Red flags

  • 8 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
8Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai is a Others project by Piramal Sunteck Realty Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700011528 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Apr 2022. 8 complaints are on record with the regulator.

At a glance

Project

  • NameSignia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai
  • TypeOthers
  • Location
    • Sector 12
    • Airoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400708
  • Pincode400708
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700011528
  • ReraGenie IDRG-MH-91220

Builder

  • NamePiramal Sunteck Realty Pvt. Ltd.
  • Entity typeCompany
  • DirectorPrashant Chaubey
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedApr 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Apr 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Signia Waterfront Phase 1NA410000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Signia Waterfront Phase 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed298

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots298
Closed/Covered258
Open Space40

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,322 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12482.0
Proposed, not sanctioned12,482 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSenorita, Plot No 21, Gulmohar Road, Near Juhu Circle,Vile Parle West, Mumbai-400049

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSoyuz Talib Architects Pvt. Ltd
EngineerStructural Concept Design Pvt. Ltd
PartnerRole in project
Piramal Sunteck Realty Pvt. Ltd.-

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000012070Narayan ManePiramal Sunteck Realty Pvt Ltd22/11/2017
CC006000000220802ROHAN DSILVAPIRAMAL SUNTECK REALTY PVT LTD23/04/2022
CC006000000197845Shnehal BedradiKamal Khetan12/08/2021
CC006000000210223Abhijit VicharePiramal Sunteck Realty Private Limited07/03/2022
CC006000000210252Dinesh PurushePIRAMAL SUNTECK REALTY Pvt Ltd08/03/2022
CC006000000210328MANIK NAMDEO MUNDPHAN & KUSUM MUNDPHANPIRAMAL SUNTECK REALTY PRIVATE LIMITED08/03/2022
CC006000000251334Ajay Sitaram GudulkarPIRAMAL SUNTECK REALTY PRIVATE LIMITED01/06/2022
CC006000000333940Narayan Laxman ManePiramal Sunteck Realty P Ltd17/01/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2022

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Encumbrance Certificate waterfront_2022 11 11.pdf21 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Waterfront_2021-22.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 ENGINEER'S CERTIFICATE Waterfront_Mar-22.pdf16 May 2022
Certificates of CA (Form 3)File: Form 3-CA Certificate Waterfront_2022 04 22.pdf16 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-01.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-02.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-03.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-04.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-05.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-06.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-07.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-08.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-09.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-09.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-10.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-11.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-12.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-13.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-14.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-15.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-16.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-17.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-18.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-19.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-20.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-21.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_0712-22.pdf18 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2022 01 25 Occupation Certificate.pdf16 Feb 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 ARCHITECT'S CERTIFICATE Waterfront.pdf16 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_Jan-22.pdf12 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Signia Waterfront_Jan-22.pdf10 Jan 2022
Certificates of CA (Form 3)File: Form 3-CA Certificate Waterfront_2022 01 22.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Signia Waterfront Oct21.pdf16 Oct 2021
Certificates of CA (Form 3)File: Form 3-CA Certificate Waterfront_Oct-21.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - Signia Waterfront.pdf30 Sep 2021
Certificates of CA (Form 3)File: CA Certificate Signoff Signia Waterfront_Sep-21.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Signia Waterfront-2020-21.pdf30 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter for society formation in process to upload on RERA.pdf25 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_Aug-21.pdf23 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_June-21.pdf22 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_Mar-21.pdf23 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_Dec-20.pdf22 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate-2019-20 -final to upload.pdf1 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE Signia Waterfront_Sep-20.pdf14 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE Signia Waterfront Jan20.pdf31 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Signia WaterfrontOct19.pdf1 Nov 2019
Form 2AFile: 2019 06 FORM 2A Quality Assurance Certificate Signia Waterfront.pdf1 Oct 2019
Form 2AFile: 2019 09 FORM 2A Quality Assurance Certificate Signia Waterfront.pdf1 Oct 2019
Certificates of CA (Form 5)File: RERA Certificate Waterfront 2019 (1).pdf30 Sep 2019
Form 2AFile: 2019 03 FORM 2A Quality Assurance Certificate Signia Waterfront.pdf30 Apr 2019
Form 2AFile: FORM 2A Quality Assurance Certificate Signia Waterfront.pdf16 Jan 2019
Details of encumbrancesFile: Encumbrance Certificate waterfront151018.pdf26 Oct 2018
Certificates of CA (Form 5)File: SIGNIA WATERFRONT.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Covering Letter of Amended CC 10th Apr 2018.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Waterfront drawing.pdf30 Apr 2018
Details of encumbrancesFile: Encumbrances050218.pdf6 Feb 2018
Layout approvalFile: 02] Signia Waterfront 2015 11 30 Final.pdf31 Jul 2017
Building plan approvalFile: 02] Signia Waterfront 2015 11 30 Final.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 02] Signia Waterfront 2015 11 30 Final.pdf31 Jul 2017
Building Plan Approval (IOD)File: 02] Signia Waterfront 2015 11 30 Final.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 02] Signia Waterfront 2015 11 30 Final.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Signia Waterfront 2016 09 12 Further CC Final.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit cum Declaration Waterfront 31 07 2017.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 310717.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA G S DOOT and CO.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale Waterfront 25072017.pdf31 Jul 2017
OtherFile: BLOCK-plan-Model.pdf31 Jul 2017
Copy of the legal title reportFile: Title Report Waterfront 15042016.pdf30 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate waterfront250717.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 270717 01.pdf30 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Signia SkySignia Skys Starkey Town Chhaoni Nagpur 44000136CompletedOct 2014Late, Jan 2015
Signia OceansSignia Oceans Plot No. 7 & 8 Sector 10A Next to D-mart Airoli Navi Mumbai 40070880CompletedMar 2014Late, Dec 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Signia Waterfront, Plot No. 1, Sector 12, Ai on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Airoli7,600+ in Thane

2 kmSignia Waterfront, Plot Completed 3Lapsed / revoked 3Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Piramal Sunteck Realty Pvt. Ltd.

Piramal Sunteck Realty Pvt. Ltd. has 1 registration on MahaRERA, including Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai is delayed beyond 30 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

The registered promoter entity is Piramal Sunteck Realty Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

The professionals named in the filing: Architect: Soyuz Talib Architects Pvt. Ltd; Engineer: Structural Concept Design Pvt. Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Signia Waterfront, Plot No. 1, Sector 12, Ai to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.