SIMPLICITY PHASE 4 - A WING
RG-MH-17259 · RERA P52100028340 · Last updated on MahaRERA portal: 4 Apr 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIMPLICITY PHASE 4 - A WING is a Residential / Group Housing project by J K P DEVELOPERS UNIT NO 2 in Pune, Maharashtra, registered with MahaRERA as P52100028340 on 18 Feb 2021. The registration is recorded completed; possession was promised by 31 Jul 2026.
At a glance
Project
- NameSIMPLICITY PHASE 4 - A WING
- TypeResidential / Group Housing
- Location
- HANEDWADI ROAD
- AUTADE HANDEWADI
- OUATADE HANDEWADI
- Haveli
- Pune
- 412308
- Pincode412308
- RERA no.P52100028340
- ReraGenie IDRG-MH-17259
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Feb 2021
- Promised completion31 Jul 2026
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
A BUILDING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MALOJI BABURAO BHOSALE | Hadapsar | Pune |
| RAJLAXMI MALOJIRAO BHOSALE | Hadapsar | Pune |
| JIYAJI MALOJIRAO BHOSALE | Hadapsar | Pune |
| RUSHIKESH MALOJIRAO BHOSALE | Hadapsar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ankur Associates thorgh its Partner Prakash Kulkarni |
| Engineer | G A Bhilare Consultants Pvt Ltd |
| Chartered Accountant | Ankur Mehta |
| Partner | Role in project |
|---|---|
| J K P DEVELOPERS UNIT NO 2 | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Jul 2023
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Disclosure of booking handewadi A wing.PDF | 4 Apr 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY FORMATION CERTIFICATE.PDF | 16 Mar 2024 |
| Other - FinanceFile: RECONVEYANCE OF MORTGAGE.PDF | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING HANDEWADI JAN 24.PDF | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL STATEMENT HANDEWADI.PDF | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING - SIMPLICITY 03-10-23.PDF | 6 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Certificate.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE JULY 2023 HANDEWADI.PDF | 4 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A HANDEWADI JULY 2023.PDF | 4 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING HANDEWADI JULY 2023.PDF | 4 Jul 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLITION CERTIFICATE HANDEWADI.PDF | 4 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 HANDEWADI A WING.PDF | 4 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CA JANUARY 2022.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE JANUARY 2022.PDF | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JKP UNIT 2 APRIL 2022.PDF | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JKP JULY 2022.PDF | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JKP OCTOBER 2022.PDF | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH JKP JANUARY 2023.PDF | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH J K P APRIL 2023.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JANUARY 2022.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JKP UNIT 2 APRIL 22.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JKP JULY 22.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JKP OCTOBER 2022.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers JKP JANUARY 2023.PDF | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JKP 2 APRIL 2023.PDF | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA JANUARY 2022.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A APRIL 2022.PDF | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A JULY 2022.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A OCTOBER 2022.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A JANUARY 2023.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A APRIL 2023.PDF | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A JKP2 APRIL 2023.PDF | 7 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING JKP 2 APRIL 2023.PDF | 7 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A JKP 06-01-2023.PDF | 6 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING HANDEWADI 6-1-2023.PDF | 6 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JKP DEVELOPERS 06-10-22.PDF | 8 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING JKP 06-10-22.PDF | 8 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: JKP Developers Unit 2 Certificate.pdf | 29 Sep 2022 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE_Simplicity Ph 4-23082022.pdf | 23 Aug 2022 |
| Proforma of Allotment letterFile: Draft Allotment Letter_Simplicity Phase 4.PDF | 13 Jul 2022 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE Simplicity Ph 4 JULY 2022.pdf | 13 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEERS 2 A JKP JULY 22.PDF | 6 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING J K P JULY 22.PDF | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JKP UNIT 2 APRIL 22.PDF | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER SIMPLICITY A WING 4-4-22.PDF | 6 Apr 2022 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT_ Simplicity Phase 4_A wing.pdf | 26 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_Simplicity Phase 4.PDF | 28 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_Simplicity Phase 4.PDF | 28 Jan 2022 |
| Proforma of Allotment letterFile: DRAFT Allotment Letter and Agreement for Sale.pdf | 19 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING 04-01-2022.PDF | 7 Jan 2022 |
| Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER AND AGREEMENT FOR SALE-15122021.pdf | 15 Dec 2021 |
| Details of encumbrancesFile: DETAILS OF ENCRUMBANCES.PDF | 16 Nov 2021 |
| Details of encumbrancesFile: INDEX 2.PDF | 16 Nov 2021 |
| Declaration in FORM BFile: FORM B.PDF | 16 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JKP - OCT 21.PDF | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER HANDEWADI OCT 21.PDF | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIMPLICITY ANNUAL REPORT 20 -21.pdf | 1 Oct 2021 |
| Proforma of Allotment letterFile: AMENDED ALLOTMENT AND AGREEMENT.pdf | 2 Sep 2021 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE.PDF | 7 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A HANDEWADI JULY 2021.PDF | 7 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF BOOKING 30 7 2021.PDF | 7 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Simplicity Phase 4.PDF | 7 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JANUARY TO MARCH 2021.PDF | 6 May 2021 |
| Proforma of Allotment letterFile: Amended Proforma of the allotment Letter and agreement for sale.pdf | 27 Feb 2021 |
| Layout approvalFile: BUILDING LAYOUT.PDF | 12 Feb 2021 |
| Building plan approvalFile: N A Order.PDF | 12 Feb 2021 |
| PAN CardFile: J K P Unit 2 Pan.pdf | 12 Feb 2021 |
| Copy of the legal title reportFile: Search and title report.PDF | 12 Feb 2021 |
| Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.PDF | 12 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: BUILDING LAYOUT.PDF | 12 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: N A Order.PDF | 12 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.PDF | 12 Feb 2021 |
| Declaration in FORM BFile: FORM B AFFIDAVIT.pdf | 12 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 12 Feb 2021 |
| Proforma of Allotment letterFile: Allotment Letter and AGREEMENT FOR SALE for A wing.pdf | 12 Feb 2021 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SIMPLICITY - E4 E5 | SR NO 10-11 PLOT NO 2 AUTADE HANDEWADI PUNE | 41 | Completed | Oct 2018 | Oct 2017 |
| SIMPLICITY - C1 C2 D1 D2 D3 E1 E2 E3 | SR NO 10-11 PLOT NO 2 AUTADE HANDEWADI PUNE | 155 | Completed | Oct 2014 | Oct 2014 |
| SIMPLICITY - B1 B2 B3 B4 B5 B6 B7 B8 | SR NO 10-11 PLOT NO 1 AUTADE HANDEWADI PUNE | 209 | Completed | Oct 2013 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep SIMPLICITY PHASE 4 - A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AUTADE HANDEWADI13,700+ in Pune
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: J K P DEVELOPERS UNIT NO 2
J K P DEVELOPERS UNIT NO 2 has 2 registrations on MahaRERA, including SIMPLICITY - E4 AND E5 and SIMPLICITY PHASE 4 - A WING. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SIMPLICITY PHASE 4 - A WING is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIMPLICITY PHASE 4 - A WING?
The registered promoter entity is J K P DEVELOPERS UNIT NO 2, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIMPLICITY PHASE 4 - A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIMPLICITY PHASE 4 - A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIMPLICITY PHASE 4 - A WING?
The professionals named in the filing: Architect: Ankur Associates thorgh its Partner Prakash Kulkarni; Engineer: G A Bhilare Consultants Pvt Ltd; Chartered Accountant: Ankur Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIMPLICITY PHASE 4 - A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback