Home / Browse projects / Bengaluru Rural, Karnataka / SJ PARK VILLE
SJ PARK VILLE
RG-KA-04524 · RERA PRM/KA/RERA/1250/304/PR/240326/008547 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SJ PARK VILLE is a Residential/Group Housing project by SJ CONSTRUCTIONS in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/240326/008547 on 24 Mar 2026. Possession is promised by 31 Dec 2029. 11 of the 118 units on this registration are recorded sold or booked, and 1 of 15 construction stages are filed complete.
At a glance
Project
- NameSJ PARK VILLE
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- PincodeNot stated
- RERA no.PRM/KA/RERA/1250/304/PR/240326/008547
- ReraGenie IDRG-KA-04524
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on24 Mar 2026
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings10 building records
- Documents filed153 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 7 | 0 | 7 |
| Block B | - | - | - | 16 | 0 | 16 |
| Block C | - | - | - | 16 | 0 | 16 |
| Block D | - | - | - | 13 | 0 | 13 |
| Block E | - | - | - | 4 | 0 | 4 |
| Block F | - | - | - | 8 | 0 | 8 |
| Block G | - | - | - | 8 | 0 | 8 |
| Block H | - | - | - | 30 | 0 | 30 |
| Block I | - | - | - | 15 | 0 | 15 |
| CLUB HOUSE | - | - | - | 1 | 0 | 1 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 15 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 90%.
Building: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 90% |
| Foundation footing work | 45% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 45% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 25% |
| Masonry Construction | 25% |
| Plastering inside , outside & Ceiling | 45% |
| Joinery: Doors, Windows, Ventilators etc | 45% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 25% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 25% |
| Sewage and Drainage System | Yes | 45% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 25% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 25% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 45% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 10% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 15% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Padma N | - | - |
| Lakshmi P | - | - |
| Akash M | - | - |
| Akshay M | - | - |
| H Rajini Vishwanatha Reddy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 105.63 cr | Rs 23.04 cr |
| Payment of taxes | Rs 13.00 cr | Rs 89.91 lakh |
| On-site expenditure-Site Overhead | Rs 5.00 cr | Rs 1.56 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 5.00 cr | Rs 86.59 lakh |
| On-site expenditure-Consultants Fees | Rs 1.00 cr | Rs 21.00 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | B V Narendranath Reddy |
| Engineer | RAJPUROHIT KARANSINGH PRABHUSINGH |
| Chartered Accountant | PAYYAVULA SRIKANTH |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed153
As listed on the registration, under the names the promoter filed them with; the newest 80 of 153 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/240326/008547 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Final_compressed.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5, Ar.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| authenticated copy of connected MR showing flow of titles in favour of landowner before conversion iFile: MR merged.pdf | 17 Mar 2026 |
| podi MR from 32 to 32/2File: Podi 32 to 32-2.pdf | 17 Mar 2026 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: Full Plan_compressed.pdf | 17 Mar 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent AuthorityFile: CLU-KTCP NOC.pdf | 17 Mar 2026 |
| Kindly upload SEIAA NOCFile: SEIAA NOC.pdf | 17 Mar 2026 |
| Kindly upload the STP drawing with engineer signatureFile: STP with engineer sign.pdf | 17 Mar 2026 |
| Kindly upload th estimate duly signed by engineer only along with engineer licence.File: Brief estimated cost certified by engineer_compressed.pdf | 17 Mar 2026 |
| kindly upload land cost calculation sheet as per guidance certificatFile: Land Cost Calculation Sheet Declaration and Guidance Value.pdf | 17 Mar 2026 |
| CDP Map Showing Proposed SiteFile: CDP Map showing proposed site.pdf | 17 Mar 2026 |
| Authenticated copy of current year RTCFile: RTC merged.pdf | 6 Mar 2026 |
| authenticated copy of connected MR showing flow of titles in favour of landowner before conversion iFile: MR 32-2.pdf | 6 Mar 2026 |
| title deed of the current landowner as per latest transaction of rajni vishwanath reddyFile: Rajini Vishwanath reddy title doc.pdf | 6 Mar 2026 |
| JDA between land owner and promoter in sr no 43/2File: Vishwanath reddy JDA 43-2_compressed.pdf | 6 Mar 2026 |
| Authenticated Defect free EC from 1-4-2011 to till date in all sr nos.File: EC merged.pdf | 6 Mar 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Sketch.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block A_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block B_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block C_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block D_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block E_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block F_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block G_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block H_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Block I_compressed.pdf | 6 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Club House.pdf | 6 Mar 2026 |
| Upload commencement certificateFile: Commencement Certificate.pdf | 6 Mar 2026 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: Full Plan_compressed.pdf | 6 Mar 2026 |
| Demarcation of proposed land in original Village map certified by the competent authority.File: Village map.pdf | 6 Mar 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent AuthorityFile: KSPCB NOC.pdf | 6 Mar 2026 |
| Details of facilities provided thereof including fire fighting facilities, drinking water facilitiesFile: Declaration for facilities like fire fighting, drinking water, emergency services and rene | 6 Mar 2026 |
| Latitude and Longitude of the proposed project does not match with the project location.File: Latitude and Longitude with image.PNG | 6 Mar 2026 |
| Date of approval in uploaded engineer licence is not visible,kindly upload clear visible licenceFile: Final Engineer License.pdf | 6 Mar 2026 |
| Upload the Form -6 Engineer certificate instead of Form-3, since the project is ongoing projectFile: SJ Villa Form 6.pdf | 6 Mar 2026 |
| Kindly upload elaborated structural stability certificateFile: Stability Certificate with plan.pdf | 6 Mar 2026 |
| Kindly upload AFS by including all the clauses as per RERA proforma only as per the prescribed standFile: Proforma for Agreement of Sale.pdf | 6 Mar 2026 |
| Kindly upload Proforma Allotment letter as per the standard prescribed format available in RERA porFile: Proforma of Allotment Letter.pdf | 6 Mar 2026 |
| Kindly upload SEIAA NOC.File: SEIAA NOC PARK VILLE.pdf | 6 Mar 2026 |
| Kindly upload project estimate duly signed engineer whose having valid licence.File: Project Estimates certified by Architect_compressed.pdf | 6 Mar 2026 |
| Kindly upload the STP drawing certified by the Engineer as per the guidelines.File: STP DRAWING.pdf | 6 Mar 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Self attested land cost calculation.pdf | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Declaration for Source of water.pdf | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Water NOC.pdf | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Borewell 1.jpeg | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Borewell 2.jpeg | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Borewell 3.jpeg | 6 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents aFile: Borewell 4.jpeg | 6 Mar 2026 |
| RTC, survey 32/2 | - |
| Mutation, survey 32/2 | - |
| Encumbrance Certificate, survey 32/2 | - |
| Conversion/Alienation Order, survey 32/2 | - |
| Sale/Title/Gift Deed, survey 32/2 | - |
| JDA, survey 32/2 | - |
| Khatha, survey 32/2 | - |
| RTC, survey 42/1 | - |
| Mutation, survey 42/1 | - |
| Encumbrance Certificate, survey 42/1 | - |
| Conversion/Alienation Order, survey 42/1 | - |
| Sale/Title/Gift Deed, survey 42/1 | - |
| JDA, survey 42/1 | - |
| Khatha, survey 42/1 | - |
| RTC, survey 42/3 | - |
| Mutation, survey 42/3 | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SJ TRILLIUM | Sy No. 71/7, Near Anjaneya Temple, Varthur Village, Varthur Hobli | Completed | - | No date filed |
| SJ PINNACLE | Sy No. 5/4, 5/7, 5/8, Katha No. 2882, Varthuru Village, Bangalore | Completed | - | No date filed |
| East Breeze | Sy No. 164/2, 164/5, 164/6, 164/7, 164/8, 164/9, Hagadur, Whitefield, Immadihalli Main Road | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep SJ PARK VILLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
BARCA AT GODREJ MSR CITY
M S RAMAIAH VENTURES LLP
Ozone Urbana
Ozone Urbana Infra Developers Pvt Ltd
Pashmina Brookwoods
Shashwati Realty Pvt Ltd
Godrej Royale Woods
Godrej Projects North Star LLP
Prestige Jindal City-Phase II
PRESTIGE SOUTHCITY HOLDINGS
Provident Botanico
Provident Housing Limited
See every Bengaluru Rural project, with the district possession charts
Builder: SJ CONSTRUCTIONS
SJ CONSTRUCTIONS has 4 registrations on RERA Karnataka, including SJ PARK VILLE and SJ CLASSIQUE. Its filings declare 4 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if SJ PARK VILLE is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SJ PARK VILLE?
The registered promoter entity is SJ CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29ADCFS7935H1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SJ PARK VILLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SJ PARK VILLE?
The professionals named in the filing: Architect: B V Narendranath Reddy; Engineer: RAJPUROHIT KARANSINGH PRABHUSINGH; Chartered Accountant: PAYYAVULA SRIKANTH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SJ PARK VILLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback