Home / Browse projects / Pune, Maharashtra / SILVER PARK
SILVER PARK
RG-MH-58420 · RERA P52100047322 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVER PARK is a Residential / Group Housing project by GOLE & HOLE BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100047322 on 19 Oct 2022. Possession is promised by 1 Dec 2027. 30 of the 130 units on this registration are recorded sold or booked, and 8 of 19 construction stages are filed complete.
At a glance
Project
- NameSILVER PARK
- TypeResidential / Group Housing
- Location
- BHAJI MANDAI ROAD
- SURYANAGARI
- SURYANAGARI
- Jalochi
- Baramati
- Pune
- 413102
- Pincode413102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047322
- ReraGenie IDRG-MH-58420
Builder
- NameGOLE & HOLE BUILDERS
- Entity typePartnership
- PartnersGanesh Vitthal Gole, Amit Madhukar Hole
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Oct 2022
- Promised completion1 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed135 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SILVER PARK BUILDING B | NA | 8 | 7 | 56 | 0 | 56 |
| SILVER PARK BUILDING A | NA | 8 | 8 | 52 | 22 | 74 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 19 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
SILVER PARK BUILDING B73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SILVER PARK BUILDING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 50% |
Parking filed171
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Stilt / Ground | Total |
|---|---|---|---|---|
| SILVER PARK BUILDING B | 107 | 0 | 0 | 107 |
| SILVER PARK BUILDING A | 0 | 10 | 54 | 64 |
Land and ownership19
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sunanda Madhukar Satav | Baramati (M Cl) | Pune |
| Sandip Krushnarao Bandal | Katewadi | Pune |
| Rajkumar Dattatray Shedage | Ghadagewadi | Pune |
| Sanjay Mahadev Jagtap | Dalaj No.2 | Pune |
| Dipak Appaso Golande | Shirsuphal | Pune |
| Seema Uttam Wagh | Katewadi | Pune |
| Tejas Uttam Wagh | Katewadi | Pune |
| Vishnu Bhauso Kakade | Katewadi | Pune |
| Vitthal Namdev Jadav | Hol | Pune |
| Varsha Diliprao Kadam | Sastewadi | Pune |
| Balaso Krushna Sabale | Malegaon Bk | Pune |
| Ashokrao Dattatray Jadhav | Wanewadi | Pune |
| Shabbir Musa Shaikh | Pune (M Corp.) | Pune |
| Santosh Baburao Bandal | Shirawali | Pune |
| Hanumant Rajaram Golande | Sabalewadi | Pune |
| Sunita Arun Mali | Aran | Solapur |
| Mahadev Ramchandra Gole | Baramati (M Cl) | Pune |
| Chandrashekhar Sitaram Bhujbal | Giravi | Solapur |
| Prakash Vasant Katpale | Yawat Station | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SILVER PARK BUILDING B | NA | Rs 6.66 cr | Rs 6.25 cr |
| - | NA | Rs 9.50 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR ABHIJEET ANIL KALE |
| Engineer | MR ABHIJEET ANIL KALE |
| Chartered Accountant | MR SAMRAT ASHOK SOMANI |
| Chartered Accountant | Mr Lalaso B Dhaygude |
| Partner | Role in project |
|---|---|
| GOLE & HOLE BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2027
Documents filed135
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5 Year 2025 26.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 March 26.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 march 2026.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 31 3 26.pdf | 15 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Year 2025-26.pdf | 15 Jun 2026 |
| Building plan approvalFile: Sanctioned Plan Highlighted.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: Architect certificate 31 12 25.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: Engineer certificate 31 12 25.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - for widrawal correction.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: Architect certificate 31 12 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: Engineer certificate 31 12 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: Form3- dec 2025 (1).pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: Architect certificate 31 12 25.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Engineer certificate 31 12 25.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: CA certificate 31 12 25.pdf | 10 Feb 2026 |
| Withdrawal Update Form 1File: Architect certificate 31 12 25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: Engineer certificate 31 12 25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: CA certificate 31 12 25.pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: Architect certificate 31 12 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Engineer certificate 31 12 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: CA certificate 31 12 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 sept 25.pdf | 29 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 sept 25.pdf | 29 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 sept 25_comp.pdf | 29 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 june 25.pdf | 30 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 30 june 25.pdf | 30 Sep 2025 |
| Withdrawal Update Form 3File: Form no 3 30 06 2025_comp.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - FY 2024 25.pdf | 20 Sep 2025 |
| Form 1File: Architect cert March 25.pdf | 8 Sep 2025 |
| Form 2File: Engg Cert March 25.pdf | 8 Sep 2025 |
| Form 3File: Form 3 CA March 25.pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of inventory March 25.pdf | 8 Sep 2025 |
| Form 2A (FY 2022-2023)File: QA 2A certificate F. Y. 22-23.pdf | 9 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Certifcate FY 23-24.pdf | 9 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2 A certificate FY 24-25.pdf | 9 Aug 2025 |
| Form 1File: Architect Certificate -dec 22.pdf | 6 Aug 2025 |
| Form 2File: Engineer Certificate-dec 22.pdf | 6 Aug 2025 |
| Form 3File: CA certificate-dec 22.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: disclosure of invetory-dec 22.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-March 23.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT-March 23.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT-March 23.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold inventory-March 23.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-JUNE 23.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT -JUNE 23.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT -JUNE 23.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DICLOSURE OF INVENTORY -JUNE 23.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-SEPT 23.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT-SEPT 23.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT-SEPT 23.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DIS INVENTORY -SEPT 23.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-DEC 23.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT-DEC 23.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT- DEC 23.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE INVENTORY-DEC23.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-MARCH 24.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT-MARCH 24.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT-MARCH 24.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE INVENTORY-MARCH 24.pdf | 6 Aug 2025 |
| Form 1File: FORM 1- ARCH CERT-JUNE 24.pdf | 6 Aug 2025 |
| Form 2File: FROM 2-ENGG CERT-JUNE 24.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT-JUNE 24.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY-JUNE 24.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT-SEPT 24.pdf | 6 Aug 2025 |
| Form 2File: FORM 2- ENGG CERT-SEPT 24.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT - SEPT 24.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY -SEPT 24.pdf | 6 Aug 2025 |
| Form 1File: FORM 1-ARCH CERT- DEC 24.pdf | 6 Aug 2025 |
| Form 2File: FORM 2-ENGG CERT-DEC 24.pdf | 6 Aug 2025 |
| Form 3File: FORM 3-CA CERT-DEC 24.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY -DEC 24.pdf | 6 Aug 2025 |
| Form 5 (FY 2022-2023)File: FORM 5- FY-2022-2023.pdf | 6 Aug 2025 |
| Form 5 (FY 2023-2024)File: FORM 5- ANNUAL REPORT-2023-24.pdf | 6 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cert 30 09 24.pdf | 4 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cert 31 12 24.pdf | 4 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT 30 09 24_comp.pdf | 4 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert 31 12 24_comp.pdf | 4 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cert 30 09 24.pdf | 4 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cert 31 12 24.pdf | 4 May 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold booked inventory 30 9 24.pdf | 4 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 135 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SILVER PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SURYANAGARI13,700+ in Pune
Filed coordinates, straight-line distance. 109 registered projects within 2 km.
Vrundavan Park
Sunil Ganpati Aitavadekar
SAINAGAR
SHRIMUDRA CONSTRUCTION
MAGIC GREEN CITY PART 2
Magic Homes
ARYA SQUARE
SAIRAJ INFRA
SWAPNAPURTI
Mandar Shrikant Sikachi
Deshpande Somani Square
Somani Landmarks LLP
Builder: GOLE & HOLE BUILDERS
GOLE & HOLE BUILDERS has 1 registration on MahaRERA, including SILVER PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SILVER PARK is delayed beyond 1 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVER PARK?
The registered promoter entity is GOLE & HOLE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVER PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SILVER PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVER PARK?
The professionals named in the filing: Architect: MR ABHIJEET ANIL KALE; Engineer: MR ABHIJEET ANIL KALE; Chartered Accountant: MR SAMRAT ASHOK SOMANI; Chartered Accountant: Mr Lalaso B Dhaygude. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVER PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.