Home / Browse projects / Mysore, Karnataka / SKANDA ENCLAVE 6

Registration approved Litigation declared Plotted Development project

SKANDA ENCLAVE 6

By SAHA DEVELOPERS AND PROMOTERS

RG-KA-43935 · RERA PRM/KA/RERA/1268/378/PR/181224/007306 · Last updated on RERA Karnataka portal: 13 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 149 documents Report an error

SKANDA ENCLAVE 6 is a Plotted Development project by SAHA DEVELOPERS AND PROMOTERS in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/181224/007306 on 18 Dec 2024. Possession is promised by 30 Oct 2030.

At a glance

Project

  • NameSKANDA ENCLAVE 6
  • TypePlotted Development
  • Location
    • MYSORE
    • 570010
  • Pincode570010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/181224/007306
  • ReraGenie IDRG-KA-43935

Builder

  • NameSAHA DEVELOPERS AND PROMOTERS
  • Entity typeProprietorship
  • Authorized SignatoryShreekaanth Daas
  • Other registrations20 more →
  • Declared earlier projects39 →

Key dates

this monthRegisteredDec 2024PromisedOct 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Dec 2024
  • Promised completion30 Oct 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed149 files

Current status

2.8%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners8
LandownerVillageDistrict
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--
M/S. SAHA DEVELOPERS & PROMOTERS, represented by its Proprietor Sri. Shreekaanth Daas--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.94 cr
Cost incurredRs 8.10 lakh
Spent of the estimate2.76%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.62 cr-
On-site expenditure-Salaries of workersRs 64.62 lakhRs 7.51 lakh
On-site expenditure-Site OverheadRs 52.87 lakhRs 58,793
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 8.81 lakh-
On-site expenditure-Consultants FeesRs 5.87 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerC B Lakshman Rao
Chartered AccountantMadhusudana

Litigation declaredYes

The promoter declares litigation on this registration. The case records are in the filed documents.

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed149

As listed on the registration, under the names the promoter filed them with; the newest 80 of 149 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/181224/007306 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4 .PDF13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF13 Oct 2026
Q2 2026-27 Water supply and sewage board13 Oct 2026
Q2 2026-27 Engineering Department (PWD) for completion of development works13 Oct 2026
Q2 2026-27 Horticulture department13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 Horticulture department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 Horticulture department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF14 Jan 2026
Q3 2025-26 Horticulture department14 Jan 2026
1) EC from 13/6/2024 to till date For Survey Number 79/3, 80/7 , 80/8, 81/1, 81/2,94/13, 106/6, 106/File: 1 EC from 13-06-2024 to till date.pdf16 Dec 2024
2)release deed for the mortgage with KGB, Davalapur branch for sno 80/7File: 2 Release Deed for the Mortgage Deed.pdf16 Dec 2024
O. S. No.1287/2022File: 3 OS No1287-2022.pdf16 Dec 2024
1)Approved Layout plan original drawings.File: 4 APPROVED PLAN (JG 4A-37G).jpg16 Dec 2024
2)Approved layout plan work order Original letter.File: 5 Layout Work Order.pdf16 Dec 2024
ADLR certified survey sketchFile: 6 ADLR Certified Servey Sketch.jpg16 Dec 2024
Area statement of Land Use Analysis in plan entered in project detailsFile: 7 Area Statement in Land Use Analysis.pdf16 Dec 2024
KSPCB NOC.File: 8 KSPCB NOC.pdf16 Dec 2024
All Department NOC.File: 9 ALL DEPARTMENT NOC.pdf16 Dec 2024
Park, CA and Road area Relinquishment DeedFile: 10 Relinquishment deed +Park, CA, Road Area.pdf16 Dec 2024
Village mapFile: 11 Village Map.jpg16 Dec 2024
Area details the project details pageFile: 12 Area details.pdf16 Dec 2024
Individual plot Size, Dimension and AreaFile: 13 Individual plot size merged pdf.pdf16 Dec 2024
Updated Amenities and Common area detailsFile: 14 Amenities and Common Area details.pdf16 Dec 2024
Please Upload the STP/Septic tank, Soak pit, and sewer line drawingFile: 16 STP.pdf16 Dec 2024
Please upload the self-attested copy of the NOC issued by CESCOM and Water Supply along with the copFile: 17 CESCOM and WATER SUPPLY.pdf16 Dec 2024
Please upload the Land cost calculation sheet as per the guidance valueFile: 18 Land cost calculation sheet.pdf16 Dec 2024
Please clarify the source of water supply to the project along with the supporting documents and phoFile: 19 Source of water supply.jpeg16 Dec 2024
Please upload the brief estimated cost of constructionFile: 20 The Brief Estimated Cost of Construction.PDF16 Dec 2024
1. Profit and loss account, Balance sheet and ITR for 2021-22, 2022-23 & 2023-24File: 1 Profit and loss account, Balance sheet and ITR for 2021-22, 2022-23 & 2023-24.pdf29 Nov 2024
2. Source of fundsFile: 2 Source of funds.pdf29 Nov 2024
3. Annual Audit ReportFile: 3 Annual Audit Report.pdf29 Nov 2024
RTC, survey 79/3-
Mutation, survey 79/3-
Encumbrance Certificate, survey 79/3-
Conversion/Alienation Order, survey 79/3-
Sale/Title/Gift Deed, survey 79/3-
Khatha, survey 79/3-
RTC, survey 80/7-
Mutation, survey 80/7-
Encumbrance Certificate, survey 80/7-
Conversion/Alienation Order, survey 80/7-
Sale/Title/Gift Deed, survey 80/7-
Khatha, survey 80/7-
RTC, survey 80/8-
Mutation, survey 80/8-
Encumbrance Certificate, survey 80/8-
Conversion/Alienation Order, survey 80/8-
Sale/Title/Gift Deed, survey 80/8-
Khatha, survey 80/8-
RTC, survey 81/1-
Mutation, survey 81/1-
Encumbrance Certificate, survey 81/1-
Conversion/Alienation Order, survey 81/1-
Sale/Title/Gift Deed, survey 81/1-
Khatha, survey 81/1-
RTC, survey 81/2-
Mutation, survey 81/2-
Encumbrance Certificate, survey 81/2-
Conversion/Alienation Order, survey 81/2-
Sale/Title/Gift Deed, survey 81/2-
Khatha, survey 81/2-
RTC, survey 94/13-
Mutation, survey 94/13-
Encumbrance Certificate, survey 94/13-
Conversion/Alienation Order, survey 94/13-
Sale/Title/Gift Deed, survey 94/13-
Khatha, survey 94/13-
RTC, survey 106/6-
Mutation, survey 106/6-
Encumbrance Certificate, survey 106/6-
Conversion/Alienation Order, survey 106/6-
Sale/Title/Gift Deed, survey 106/6-
Khatha, survey 106/6-

Promoter's earlier projects36

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 not delivered by the promised date7 under way, not due yet17 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SAHA MEADOWSYandahalli Village , Varuna Hobli, Mysore Taluk & Mysuru District.OngoingJul 2030Not due yet
SAHA REGALK Hemmanahalli, Ilwala Hobli, Mysore Taluk & Mysore District.OngoingJun 2027Not due yet
SAHA IMPERIALBelawadi, Ilwala Hobli, Mysore Taluk & Mysore District.OngoingJun 2027Not due yet
SKANDA ENCLAVE 2Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingMay 2027Not due yet
SKANDA ENCLAVE 1Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingApr 2027Not due yet
Skanda Enclave 3Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingJan 2027Not due yet
Saha SereneMadapura Village, Varuna Hobli, Mysore Taluk, Mysore District,OngoingDec 2026Not due yet
Shreesha Hill View 3ASarkariUtthanahalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingAug 2026Not delivered
Shree Enclave Mysore (iT Park) 4BJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingMay 2026Not delivered
SIR M V LAYOUT 2Marashettihalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingFeb 2026Not delivered
Skanda Enclave 5Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingJan 2026Not delivered
Sree Sapthamathruka 6AJanthagalli Village, Varuna Hobli, Mysore Taluk & Mysore District.OngoingNov 2025Not delivered
SAHA CONCORDBelwadi Village, Ilwala Hobli , Mysore Taluk, Mysore DistrictOngoingJun 2025Not delivered
SAHA SPLENDIDHuyilalu Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingJun 2025Not delivered
Currency Layout 1Janthagalli Village, Varuna Hobli, Mysore Taluk & Mysore District.OngoingDec 2024Not delivered
SHREE ENCLAVE MYSORE (iT PARK) 4CJanthagalli Village, Varuna Hobli, Mysore Taluk & Mysore District.OngoingSep 2024Not delivered
Sree Sapthamathruka 6B2Janthagalli Village, Varuna Hobli, Mysore Taluk and Mysore District.OngoingSep 2024Not delivered
Sree Sapthamathruka 6BJanthagalli Village, Varuna Hobli, Mysore Taluk, Mysore District.OngoingSep 2024Not delivered
SHREE ENCLAVE MYSORE (iT PARK) 4DJanthagalli Village, Varuna Hobli, Mysore Taluk & Mysore District.OngoingFeb 2024Not delivered
Skanda EnclaveJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 3DJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 3CJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 3BJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 3AJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 2AJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 2Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shree Enclave Mysore (iT Park) 1Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
SIR M V LAYOUT 1Marashettihalli & Hadajana Village, Varuna Hobli, Mysuru Taluk &MysuruDistrict.Completed-No date filed
SHREE ENCLAVE MYSORE (iT PARK) 4Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
SHREE ENCLAVE (iT PARK) HUYILALU 1Huyilalu village & Bommanahalli Village, Ilwala Hobli, Mysore Taluk &MysoreDistrict.Completed-No date filed
SAHA PEARLBelwadi Village, Ilwala Hobli , Mysore Taluk and Mysore District.Completed-No date filed
SAHA ELITEK Hemmanahalli, Ilwala Hobli, Mysore Taluk & Mysore District.Completed-No date filed
SAHA ELEGANCEK Hemmanahalli, Ilwala Hobli, Mysore Taluk & Mysore District.Completed-No date filed
Riddha HabitatIlwala Village, Ilwala Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Janthagalli BJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Janthagalli AJanthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep SKANDA ENCLAVE 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmSKANDA ENCLAVE 6Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: SAHA DEVELOPERS AND PROMOTERS

SAHA DEVELOPERS AND PROMOTERS has 21 registrations on RERA Karnataka, including Sree Sapthamathruka 6B and Sir M V Layout 2. Its filings declare 39 earlier projects, 12 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if SKANDA ENCLAVE 6 is delayed beyond 30 Oct 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SKANDA ENCLAVE 6?

The registered promoter entity is SAHA DEVELOPERS AND PROMOTERS, a proprietorship as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SKANDA ENCLAVE 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SKANDA ENCLAVE 6?

The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: Madhusudana. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKANDA ENCLAVE 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKANDA ENCLAVE 6. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKANDA ENCLAVE 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.