Home / Browse projects / Pune, Maharashtra / SKY TOWER

Registered No litigation declared Residential / Group Housing project

SKY TOWER

By BMC REALTY

RG-MH-59318 · RERA P52100051495 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 13 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 87%
48 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SKY TOWER is a Residential / Group Housing project by BMC REALTY in Pune, Maharashtra, registered with MahaRERA as P52100051495 on 23 Jun 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 13 months from the original filing. 16 of the 64 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY TOWER
  • TypeResidential / Group Housing
  • Location
    • MOSHI
    • PCNTDA
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051495
  • ReraGenie IDRG-MH-59318

Builder

  • NameBMC REALTY
  • Entity typePartnership
  • PartnersBIPIN DEEPAK MORE, AKSHAY SANJAY VINODE, ABHAY SUNIL VINODE, YOGESH DNYANESHWAR CHINCHWADE, MARUTI DEEPAK MORE

Key dates

this monthRegisteredJun 2023First promiseNov 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 28 Nov 2025)
  • Buildings1 building record
  • Documents filed94 files

Current status

25%16 of 64 units booked

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY TOWERNA1713521264

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 87%.

SKY TOWER: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered40
Open Space100

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,631 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2025
LandownerVillageDistrict
PANDURANG KONDIBA SASTEMoshiPune

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6568.94
Proposed, not sanctioned6,569 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1 SECTOR 27A PRADHIKARAN NIGDI

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUSHA RANGARAJAN RANGARAJAN
EngineerRUTUJ CHINCHWADE RAJARAM CHINCHWADE
EngineerRUTURAJ RAJARAM CHINCHWADE
Chartered AccountantVAISHALI GOLE ROHIDAS GOLE
Chartered AccountantVAISHALI ROHIDAS GOLE
Chartered AccountantKHUNE SHINGAVI & ASSOCAITES
PartnerRole in project
BMC REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27112518452Nov 2025 → Dec 2026

Reason as filed by the promoter1) We would like to inform to this authority that, we have updated all the project details time to time. There was a delay of nearly 5 months in the construction due to project-related paperwork. We had applied for the revised plan on 27/07/2025, and the revised plan-along with the revised commencement certificate and revised sanction plan-was received on 14/11/2025.2) Also, we would like to inform this authority that there is a delay in the construction of the building due to lack of labour, availability of construction materials and rainy season.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: scan 662_compressed.pdf25 May 2026
Building plan approvalFile: scan 663_compressed.pdf25 May 2026
Building plan approvalFile: scan 664_compressed.pdf25 May 2026
Building plan approvalFile: scan 665_compressed.pdf25 May 2026
Building plan approvalFile: scan 666_compressed.pdf25 May 2026
Building plan approvalFile: scan 667_compressed.pdf25 May 2026
Building plan approvalFile: scan 668_compressed.pdf25 May 2026
Building plan approvalFile: scan 669_compressed.pdf25 May 2026
Building plan approvalFile: scan 670_compressed.pdf25 May 2026
Withdrawal Update Form 1File: FORM NO 1 Q4 25-26.pdf25 May 2026
Withdrawal Update Form 1File: FORM NO 1 Q4 25-26.pdf25 May 2026
Withdrawal Update Form 2File: FORM NO 2 Q4 25-26.pdf25 May 2026
Withdrawal Update Form 2File: FORM NO 2 Q4 25-26.pdf25 May 2026
Withdrawal Update Form 3File: FORM NO 3 CA 25-26 Q3.pdf25 May 2026
Withdrawal Update Form 3File: FORM NO 3 Q4 25-26.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 ARCH 25-26 Q3.pdf24 May 2026
Withdrawal Update Form 2File: FORM 2 ENGG 25-26 Q3.pdf24 May 2026
Withdrawal Update Form 3File: FORM NO 3 CA 25-26 Q3.pdf24 May 2026
Form 5 (FY 2024-2025)File: CA CERTIFICATE 24-25.pdf7 Jan 2026
Withdrawal Update Form 1File: Form no 1 Architech 25-26Q1.pdf27 Nov 2025
Withdrawal Update Form 1File: Form No 1 25-26 Q2.pdf27 Nov 2025
Withdrawal Update Form 2File: FORM NO 2 ENGINEER CERTIFIACTE 25-26 Q1.pdf27 Nov 2025
Withdrawal Update Form 2File: Form No 2 25-26 q2.pdf27 Nov 2025
Withdrawal Update Form 3File: Form No 3 Q1 25-26.pdf27 Nov 2025
Withdrawal Update Form 3File: Form No 3 25-26 Q2.pdf27 Nov 2025
Form 1File: Form no 1 Architech certificate.pdf16 May 2025
Form 2File: Form no 3 CA certificate.pdf16 May 2025
Form 3File: Form no 2 ENGINEER Certificate.pdf16 May 2025
Form 1File: Form no 1 Architech certificate.pdf14 May 2025
Form 2File: Form no 2 ENGINEER Certificate.pdf14 May 2025
Form 3File: Form no 3 CA certificate.pdf14 May 2025
Form 1File: Form no 3 CA certificate.pdf14 May 2025
Form 2File: Form no 2 ENGINEER Certificate.pdf14 May 2025
Form 3File: Form no 1 Architech certificate.pdf14 May 2025
Form 1File: Form no 2 ENGINEER Certificate.pdf14 May 2025
Form 2File: Form no 1 Architech certificate.pdf14 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate-Sep24_page-0001 (1).pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q1.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24-Q2_page-0001.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24-Q3_page-0001.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24-Q4_page-0001.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 23-24-Q2_page-0001.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 23-24-Q3_page-0001.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 23-24-Q4_page-0001.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24-25-Q1.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 24-25-Q1.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24-25-Q1_compressed.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT CERTIFICATE - Q2.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1- ARCHITECT CERTIFICATE-Q3.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT CERTIFICATE - Q4.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- ENGINEER CERTIFICATE-Q2.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- ENGINEER CERTIFICATE-Q3.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- ENGINEER CERTIFICATE- Q4.pdf17 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-2023-24.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: sold-unsold inventory.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: sold-unsold inventory.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-CA CERTIFICATE - Q2.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3- CA CERTIFICATE - Q3.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-CA CERTIFICATE-Q4.pdf17 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_.pdf6 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AKSHAY VINODE.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A ABHAY.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A MAHESH.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MARUTI MORE.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: YOGESH CHINCHWADE.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BIPIN MORE.pdf5 Jun 2023
Copy of the legal title reportFile: BMC LEGAL TITLE REPORT.pdf23 May 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES.pdf23 May 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES.pdf23 May 2023
Declaration about Commencement CertificateFile: DECLARATION ABT COMMENCEMENT CERTIFICATE.pdf23 May 2023
Declaration in FORM BFile: FORM B BUILDER_.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKY TOWER_ARCHITECH CERTIFICATE.pdf23 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf23 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf23 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABT SEPARATE BANK AC.pdf23 May 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT.pdf23 May 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN AGREEMENT FOR SALE.pdf23 May 2023

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 13 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PCNTDA13,700+ in Pune

2 kmSKY TOWERCompleted 73Lapsed / revoked 31Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 167 registered projects within 2 km.

Builder: BMC REALTY

BMC REALTY has 1 registration on MahaRERA, including SKY TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SKY TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY TOWER?

The registered promoter entity is BMC REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY TOWER?

The professionals named in the filing: Architect: USHA RANGARAJAN RANGARAJAN; Engineer: RUTUJ CHINCHWADE RAJARAM CHINCHWADE; Engineer: RUTURAJ RAJARAM CHINCHWADE; Chartered Accountant: VAISHALI GOLE ROHIDAS GOLE; Chartered Accountant: VAISHALI ROHIDAS GOLE; Chartered Accountant: KHUNE SHINGAVI & ASSOCAITES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY TOWER to a free account