Home / Browse projects / Pune, Maharashtra / SKY PARK
SKY PARK
RG-MH-17075 · RERA P52100027834 · Last updated on MahaRERA portal: 24 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 25 months past the filed date
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKY PARK is a Residential / Group Housing project by SKY LINE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100027834 on 8 Jan 2021. Possession was promised by 27 Sep 2024 and is now 25 months past that date. The completion date has moved by 3 months from the original filing. 19 of the 31 units on this registration are recorded sold or booked, and 30 of 33 construction stages are filed complete.
At a glance
Project
- NameSKY PARK
- TypeResidential / Group Housing
- Location
- AMBEGAON BUDRUK
- AMBEGAON Bk
- Haveli
- Pune
- 411046
- Pincode411046
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027834
- ReraGenie IDRG-MH-17075
Builder
- NameSKY LINE DEVELOPERS
- Entity typePartnership
- PartnersYUVRAJ TUKARAM DANGAT, SHRIHARI KISAN DABADE, SWAPNIL SHIVAJI SALUNKE, SIDRAM SHANKAR JADHAV, AJAY VASANT JADHAV, Dhananjay Patil, Suresh Kute, Babasaheb Kute
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Jan 2021
- Promised completion27 Sep 2024
- Revised completionRevised to 27 Sep 2024 (originally 30 Jun 2024)
- Buildings3 building records
- Documents filed74 files
Current status
Figures as on 24 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 5 | 5 | 6 | 0 | 6 |
| B WING | NA | 5 | 5 | 12 | 0 | 12 |
| C WING | NA | 5 | 5 | 13 | 0 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 24 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 24 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| ELECTRIC METER ROOM | Yes | 100% |
Parking filed78
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| A WING | 26 | 26 |
| B WING | 26 | 26 |
| C WING | 26 | 26 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DURVANKUR ENTERPRISES | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anuj Gangwal |
| Architect | Avinash Ghadge |
| Engineer | PRATIK KHALDE |
| Chartered Accountant | PRAVIN SALUNKE |
| Chartered Accountant | J P N R & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SKY LINE DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI, Babasaheb Kute Partner of Skyline Developers having RERA Reg No : P52100027834 hereby declare that, we have received Form-4 along with the Occupancy Certificate (OC) after the project completion date due to a delay in obtaining the necessary NOC permissions from the Pune Municipal Corporation (PMC) within the stipulated time.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 SIGNED.pdf | 24 Jun 2025 |
| Form 2File: FORM 2 ENGINEER.pdf | 24 Jun 2025 |
| Form 3File: SIGN FORM 3.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD SIGNED.pdf | 24 Jun 2025 |
| Form 1File: FORM 1_ARCHITECH.pdf | 25 May 2025 |
| Form 2File: FORM 2_ENGINEER.pdf | 25 May 2025 |
| Form 3File: UPDATED_SIGN CA CERTIFICATE FORM 3.pdf | 25 May 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD UNSOLD -SIGNED'.pdf | 25 May 2025 |
| Form 5 (FY 2024-2025)File: Form 5 (FY 2023-24).pdf | 25 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UPDATED_SIGN CA CERTIFICATE FORM 3.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2023.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL-SIGN FORM 3.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGN FORM 3.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGN FORM 3.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGN FORM 3.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGN FORM 3.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A (Signed).pdf | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (FY 2022-23).pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNED Form 2A.pdf | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (FY 2023-24).pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECH.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 4 ARCHITECT.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEER.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEER.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEER.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEER.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_compressed.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Skyline form 3_compressed.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3Engineer Certificate For RERA3-final.pdf | 14 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Assurance March 2021.pdf | 14 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 13 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Signed.pdf | 13 Apr 2023 |
| Layout approvalFile: LayoutApproval_Building Plan.pdf | 3 Feb 2022 |
| Building plan approvalFile: LayoutApproval_Building Plan.pdf | 3 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: LayoutApproval_Building Plan.pdf | 3 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: LayoutApproval_Building Plan.pdf | 3 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 3 Feb 2022 |
| Layout approvalFile: Layout Approval.PDF | 2 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.PDF | 2 Feb 2022 |
| Declaration about Commencement CertificateFile: CC declaration final.pdf | 2 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order Revised.pdf | 28 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 28 Jan 2022 |
| Proforma of Allotment letterFile: Draft Agreement Revised.pdf | 28 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Signed.pdf | 20 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sky Park Form 5.pdf | 20 Jan 2022 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 19 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate For RERA-converted-converted.pdf | 19 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance March 2021.pdf | 19 Jan 2022 |
| CERSAI detailsFile: Cersai Signed.pdf | 19 Jan 2022 |
| Layout approvalFile: final revised plan 2020.pdf | 17 Jan 2022 |
| Building plan approvalFile: final revised plan 2020.pdf | 17 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: final revised plan 2020.pdf | 17 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: final revised plan 2020.pdf | 17 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 Jan 2022 |
| Layout approvalFile: 20)Lay out Plan_01.pdf | 19 Dec 2020 |
| Building plan approvalFile: 20)Lay out Plan_01.pdf | 19 Dec 2020 |
| PAN CardFile: 7)Pan Card Skyline.pdf | 19 Dec 2020 |
| Copy of the legal title reportFile: 2)Search Title.pdf | 19 Dec 2020 |
| Details of encumbrancesFile: 2)Search Title.pdf | 19 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: 20)Lay out Plan_01.pdf | 19 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 20)Lay out Plan_01.pdf | 19 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 19)commencement certificate.pdf | 19 Dec 2020 |
| Declaration in FORM BFile: Builder Affidavit.pdf | 19 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architeck Certificate.pdf | 19 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 19 Dec 2020 |
| Proforma of Allotment letterFile: PROFARMA ALLOTMENT LETTER.pdf | 19 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SKY PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBEGAON BUDRUK13,700+ in Pune
Filed coordinates, straight-line distance. 164 registered projects within 2 km.
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: SKY LINE DEVELOPERS
SKY LINE DEVELOPERS has 2 registrations on MahaRERA, including BLUE RIDGE and SKY PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SKY PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SKY PARK is delayed beyond 27 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKY PARK?
The registered promoter entity is SKY LINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKY PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SKY PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKY PARK?
The professionals named in the filing: Architect: Anuj Gangwal; Architect: Avinash Ghadge; Engineer: PRATIK KHALDE; Chartered Accountant: PRAVIN SALUNKE; Chartered Accountant: J P N R & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKY PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback