Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Feb 2025Possession promisedmoved 33 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 71 documents Report an error

SLV BRINDHAVAN is a Residential/Group Housing project by SLV BUILDERS AND DEVELOPERS in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/190809/002790 on 9 Aug 2019. Possession is promised by 22 Feb 2025. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameSLV BRINDHAVAN
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/190809/002790
  • ReraGenie IDRG-KA-29399

Builder

  • NameSLV BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • Authorized SignatoryRavindra Reddy Gorla
  • Other registrations2 more →

Key dates

this monthRegisteredAug 2019First promiseMay 2022Revised toFeb 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Aug 2019
  • Promised completion22 Feb 2025
  • Revised completionRevised to 22 Feb 2025 (originally 22 May 2022)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
S L V Brindavan---1970197

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities33

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,016 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectT.Gnanavel
EngineerAmbrish.G

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMay 2022 → Feb 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1250/304/PR/230419/002790Feb 2023 → Feb 2024

Reason as filed by the promoterShortage of Labour

ExtensionFeb 2024 → Feb 2025

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed71

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/190809/002790 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Firm registration certificate 2.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Architect Work Completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Architect Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate-Ex 3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate-EX-4.pdf-
AffidavitFile: affidavit form B_compressed.pdf-
Latest Encumbrance CertificateFile: EC Latest 17.pdf-
Consent letter from 2/3rd of AllotteesFile: DUE TO SPACE CONSTRAINT CONSENT LETTERS WE ARE UPLOADING IN BELOW ADDITIONAL DOCUMENTS.pdf-
Details Of Sold/ Un-sold UnitsFile: DUE TO SPACE CONSTRAINT CONSENT LETTERS WE ARE UPLOADING IN BELOW ADDITIONAL DOCUMENTS.pdf-
Document 1File: ilovepdf_merged (4).pdf-
Document 2File: unsold list_merged_compressed.pdf-
Document 3File: affidavit form ex-7.pdf-
Document 4File: noc 7.pdf-
Document 5File: noc 8.pdf-
Document 6File: SLV Commencement.pdf-
Document 7File: noc 6.pdf-
commencement certificate-
site and area plan-
site and area plan-
proforma sale deed-
draft sale agreement-
sale deed-
site and area plan-
site and area plan-
proforma allotment letter-
slv brocure-
slv brocure-
EC COPYS-
affidavit - 1-
affidavit - joint-
Khata-
JD-
sharing ageemnt-
Conversion order-
NOC - Fire-
NOC - AAI-
NOC - Bescom-
NOC pollution control board-
NOC Siea (1)-
Aproved building plan-
aproved site plan-
aproved site plan-
Conversion order-
Balance Sheet 2017 - 2018File: BS 2018 and 2019.pdf-
Balance Sheet 2016 - 2017File: BS 2017.pdf-
Balance Sheet 2015 - 2016File: disclaimer 2016.pdf-
Audited Profit and Loss Statement 2017 - 2018File: PL 2018 and 2019.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PL 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: disclaimer 2016.pdf-
Director's Report 2017 - 2018File: disclaimer 2018.pdf-
Director's Report 2016 - 2017File: disclamer 2017.pdf-
Director's Report 2015 - 2016File: disclaimer 2016.pdf-
Cash Flow Statement 2017 - 2018File: disclaimer 2018.pdf-
Cash Flow Statement 2016 - 2017File: disclamer 2017.pdf-
Auditor's Report 2017 - 2018File: disclaimer 2018.pdf-
Auditor's Report 2016 - 2017File: disclamer 2017.pdf-
Auditor's Report 2015 - 2016File: disclaimer 2016.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 2019.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: disclamer 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: disclaimer 2016.pdf-
Affidavit 3-
Prospectus/BrochureFile: SLV Brindavan Brochure-1_opt.pdf-
Advertisement Copy 1File: Brindavan.png-
Tower Excel SheetFile: PRMKARERA1250304PR190809002790.xlsx-
Occupancy CertificateFile: OC-CC.pdf-
Completion certificate issued by the competent authorityFile: OC-CC.pdf-
Registered Agreement of SaleFile: OC-CC.pdf-
Registered conveyance deed for an individual unitFile: OC-CC.pdf-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 33 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep SLV BRINDHAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmSLV BRINDHAVANOther 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: SLV BUILDERS AND DEVELOPERS

SLV BUILDERS AND DEVELOPERS has 3 registrations on RERA Karnataka, including SLV BRINDHAVAN and SLV MILLENNIAL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if SLV BRINDHAVAN is delayed beyond 22 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SLV BRINDHAVAN?

The registered promoter entity is SLV BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SLV BRINDHAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SLV BRINDHAVAN?

The professionals named in the filing: Architect: T.Gnanavel; Engineer: Ambrish.G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLV BRINDHAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLV BRINDHAVAN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLV BRINDHAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.