SILICON PARK BUILDING NO 3

By IMPACT CONSTRUCTION CO

RG-MH-53176 · RERA P51800049136 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 17%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SILICON PARK BUILDING NO 3 is a Others project by IMPACT CONSTRUCTION CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049136 on 1 Feb 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameSILICON PARK BUILDING NO 3
  • TypeOthers
  • Location
    • JANKALYAN NAGAR
    • OFF MARVE ROAD
    • MALAD WEST
    • Malvani
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049136
  • ReraGenie IDRG-MH-53176

Builder

  • NameIMPACT CONSTRUCTION CO
  • Entity typePartnership
  • GSTIN27AABFI6423J1ZD
  • PartnersKARIM JUSAB HALAI, ASIF JUSAB HALAI, MIRSHAD AHMED HALAI, MUNIR AHMED HALAI, SUHAIL ASIF HALAI, AHMED JUSAB HALAI, AKBAR SULEMAN JAGRALA, HAKIM UMARFAROOK JAGRALA, MOHAMMAD AKBAR JAGRALA, HASHIM UMARFAROOQUE JAGRALA, MUSTAKIM UMARFAROOQ JAGRALA, AZIZ JUSAB HALAI and 3 more

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SILICON PARK BUILDING NO 3NA1818000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 17%.

SILICON PARK BUILDING NO 3: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure17%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered106
Open Space6

Land and ownership13

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,388 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Apr 2026
LandownerVillageDistrict
JOSEPHINE PATRICK HENDRIQUESMaladMumbai Suburban
M/s. ELITE ENTERPRISESMaladMumbai Suburban
MRS. PAULINE JOHN PATELBandraMumbai Suburban
BASTAV SANTIA GRACIUSMaladMumbai Suburban
MR. MAICHEAL SANTIA GRACIUSMaladMumbai Suburban
MR. CHARLIE SANTIA GRACIUSMaladMumbai Suburban
MRS. MARY JACOB PATELMaladMumbai Suburban
MR. ROMAN WILLIAM GRACIOUS ( GHARSI )BandraMumbai Suburban
MR. SIMON LOUIS GOMES & MR. VALERIAN SIMON GOMESMumbai SuburbanMumbai Suburban
MR. BASIEL SIMON GOMES & MR. LOUIS SIMON GOMESMumbai SuburbanMumbai Suburban
MR. FROSTER LOUIS GOMES & MRS. ELSIE PAUL GRACIOUSMumbai SuburbanMumbai Suburban
MR. SHAMIM AHMED REHMATULLA GUBTIRABandraMumbai Suburban
MR. FURKAN REHMATULLA GUBITRABandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7424.15
Proposed, not sanctioned5,515 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 - 2, AYESHA TOWER, S V ROAD, JOGESHWARI WEST, MUMBAI - 400102

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAMUNDA CONSULTANT
EngineerRAOSAHEB DHONDI MAGNUM
Chartered AccountantKAZI & ASSOCIATES
Chartered AccountantSELIYA AND ASSOCIATES
PartnerRole in project
IMPACT CONSTRUCTION CO-

Litigation declared1

CaseCourtStatus
108530/1995CITY CIVIL COURT MUMBAINOTICE OF MOTION IS DISMISSED ONLY SUIT IS PENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf3 Feb 2026
Form 2File: Form 2.pdf3 Feb 2026
Form 3File: Form 3.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf3 Feb 2026
Form 1File: Form 1.pdf23 Jan 2026
Form 2File: Form 2.pdf23 Jan 2026
Form 3File: Form 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf23 Jan 2026
Form 5 (FY 2022-2023)File: FORM 5 2022-23.pdf8 Oct 2025
Form 5 (FY 2023-2024)File: FORM 5 2023-24.pdf8 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3_11zon.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_11zon.pdf7 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Upto 17th Floor.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FY 2024-25 Impact Form 2 - Engineer Certificate 25_02_2025 (1).pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q3 FY 2024-25.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1)_11zon.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Rera Certificate.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 FORM 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 FORM 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 FORM 3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Architect Certificate.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (6).pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Impact Form 2 - Engineer Certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (1).pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 (2).pdf2 Dec 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Impact Form 2 - Engineer Certificate rera 17112023_compressed.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3_compressed.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (6).pdf9 Nov 2023
Layout approvalFile: Layout Amended Plan_compressed.pdf25 Jul 2023
Building plan approvalFile: Latest IOD Plan 26-05-2023-2.pdf25 Jul 2023
Building plan approvalFile: Latest IOD Plan 26-05-2023-3.pdf25 Jul 2023
Building plan approvalFile: Latest IOD Plan 26-05-2023-4.pdf25 Jul 2023
Building plan approvalFile: Latest IOD Plan 26-05-2023-5.pdf25 Jul 2023
Building plan approvalFile: Layout Amended Approved Letter.pdf25 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout Amended Plan_compressed.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest IOD Plan 26-05-2023-2.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest IOD Plan 26-05-2023-3.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest IOD Plan 26-05-2023-4.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest IOD Plan 26-05-2023-5.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Amended Approved Letter.pdf25 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Upto 12th Floor.pdf25 Jul 2023
Building plan approvalFile: Latest IOD 26-05-2023.pdf21 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest IOD 26-05-2023.pdf21 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Upto 12th Floor.pdf21 Jul 2023
Declaration about Commencement CertificateFile: Form D Declaration.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4 FY 2022-2023_compressed.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1 FY 2023-24_compressed.pdf21 Jul 2023
Copy of the legal title reportFile: NEW TITLE REPORT.pdf23 Jan 2023
Copy of the legal title reportFile: Title Certificate - Annexure 1_1-10.pdf23 Jan 2023
Copy of the legal title reportFile: Title Certificate - Annexure 1_11-20.pdf23 Jan 2023
Copy of the legal title reportFile: Title Certificate - Annexure 1_21-end.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_1-11.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_12-22.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_23-33.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_34-43.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_44-53.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_54-63.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_64-73.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_74-83.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_84-93.pdf23 Jan 2023
Copy of the legal title reportFile: Search Reports_94-end.pdf23 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOURE ANNEXURE A 1.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: LEGAL AND FINANCE.pdf11 Jan 2023
Details of encumbrances concerned to LegalFile: LEGAL AND FINANCE.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (4).pdf22 Dec 2022
Layout approvalFile: Approved Plans_1-1.pdf20 Dec 2022
Building plan approvalFile: IOD.pdf20 Dec 2022
Building plan approvalFile: Approved Plans_2-2.pdf20 Dec 2022
Building plan approvalFile: Approved Plans_3-3.pdf20 Dec 2022
Building plan approvalFile: Approved Plans_4-4.pdf20 Dec 2022
Building plan approvalFile: Approved Plans_5.pdf20 Dec 2022
PAN CardFile: COMPANY PANCARD.pdf20 Dec 2022
Details of encumbrances concerned to FinanceFile: FINAL AND LEGAL.pdf20 Dec 2022
Details of encumbrances concerned to LegalFile: FINAL AND LEGAL.pdf20 Dec 2022
Copy of Layout Approval (in case of layout)File: Approved Plans_1-1.pdf20 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf20 Dec 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILICON PARK BUILDING NO 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmSILICON PARK BUILDING NOCompleted 4Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: IMPACT CONSTRUCTION CO

IMPACT CONSTRUCTION CO has 1 registration on MahaRERA, including SILICON PARK BUILDING NO 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SILICON PARK BUILDING NO 3 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILICON PARK BUILDING NO 3?

The registered promoter entity is IMPACT CONSTRUCTION CO, a partnership as per the filing. Its GSTIN 27AABFI6423J1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILICON PARK BUILDING NO 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILICON PARK BUILDING NO 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILICON PARK BUILDING NO 3?

The professionals named in the filing: Architect: CHAMUNDA CONSULTANT; Engineer: RAOSAHEB DHONDI MAGNUM; Chartered Accountant: KAZI & ASSOCIATES; Chartered Accountant: SELIYA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILICON PARK BUILDING NO 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILICON PARK BUILDING NO 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILICON PARK BUILDING NO 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.