ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SLPL CONSTRUCTION PHASE II

Registration lapsed No litigation declared Residential / Group Housing project

SLPL CONSTRUCTION PHASE II

By PRAFUL BHAURAO WAHADUDE

RG-MH-02255 · RERA P50500009003 · Last updated on MahaRERA portal: 6 Jun 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
18 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 50%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

SLPL CONSTRUCTION PHASE II is a Residential / Group Housing project by PRAFUL BHAURAO WAHADUDE in Nagpur, Maharashtra, registered with MahaRERA as P50500009003 on 19 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 72 months from the original filing.

At a glance

Project

  • NameSLPL CONSTRUCTION PHASE II
  • TypeResidential / Group Housing
  • Location
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440015
  • Pincode440015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500009003
  • ReraGenie IDRG-MH-02255

Builder

  • NamePRAFUL BHAURAO WAHADUDE
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2018)
  • Buildings4 building records
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A 1NA60000
WING A2NA30000
WING B 1NA60000
WING B 2NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 50%.

WING A 150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A241%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B 150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B 241%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered4
Open Space36
BuildingClosed/CoveredOpen SpaceTotal
WING A 111011
WING A2189
WING B 111011
WING B 2189

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,614 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PUSHKAR HOMES PVT LTDNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI2809.76
Proposed, not sanctioned2,007 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHINDUSTAN COLONY WARDHA ROAD NAGPUR

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectH K MOON
PartnerRole in project
PRAFUL BHAURAO WAHADUDE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500011096Dec 2018 → Dec 2024

Reason as filed by the promoterCovid-19

Litigation declared1

CaseCourtStatus
514/2016/2016SESSIONS COURTAwaiting service of summons of other respondents

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CERSAI detailsFile: CERSAI_Search_Report_200238932397_For_Asset_Based_Search_06_06_2022_13_44_36_919 - PHPL.pd6 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2019.pdf6 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Balance Sheet 2019_compressed.pdf6 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf6 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Balance sheet 2020_compressed.pdf6 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Declaration of Commencement certificate_compressed.pdf13 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit_compressed.pdf13 May 2022
Declaration about Commencement CertificateFile: Declaration of Commencement certificate_compressed.pdf13 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A- Engineer certificate 2020_compressed.pdf13 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A- Engineer certificate 2021_compressed.pdf13 May 2022
Disclosure of sold/ booked inventoryFile: sold unsold Inventory_compressed.pdf13 May 2022
Certificates of CA (Form 5)File: Rera Form 5 (1).pdf13 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Form 5 (2020-21).pdf13 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Balance Sheet SLPL FY 2020-21_compressed.pdf13 May 2022
Certificates of CA (Form 5)File: SLPL Form 5.pdf30 Oct 2018
Building plan approvalFile: Building Plan-ilovepdf-compressed.pdf31 Jul 2017
Layout approvalFile: Layout Plan.pdf31 Jul 2017
PAN CardFile: PAN SLPL PDF.pdf31 Jul 2017
Copy of the legal title reportFile: Legal Search Somalwada.pdf31 Jul 2017
Details of encumbrancesFile: Encumberance.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: Building Plan-ilovepdf-compressed.pdf31 Jul 2017
Declaration in FORM BFile: AFFIDAVIT FORM B - NOTARISED.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-ilovepdf-compressed.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate SLPL.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT-STANDARD-RERA-CREDAI.pdf31 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SLPL CONSTRUCTION PHASE 1SAMAJ EKTA HOUSING SOCIETY SOMALWADA NAGPUR82CompletedJun 2016Jun 2016

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 72 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SLPL CONSTRUCTION PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmSLPL CONSTRUCTION PHASE Completed 30Lapsed / revoked 14Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: PRAFUL BHAURAO WAHADUDE

PRAFUL BHAURAO WAHADUDE has 1 registration on MahaRERA, including SLPL CONSTRUCTION PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that SLPL CONSTRUCTION PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SLPL CONSTRUCTION PHASE II is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SLPL CONSTRUCTION PHASE II?

The registered promoter entity is PRAFUL BHAURAO WAHADUDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SLPL CONSTRUCTION PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SLPL CONSTRUCTION PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SLPL CONSTRUCTION PHASE II?

The professionals named in the filing: Architect: H K MOON. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLPL CONSTRUCTION PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLPL CONSTRUCTION PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLPL CONSTRUCTION PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.