ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SKY VILLAS

Registration lapsed No litigation declared Others project

SKY VILLAS

By MALHAR DEVELOPERS

RG-MH-83161 · RERA P52100051750 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
4 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SKY VILLAS is a Others project by MALHAR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100051750 on 27 Jun 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 7 of the 11 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY VILLAS
  • TypeOthers
  • Location
    • Charholi Village Lane
    • Nr Tanishk Pulp
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051750
  • ReraGenie IDRG-MH-83161

Builder

  • NameMALHAR DEVELOPERS
  • Entity typePartnership
  • PartnersTushar Rajaram Tapkir, Navnath Bhagwan Tapkir
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredJun 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jun 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

64%7 of 11 units booked
49.1%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY VILLASNA339211

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SKY VILLAS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,172 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1484.98
Proposed, not sanctioned1,485 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 7, Silvana County, S No 133 Alandi Road Alandi Pune 412105
Estimated costRs 9.91 cr
Cost incurredRs 4.87 cr
Work done49.13%
BuildingWingEstimatedIncurred
SKY VILLASNARs 8.79 crRs 3.75 cr
-NARs 1.12 crRs 1.12 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil and Bugade Associates
EngineerR K RANDHAVE
EngineerSaurav Pandit Kotwal
EngineerAshok Santosh Temgire
Chartered AccountantCA Chetan Aher
Chartered AccountantSUNSVG AND ASSOCIATES
PartnerRole in project
MALHAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate 31.12.2025..pdf10 Jul 2026
Withdrawal Update Form 2File: Engineers Certificate 31122025.pdf10 Jul 2026
Withdrawal Update Form 3File: CA Certificate 31122025.pdf10 Jul 2026
Form 1File: Architects Certificate Malhar Developers 30092023.pdf22 Apr 2026
Form 2File: Form 2 engineers certificate 30092023.pdf22 Apr 2026
Form 3File: CA Form 3 Malhar Developers 30092023 TO UPLOAD.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30092023.pdf22 Apr 2026
Form 1File: Architects Certificate Malhar Developers 31122023.pdf22 Apr 2026
Form 2File: Form 2 engineers certificate 31122023.pdf22 Apr 2026
Form 3File: CA Form 3 Malhar Developers 31122023.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31122023.pdf22 Apr 2026
Form 1File: Architect Certificate Malhar.pdf22 Apr 2026
Form 2File: Engineer Certificate Malhar.pdf22 Apr 2026
Form 3File: CA Certificate Malhar.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Malhar.pdf22 Apr 2026
Form 1File: AR Malhar Developers 30062024_1.pdf22 Apr 2026
Form 2File: Eng Malhar Developers 30062024.pdf22 Apr 2026
Form 3File: CA Malhar Developers 30062024.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sky Villas sold unsold 30062024.pdf22 Apr 2026
Form 1File: Form 1 Architect Certofocate as on 30092024.pdf22 Apr 2026
Form 2File: Form 2 Engineer Skyvillas as on 300924.pdf22 Apr 2026
Form 3File: Malhar dev Form 3 14112024 CA.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Malhar sold unsold With Sign 30092024.pdf22 Apr 2026
Form 1File: Architects Certificate malhar Developers 31122024.pdf22 Apr 2026
Form 2File: Engineers Certificate 31122024.pdf22 Apr 2026
Form 3File: CA Certificate Malhar Developers 31122024.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Malhar Developers 31122024.pdf22 Apr 2026
Form 1File: Form 1 Architect SkyVillas 31032025.pdf22 Apr 2026
Form 2File: Form -2 Sky Vill 31032025.pdf22 Apr 2026
Form 3File: CA Form 3 Malhar Dev- 31032025.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold unsold sky villa 31032025.pdf22 Apr 2026
Form 1File: Architects Certificate 1 Malhar Developers 30062023.pdf22 Apr 2026
Form 2File: Form 2 engineers certificate 30092023.pdf22 Apr 2026
Form 3File: CA Form 3 Malhar Developers 30092023 TO UPLOAD.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30092023.pdf22 Apr 2026
Withdrawal Update Form 1File: malhar Dev Architects Certificate 300925.pdf31 Oct 2025
Withdrawal Update Form 2File: Malhar Engineeru0027s Certificate 300925.pdf31 Oct 2025
Withdrawal Update Form 3File: CA Certificate Malhar 30092025 DT.pdf31 Oct 2025
Withdrawal Update Form 1File: Malhar Dev Form 1 30062025.pdf19 Jul 2025
Withdrawal Update Form 2File: Malhar Dev Form 2 30062025.pdf19 Jul 2025
Withdrawal Update Form 3File: CA Malhar Developers 30062024.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Malhar Dev- 31032025_compressed.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Sky Vill 31032025.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold sky villa 31032025.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect SkyVillas 31032025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certofocate as on 30092024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Malhar Developers 31122024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31122024.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Malhar sold unsold With Sign 30092024.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Malhar Developers 31122024.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A Engineers Certificate Malhar Developers23-24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Malhar Developers 30062024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Skyvillas as on 300924.pdf25 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Malhar dev Form 5 2023_24.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malhar dev Form 3 30092024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Malhar Developers 30062024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Malhar Developers 30062024.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sky Villas sold unsold 30062024 To upload.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Malhar.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Malhar.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Malhar.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Malhar.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer's certificate 30092023.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer's certificate 31122023.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 1 Malhar Developers 30062023.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Malhar Developers 30092023.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Malhar Developers 31122023.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30092023.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 31122023.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Malhar Developers 30092023 TO UPLOAD.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Malhar Developers 31122023.pdf13 Feb 2024
Layout approvalFile: Malhar Sanction compressed 2205 Upload.pdf22 May 2023
Building plan approvalFile: Malhar Sanction compressed 2205 Upload.pdf22 May 2023
PAN CardFile: MALHAR DEV PAN.pdf22 May 2023
Copy of the legal title reportFile: Malhar devlopers Title report MAHarera 7623.pdf22 May 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrances 2605.pdf22 May 2023
Details of encumbrances concerned to FinanceFile: No Litigation.pdf22 May 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrances 2605.pdf22 May 2023
Details of encumbrances concerned to LegalFile: No Litigation.pdf22 May 2023
Copy of Layout Approval (in case of layout)File: Malhar Sanction compressed 2205 Upload.pdf22 May 2023

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nr Tanishk Pulp13,700+ in Pune

2 kmSKY VILLASCompleted 74Lapsed / revoked 29Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 171 registered projects within 2 km.

Builder: MALHAR DEVELOPERS

MALHAR DEVELOPERS has 2 registrations on MahaRERA, including SKY VILLAS and 24 EAST. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SKY VILLAS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SKY VILLAS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY VILLAS?

The registered promoter entity is MALHAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY VILLAS?

The professionals named in the filing: Architect: Patil and Bugade Associates; Engineer: R K RANDHAVE; Engineer: Saurav Pandit Kotwal; Engineer: Ashok Santosh Temgire; Chartered Accountant: CA Chetan Aher; Chartered Accountant: SUNSVG AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.