SIGNATURE CNR MARVEL

By SIGNATURE DWELLINGS PRIVATE LIMITED

RG-KA-86998 · RERA PRM/KA/RERA/1251/308/PR/091026/009008 · Last updated on RERA Karnataka portal: 8 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2029Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

SIGNATURE CNR MARVEL is a Residential/Group Housing project by SIGNATURE DWELLINGS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/091026/009008 on 9 Oct 2026. Possession is promised by 31 Aug 2029.

At a glance

Project

  • NameSIGNATURE CNR MARVEL
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562106
  • Pincode562106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/091026/009008
  • ReraGenie IDRG-KA-86998

Builder

  • NameSIGNATURE DWELLINGS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70200KL2012PTC030293
  • GSTIN29AARCS0900K1Z1
  • Authorized SignatoryPRASANTH NARAYANAN
  • Managing DirectorPRASANTH NARAYANAN
  • DirectorsPRASANTH NARAYANAN, SEEMA PRASANTH
  • Project HeadPRASANTH NARAYANAN
  • Other registrations9 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2026PromisedAug 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Oct 2026
  • Promised completion31 Aug 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIGNATURE CNR MARVEL---1250125

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 8 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,093 sq m
Named landowners1
LandownerVillageDistrict
Manjunath N--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 71.10 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 55.00 cr-
Administrative CostsRs 8.00 cr-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 5.00 cr-
On-site expenditure-Consultants FeesRs 2.10 cr-
Payment of taxesRs 1.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANUJ GOPAKUMAR
EngineerYOGESH BABU M V
Chartered AccountantPraveen S Shettar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/091026/009008 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building LicneseFile: Building LICENSE.pdf8 Oct 2026
ADLR SketchFile: ADLR letter and sketch.pdf8 Oct 2026
Commencement CertificateFile: Commencement Certificate.pdf8 Oct 2026
Village Map DemarcationFile: Demarcation of Sy No in Village Map.pdf8 Oct 2026
Clarification for BrouchureFile: Clarification on Brochure-CNR MArvel.pdf8 Oct 2026
SR Value CopyFile: SR Value copy.pdf8 Oct 2026
Land Cost CalculationFile: LAND COST calculation Signature CNR MARVEL.pdf8 Oct 2026
STP DrawingsFile: Signature CNR Marvel STP Drawings.pdf8 Oct 2026
Specification and AmenitiesFile: Specification and Amenities -Signature CNR Marvel.pdf8 Oct 2026
Structural Stability Certificate with Engineer LicenseFile: Stability Certificate with Engineer License.pdf8 Oct 2026
Cost Estimation with Engineer LicenseFile: Cost Estimation with Engineer License.pdf8 Oct 2026
SEIAA NOCFile: SEIAA NOC.pdf8 Oct 2026
Sale Agreement DraftFile: SALE AGREEMENT DRAFT.pdf8 Oct 2026
Engineer License Self AttestedFile: Engineer License Self Attested.pdf8 Oct 2026
RTC, survey 13/5-
Mutation, survey 13/5-
Encumbrance Certificate, survey 13/5-
Conversion/Alienation Order, survey 13/5-
JDA, survey 13/5-
Khatha, survey 13/5-
Registration CertificateFile: Certificate of Incorporation.pdf-
Memorandum of AssociationFile: MOA.pdf-
Article of AssociationFile: AOA.pdf-
GST CertificateFile: GST Certificate.pdf-
Organization StructureFile: AOA.pdf-
Certificate issued by CA Form 1File: Form 1 - CA Report.pdf-
Certificate issued by Architect Form 2File: Form -2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non Litigation.pdf-
Balance Sheet 2024 - 2025File: Financials FY_2024-25.pdf-
Balance Sheet 2023 - 2024File: Financials FY_2023-24.pdf-
Balance Sheet 2022 - 2023File: Financials FY_2022-23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Financials FY_2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Financials FY_2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Financials FY_2022-23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR-VI_Acknowledgement_FY_2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR-VI_Acknowledgement_FY_2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR-VI_Acknowledgement_FY_2022-23.pdf-
Director's Report 2024 - 2025File: Directors Report FY-2023-24.pdf-
Director's Report 2023 - 2024File: Directors Report FY2023-24.pdf-
Director's Report 2022 - 2023File: DIRECTORS REPORT FY2022-23.pdf-
Cash Flow Statement 2024 - 2025File: Financials FY_2024-25.pdf-
Cash Flow Statement 2023 - 2024File: Financials FY_2023-24.pdf-
Auditor's Report 2024 - 2025File: Audit Report FY 2024-25.pdf-
Auditor's Report 2023 - 2024File: Audit Report FY 2023-24.pdf-
Auditor's Report 2022 - 2023File: Audit Report FY 2022-23.pdf-
SIGNATURE MARVEL CC ORDER COPY-
SITE PLAN-
BASMENT 1 & 2-
ALL FLOOR PLAN WITH SECTION & ELEVATION-
SINGLE SITE APPROVAL LETTER - Marvel-
Relinquishment Deed-
Allotment letter-
Form B-
Notarized Affidavit for 3(1) Voliation-
Joint Affidavit from Promoter and Landowner-
Legal Opinion of Signature CNR Marvel-
NOC from BESCOM-
Water NOC Marvel-
NOC from KSPCB - CFE-
Unnamed document-
Fire NOC - CNR Marvel-
NOC from AAI - CNR Marvel-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
REGISTERED GPA OF MARVEL-
Rectification Deed-
Release Deed-
Phodi Mutation-
CDP Plan and Village Map Demarcation-
SINGLE SITE SKETCH - Marvel-
SINGLE SITE APPROVAL LETTER - Marvel-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SIGNATURE CNR MARVEL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSIGNATURE CNR MARVELOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SIGNATURE DWELLINGS PRIVATE LIMITED

SIGNATURE DWELLINGS PRIVATE LIMITED has 10 registrations on RERA Karnataka, including SIGNATURE REGAL and SIGNATURE PREMIER. Its filings declare 6 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SIGNATURE CNR MARVEL is delayed beyond 31 Aug 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SIGNATURE CNR MARVEL?

The registered promoter entity is SIGNATURE DWELLINGS PRIVATE LIMITED, a company as per the filing. Its CIN U70200KL2012PTC030293 and GSTIN 29AARCS0900K1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SIGNATURE CNR MARVEL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SIGNATURE CNR MARVEL?

The professionals named in the filing: Architect: ANUJ GOPAKUMAR; Engineer: YOGESH BABU M V; Chartered Accountant: Praveen S Shettar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE CNR MARVEL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE CNR MARVEL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE CNR MARVEL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.