ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SILVER 9 B WING

Registered No litigation declared Residential / Group Housing project

SILVER 9 B WING

By SILVER PROPERTIES

RG-MH-22477 · RERA P52100032298 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 26 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 26 months from the original
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
77 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

SILVER 9 B WING is a Residential / Group Housing project by SILVER PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100032298 on 29 Dec 2021. Possession is promised by 30 Dec 2027. The completion date has moved by 26 months from the original filing. 22 of the 99 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSILVER 9 B WING
  • TypeResidential / Group Housing
  • Location
    • MOSHI
    • BORHADEWADI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032298
  • ReraGenie IDRG-MH-22477

Builder

  • NameSILVER PROPERTIES
  • Entity typePartnership
  • PartnersSOMNATH KANTILAL SASTE, VIKAS NAMDEO SANE, SANTOSH SITARAM BARNE, KIRAN KISAN SAWANT
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2021First promiseOct 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2021
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 31 Oct 2025)
  • Buildings1 building record
  • Documents filed56 files

Current status

22%22 of 99 units booked
13.3%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA161399099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

B WING: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered68
Open Space7

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
M/s Pristine PropertiesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI10241.07
Proposed, not sanctioned10,241 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD FLR SHOP NO 1 3 4 5 KAMALRAJ ESTATE KAMALRAJ CENTRAL MOSHI DEHU ROAD PIMPRI CHINCHWAD MAHARASHTRA 412105
Estimated costRs 26.50 cr
Cost incurredRs 3.53 cr
Work done13.33%
BuildingWingEstimatedIncurred
B WINGNARs 22.00 crRs 3.18 cr
-NARs 4.50 crRs 35.33 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR
EngineerMR KUNAL GAIKWAD
EngineerMAHADEV PARAJI ASWALE
EngineerAnant Shankar Warade
Chartered AccountantNAVDEEP PAWANKUMAR JINDAL
Chartered AccountantCA Dolly Gandhi
Chartered AccountantSheetal Nadeep Jindal
PartnerRole in project
SILVER PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019695Oct 2025 → Dec 2027

Reason as filed by the promoterdelay in revised sanction plan.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Dec_25.pdf22 May 2026
Withdrawal Update Form 1File: Form 1_Mar_26.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 Dec_25 Sign.pdf22 May 2026
Withdrawal Update Form 2File: Form -2 Mar_26 Sign.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 Dec_25 Sign_compressed.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 Mar_26 Sign compressed.pdf22 May 2026
Form 5 (FY 2023-2024)File: form 5 signed b wing sheetal mam.pdf22 Dec 2025
Building plan approvalFile: B WING PARKING PLAN.pdf26 Nov 2025
Building plan approvalFile: B WING 1ST TO 13 FLOOR PLAN.pdf26 Nov 2025
Building plan approvalFile: B WING 7 & 11 FLOOR PLAN.pdf26 Nov 2025
Building plan approvalFile: B WING ELEVATION PLAN.pdf26 Nov 2025
Form 2A (FY 2024-2025)File: 2A B Wing.pdf5 Nov 2025
Withdrawal Update Form 1File: Architec certificate new 15-9-2025.pdf10 Oct 2025
Withdrawal Update Form 2File: From -2 Engineer Silver properties B Wing.pdf10 Oct 2025
Withdrawal Update Form 3File: From - 3 Ca certificate silver propeties B - wing 30-9-2025_compressed.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 B wing signed..pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf4 Jul 2025
Withdrawal Update Form 2File: Form-2 Signed.pdf4 Jul 2025
Withdrawal Update Form 3File: Form-3 Signed.pdf4 Jul 2025
Form 1File: FORM 1.pdf28 Jun 2025
Form 2File: Form -2 B-wing 30-6-2024.pdf28 Jun 2025
Form 3File: Form 3 Date - 14-6-24 Signed_11zon.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory jun 24.pdf28 Jun 2025
Form 1File: Architect certificate 19-3-2025 B-wing From-1.pdf28 Jun 2025
Form 2File: Form -2 B-wing 7-3-2025.pdf28 Jun 2025
Form 3File: form3Date 7-3-25 Signed_compressed.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE B WING SOLd.pdf28 Jun 2025
Details of encumbrancesFile: Encumbarance Letter.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Date - 14-6-24 Signed_11zon.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 B-wing 30-6-2024.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE B WING.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER QUALITY CERTIFICATE 23-24.pdf29 Jun 2024
Disclosure of sold/ booked inventoryFile: B WING DISCLOUSURE OF FLAT.pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA ANNUAL REPORT B BULDING.pdf29 Jun 2024
Declaration in FORM BFile: NOTRY AFFIDAVIT B WING RERA.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE B WING.pdf20 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf14 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Image_003.pdf10 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SILVER PROPERTIES-B WING.pdf2 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER - SILVER 9 B BUILDING.pdf23 Dec 2021
Declaration in FORM BFile: Declaration in FORM B - PROMOTER.pdf22 Dec 2021
CERSAI detailsFile: CERSAI - SILVER 9 B WING.pdf22 Dec 2021
Copy of the legal title reportFile: SEARCH REPORT silver B wing.pdf13 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: cc (1).pdf23 Oct 2021
Declaration about Commencement CertificateFile: commencement certificate [format d].pdf23 Oct 2021
Layout approvalFile: 4 B Wing Layout plan.pdf6 Oct 2021
Building plan approvalFile: 3 B wing.pdf6 Oct 2021
PAN CardFile: Copy of Pan Card - Silver Properties.pdf6 Oct 2021
Details of encumbrancesFile: ENCUBRANCE CERIFICATE B WING.pdf6 Oct 2021
Copy of Layout Approval (in case of layout)File: 4 B Wing Layout plan.pdf6 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 3 B wing.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate From 02.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE OF CA.pdf6 Oct 2021
Proforma of Allotment letterFile: FLAT DRAFT AGREEMENT - B BUILDING (2).pdf6 Oct 2021

How this compares with Pune

22%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 26 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER 9 B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORHADEWADI13,700+ in Pune

2 kmSILVER 9 B WINGCompleted 72Lapsed / revoked 44Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: SILVER PROPERTIES

SILVER PROPERTIES has 4 registrations on MahaRERA, including SILVER 9 and SILVER 9. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SILVER 9 B WING is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER 9 B WING?

The registered promoter entity is SILVER PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER 9 B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER 9 B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER 9 B WING?

The professionals named in the filing: Architect: SACHIN SUTAR; Engineer: MR KUNAL GAIKWAD; Engineer: MAHADEV PARAJI ASWALE; Engineer: Anant Shankar Warade; Chartered Accountant: NAVDEEP PAWANKUMAR JINDAL; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER 9 B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER 9 B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER 9 B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.