title deed uploaded for 2.02 guntas but we need title deed for another 5guntas alsoFile: Sy No 51 2 Merged compressed.pdf19 Sep 2022
Need sale deed to promoter for syno 53(uploaded sale deed for syno 43) from l mahesh and others to aFile: Sy no 53 merged.pdf19 Sep 2022
litigation affidavitFile: Affidavits ph4 w4.pdf19 Sep 2022
Need hissa phody copyFile: 12 Hissa phody copy.pdf19 Sep 2022
Need akarband and survey sketchFile: 13 Akarband and survey sketch.pdf19 Sep 2022
Need notarized Non- litigation affidavitFile: Non litigation Affidavits ph4 w4.pdf19 Sep 2022
Area details the project details page not matching with the Approved PlanFile: 16 Total area covers area and open area.pdf19 Sep 2022
Upload certified Carpet area calculationFile: SBT Wing 4.pdf19 Sep 2022
Upload Development planFile: 18 Modified DP Yadavanahalli.pdf19 Sep 2022
Upload Development Plan OrderFile: 19 Modified DP work order dt 15072022.pdf19 Sep 2022
Built up area / Number of units in the KSPCB NOC is not matching with the sanction PlanFile: KSPCB NOC with corrigendum.pdf19 Sep 2022
Upload relinquishment deed (Road widening area)File: Relinquishment Deed c submitted.pdf19 Sep 2022
Upload CDP map showing Nala Buffer and the proposed RoadFile: 22 CDP MAP WITH SITE.pdf19 Sep 2022
Upload Village map Showing the Nala in the proposed siteFile: 23 Village map.pdf19 Sep 2022
Height of the building mentioned in the Project details page is not matching with the sanction planFile: 24 Height of the building.pdf19 Sep 2022
Upload Building licenseFile: Revised Plan sanction letter dt 01092022.pdf19 Sep 2022
Upload Commencement certificateFile: Revised Plan sanction letter dt 01092022.pdf19 Sep 2022
Upload Complete SEIAA NOC (Only Corrigendum Uploaded)File: SEIAA NOC.pdf19 Sep 2022
Upload the Phase wise Demarcation of the DrawingFile: SBT SITE PLAN PHASE 04 WING 04.pdf19 Sep 2022
Updated Area details may not be correct, please update the plinth area details properlyFile: 29 Plinth area.pdf19 Sep 2022
Please upload the copy of fee paid receipt paid towards BESCOM NOC and water supply NOCFile: BESCOM and BWSSB NOC and fee paid receipts.pdf19 Sep 2022
Provision of STP in the projectFile: STP layout and tech writup.pdf19 Sep 2022
Please upload the Proforma of Allotment LetterFile: 33 Proforma of Allotment Letter.pdf19 Sep 2022
Please upload the legible copy of Fire force NOCFile: Fire NOC.pdf19 Sep 2022
RTC, survey 51/1-
Mutation, survey 51/1-
Encumbrance Certificate, survey 51/1-
Conversion/Alienation Order, survey 51/1-
Sale/Title/Gift Deed, survey 51/1-
JDA, survey 51/1-
Khatha, survey 51/1-
RTC, survey 51/2-
Mutation, survey 51/2-
Encumbrance Certificate, survey 51/2-
Conversion/Alienation Order, survey 51/2-
Sale/Title/Gift Deed, survey 51/2-
JDA, survey 51/2-
Khatha, survey 51/2-
RTC, survey 52/1-
Mutation, survey 52/1-
Encumbrance Certificate, survey 52/1-
Conversion/Alienation Order, survey 52/1-
Sale/Title/Gift Deed, survey 52/1-
JDA, survey 52/1-
Khatha, survey 52/1-
RTC, survey 52/2-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

29 not delivered by the promised date10 under way, not due yet36 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Royal crest LitigationBBMP KATHA NO. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2, 38/5, 79, 80/1, BENGALURU SOUTH, BENGALURU URBANOngoingDec 2028Not due yet
Sobha Manhattan Towers - Town Park Phase 2, Wing 1 and 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingJun 2027Not due yet
Sobha Sentosa Phase 2 Wing 5 and 6 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2026Not due yet
Sobha Manhattan Towers - Town Park Phase 1, Wing 4 and 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Sentosa Phase 1 Wing 7 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA"OngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered
Sobha Windsor Phase 1 Wing 1 and 2 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2025Not delivered
Sobha Rajvilas LitigationSy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation roadOngoingMar 2025Not delivered
Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 LitigationBalagere, BangaloreOngoingMar 2025Not delivered
Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Gardens Phase 1 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingNov 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 LitigationBalagere, BangaloreOngoingSep 2024Not delivered
Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 2 - Wing 4 and 5 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Royal Pavilion Phase 1 - Wing 6 and 7 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2024Not delivered
Sobha Lake Gardens Phase 1Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram HobliOngoingApr 2024Not delivered
Sobha Royal Pavilion Phase 3 - Wing 16 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingMar 2024Not delivered
Sobha Forest Edge02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, BengaluruOngoingJun 2023Not delivered
Sobha HRC Pristine Phase 4 Block 4 and 5 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 3 Block 3 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 2 Block 2 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha HRC Pristine Phase 1 Block 1 LitigationSurvey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, BengaluruOngoingApr 2023Not delivered
Sobha Dream Acres - Palm Springs Phase 16 Wing 50 LitigationBalagere, BangaloreOngoingMar 2023Not delivered
Sobha Arena - Pebble Court (Block 1) LitigationKanakapura Road, BangaloreOngoingJan 2023Not delivered
Sobha Arena - The Square (Block 4) LitigationKanakapura Road, BangaloreOngoingSep 2022Not delivered
Sobha Palm Court LitigationYelahanka, BangaloreOngoingFeb 2022Not delivered
Sobha Morzaria Grandeur 2 (W1)Dairy circle, BangaloreOngoingFeb 2022Not delivered
Sobha Silicon Oasis Wings 1, 2, 3, 4, 5, 6 LitigationHosa Road, BangaloreCompleted-No date filed

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Brooklyn Towers - Town Park Phase 4, W on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Brooklyn Towers - Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Brooklyn Towers - Town Park Phase 4, W4 is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Brooklyn Towers - Town Park Phase 4, W4?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Brooklyn Towers - Town Park Phase 4, W4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sobha Brooklyn Towers - Town Park Phase 4, W4?

The professionals named in the filing: Architect: Arun Kumar; Engineer: Mr.HAREESH GOWDA; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Brooklyn Towers - Town Park Phase 4, W4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Brooklyn Towers - Town Park Phase 4, W4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Brooklyn Towers - Town Park Phase 4, W to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.