ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors

Completed No litigation declared Residential / Group Housing project

SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors

By Vastu Shilpa Complex Designers Pvt Ltd

RG-MH-81204 · RERA P51800008954 · Last updated on MahaRERA portal: 19 Aug 2019

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 23 documents Report an error

SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors is a Residential / Group Housing project by Vastu Shilpa Complex Designers Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008954 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameSMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors
  • TypeResidential / Group Housing
  • Location
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008954
  • ReraGenie IDRG-MH-81204

Builder

  • NameVastu Shilpa Complex Designers Pvt Ltd
  • Entity typeCompany
  • ChairpersonMohammedAli Haji Usman Momin
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed23 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SMGK ASSOCIATE RESIDENCY Wing B Phase 1- 1st to 16th FloorsNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

SMGK ASSOCIATE RESIDENCY Wing B Phase 1- 1st to 16th Floors: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 19 Aug 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Puzzle Parking SystemsYes100%
Stack Parking InstallationsYes100%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered100

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,450 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8017.93
Proposed, not sanctioned8,018 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAyesha Tower, SV Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH BHATT ARCHITECTS
ArchitectARCHITECT REZA KABUL
EngineerDWIJEN BHATT
PartnerRole in project
Vastu Shilpa Complex Designers Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed23

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Resi Ph 1.pdf19 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng resi ph1.pdf19 Aug 2019
Certificates of CA (Form 5)File: ca vscd 1-16.pdf19 Aug 2019
Certificates of CA (Form 5)File: 18-01-2018.pdf18 Jan 2019
Certificates of Architect (Form 4)File: Form 4.pdf18 Sep 2018
Certificates of Architect (Form 4)File: 2103201_OC_signed.pdf18 Sep 2018
Proforma of Allotment letterFile: Residency Agreement Draft.pdf23 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 260318.pdf26 Mar 2018
Building plan approvalFile: Approval Letter 8973.pdf23 Mar 2018
Building Plan Approval (IOD)File: Approval Letter 8973.pdf23 Mar 2018
Building plan approvalFile: AMMENDED IOD letter.pdf31 Jul 2017
Layout approvalFile: LAYOUT_PLAN_2013.pdf31 Jul 2017
PAN CardFile: VASTU PAN.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate 31E-9.pdf31 Jul 2017
Details of encumbrancesFile: FORM B-VSCD-Res-Phase 1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT_PLAN_2013.pdf31 Jul 2017
Building Plan Approval (IOD)File: AMMENDED IOD letter.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC VASTU.pdf31 Jul 2017
Declaration in FORM BFile: FORM B-VSCD-Res-Phase 1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - 290717.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Phase 1 1st to 16th Floors.pdf31 Jul 2017
Proforma of Allotment letterFile: Draft Allotment Letter-Res-Ph-1.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmSMGK ASSOCIATE RESIDENCYCompleted 85Lapsed / revoked 55Abeyance 1Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Vastu Shilpa Complex Designers Pvt Ltd

Vastu Shilpa Complex Designers Pvt Ltd has 2 registrations on MahaRERA, including SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors and SMGK ASSOCIATE RESIDENCY Wing B Phase 2 17th to 20th Floors. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors?

The registered promoter entity is Vastu Shilpa Complex Designers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors?

The professionals named in the filing: Architect: UMESH BHATT ARCHITECTS; Architect: ARCHITECT REZA KABUL; Engineer: DWIJEN BHATT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.