Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
3 of 4Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

SILVER OAK VILLAS is a Others project by DEEPAK BHAUSAHEB KATE in Pune, Maharashtra, registered with MahaRERA as P52100048954 on 24 Jan 2023. Possession is promised by 16 Dec 2027. 1 of the 4 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameSILVER OAK VILLAS
  • TypeOthers
  • Location
    • MALEGAON ROAD
    • KASBA
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048954
  • ReraGenie IDRG-MH-83064

Builder

  • NameDEEPAK BHAUSAHEB KATE
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion16 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed104 files

Current status

25%1 of 4 units booked

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SILVER OAK VILLAS B WINGNA22101
SILVER OAK VILLAS A and C WINGNA20303
SILVER OAK VILLAS D WINGNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

SILVER OAK VILLAS B WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SILVER OAK VILLAS A and C WING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SILVER OAK VILLAS D WING36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes33%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
TRIPTI RAJENDRA SHITOLEBaramati RuralPune
ABHIMAN SHIVRAM VAIHAREBaramati RuralPune

Approvals and building plan

Sanctioning authorityBARAMATI NAGAR PARISHAD
Permissible FSI1805.04
Proposed, not sanctioned1,805 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBaramati

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Engineerdeepak kate
Chartered AccountantPritam Suryakant Pahade
PartnerRole in project
DEEPAK BHAUSAHEB KATE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2023

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q4 2025-26.pdf17 Apr 2026
Form 2File: Form 2 Q4 2025-26.pdf17 Apr 2026
Form 3File: Form 3 Q4 2025-26.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Q4 2025-26.pdf17 Apr 2026
Form 1File: Form 1 QTR 3 Silver Oak.pdf13 Jan 2026
Form 2File: Form 2 QTR 3 Silver Oak.pdf13 Jan 2026
Form 3File: Form 3 QTR 3 Silver Oak.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sell Book QTR 3 Silver Oak.pdf13 Jan 2026
Form 2A (FY 2023-2024)File: form 2a 2024 2025.pdf13 Jan 2026
Form 2A (FY 2022-2023)File: form 2a 2024 2025.pdf13 Jan 2026
Form 2A (FY 2025-2026)File: Form 2A QTR 3 Silver Oak.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: finlly f5.pdf9 Oct 2025
Form 1File: Form 1 Silver Oak 25-26.pdf8 Oct 2025
Form 2File: Form 2 Silver Oak 25-26.pdf8 Oct 2025
Form 3File: Form 3 Silver Oak 25-26.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Silver Oak 25-26.pdf8 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A_page-0001.pdf8 Oct 2025
Form 1File: F1.pdf22 Jul 2025
Form 2File: F2.pdf22 Jul 2025
Form 3File: F3.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD .pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Silver Oak Correction.pdf3 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Q4 24-25.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 24-25.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 24-25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Booked Sold Q4 24-25.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4 24-25.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Oak Form 3 Rera.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Silver Oak Form 1 Q4.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Oak Form 3 Q4.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Silver Oak Form 2 Q4.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Sell Booked Silver Oak Q4.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Silver Oak Form 2A Q4.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr2 24-25.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QTR2 24-25.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sell Booked QTR2 24-25.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form V QTR2 24-25.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q1 2024.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 24.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Q1 2024.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Q1 2024.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2024.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 QTR 4 23-24.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QTR4 Silver Oak 23-24.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QTR 4.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Fourth Qtr.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: Sell Booked 4 QTR.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Quarter 1 Jan to Mar 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Quarter 1 Jan to Mar 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quarter 3 July to Sept 23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 24.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 24.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Jan 24.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Sell booked Jan 24.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 24.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 So.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 So.pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 So.pdf22 Dec 2023
Other - LegalFile: Project is under progress.pdf27 Nov 2023
Other - TechnicalFile: Project is under progress.pdf27 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Silver Oak OC.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: April 23 Silver Oak.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 S QTR 1.pdf15 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 S QTR 1.pdf15 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 0423.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 0723.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 1023.pdf4 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 300623.pdf4 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct 23 SO.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTR 1 Form 2A 040423.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTR 2Form 2A 070723.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Oct 23.pdf4 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July23.pdf4 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1023.pdf4 Oct 2023
Other - FinanceFile: Form 3 1023.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf25 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Silver Oak.pdf24 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report Form 5 Silver Oak.pdf24 Sep 2023
Disclosure of sold/ booked inventoryFile: Silver Oak Sold July.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: Silver Oak Sold July.pdf13 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ABOLI RESIDENCYGAT NO 25422CompletedAug 2022Feb 2022
GULMOHOR VILLASGAUTAM BAG BARAMATI3CompletedFeb 2020Feb 2020

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER OAK VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASBA13,700+ in Pune

2 kmSILVER OAK VILLASCompleted 9Lapsed / revoked 5Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: DEEPAK BHAUSAHEB KATE

DEEPAK BHAUSAHEB KATE has 3 registrations on MahaRERA, including ABOLI RESIDENCY and SILVER OAK VILLAS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SILVER OAK VILLAS is delayed beyond 16 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER OAK VILLAS?

The registered promoter entity is DEEPAK BHAUSAHEB KATE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER OAK VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER OAK VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER OAK VILLAS?

The professionals named in the filing: Engineer: deepak kate; Chartered Accountant: Pritam Suryakant Pahade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER OAK VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER OAK VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER OAK VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.