ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SIGNATURE DESIRE

Completed No litigation declared Residential / Group Housing project

SIGNATURE DESIRE

By Satyam Homes

RG-MH-93498 · RERA P52000016954 · Last updated on MahaRERA portal: 29 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
34 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

SIGNATURE DESIRE is a Residential / Group Housing project by Satyam Homes in Raigarh, Maharashtra, registered with MahaRERA as P52000016954 on 25 Jun 2018. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSIGNATURE DESIRE
  • TypeResidential / Group Housing
  • Location
    • B/H HONDA SHOW ROOM
    • HALIVALI
    • Haliwali
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000016954
  • ReraGenie IDRG-MH-93498

Builder

  • NameSatyam Homes
  • Entity typePartnership
  • PartnersMANISHKUMAR C RAMJIYANI, BHUPENDRA D PATEL, PANKAJ V PATEL, ASHVIN C PATEL, NARENDRA M PATEL, PANKAJ M PATEL, SHAILESH A PATEL, VINDO M PATEL
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJun 2018First promiseDec 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jun 2018
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Dec 2022)
  • Buildings4 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA40000
BNA40000
CNA40000
DNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 29 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,930 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3878.06
Proposed, not sanctioned3,852 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 38 AND 39 PATEL HERITAGE PLOT NO 15 AND 17 SECTOR 7 KHARGHAR NAVI MUMBAI 410210

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAGARKAR & ASSOCIATES
EngineerK R PATEL & ASSOCIATES
PartnerRole in project
Satyam Homes-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017058Dec 2022 → Dec 2023

Reason as filed by the promoterDate: 07/07/2023 To, Maharashtra Real Estate Regulatory Authority (MahaRERA HEADQUARTERS) BKC, E-Block, 7th Floor, Housefin Bhavan, near RBI, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051 Subject: An application for extension under section 7(3) Reference No: RERA No. P52000016954 Dear Sir/Madam, I am writing in response to the show cause notice dated 29/05/2023 regarding the lapsed project under RERA No. P52000016954. We apologize for the delay in compliance and appreciate the opportunity to provide an explanation. During our online meeting on 23-jun-2023, it was communicated t

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000210254PRADEEP VIRSEN SOLANKIM/S. SATYAM HOME THROURH PANKAJ PATEL31/03/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Apr 2024

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2nd Phase OC Desire.pdf29 Apr 2024
Declaration in FORM BFile: from B affidavit cum Declaration.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A Quality Assurance Certificate (1).pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A Quality Assurance Certificate.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold_compressed.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-1.pdf7 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 K R PATEL ASSOCIATES.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From - 2A Quality assurance certificate.pdf7 Jul 2023
Certificates of CA (Form 3)File: FORM 3-1.pdf7 Jul 2023
Certificates of CA (Form 3)File: FORM - 3_ABCD_Jan 2023 compressed.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5_FY 18-19_Signature Desire_Final.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5_FY 19-20_Signature Desire.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5_FY 20-21_Signature Desire.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From 5_FY 21-22_Signature Desire.pdf11 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: DocScanner.pdf27 Dec 2022
Details of encumbrancesFile: Encr Certi II_Updation.pdf28 Jan 2019
OtherFile: Uploaded_Mortgage Deed_1.pdf28 Jan 2019
OtherFile: Uploaded_Mortgage Deed_2.pdf28 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate wing 4.pdf23 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SATYAM HOME RERA CERTIFICATE-ilovepdf-compressed.pdf13 Jun 2018
Certificates of CA (Form 3)File: RERA CERTIFIACTE.pdf13 Jun 2018
Proforma of Allotment letterFile: 1.pdf13 Jun 2018
Layout approvalFile: layout-ilovepdf-compressed.pdf8 Jun 2018
Building plan approvalFile: layout-ilovepdf-compressed.pdf8 Jun 2018
Layout approvalFile: PL1-ilovepdf-compressed.pdf8 Jun 2018
Layout approvalFile: PL2-ilovepdf-compressed.pdf8 Jun 2018
Details of encumbrancesFile: Encumbrances.pdf8 Jun 2018
Copy of Layout Approval (in case of layout)File: layout-ilovepdf-compressed.pdf8 Jun 2018
Copy of Layout Approval (in case of layout)File: PL1-ilovepdf-compressed.pdf8 Jun 2018
Copy of Layout Approval (in case of layout)File: PL2-ilovepdf-compressed.pdf8 Jun 2018
Building Plan Approval (IOD)File: layout-ilovepdf-compressed.pdf8 Jun 2018
Declaration in FORM BFile: Form B-ilovepdf-compressed (1).pdf8 Jun 2018
OtherFile: SH.pdf8 Jun 2018
PAN CardFile: SATYAM HOMES- PAN CARD.pdf7 Jun 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf7 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ilovepdf-compressed.pdf7 Jun 2018

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIGNATURE DESIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HALIVALI5,900+ in Raigarh

Builder: Satyam Homes

SATYAM HOMES has 2 registrations on MahaRERA, including SIGNATURE DESIRE and SIGNATURE DESIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SIGNATURE DESIRE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIGNATURE DESIRE?

The registered promoter entity is Satyam Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIGNATURE DESIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIGNATURE DESIRE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIGNATURE DESIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIGNATURE DESIRE?

The professionals named in the filing: Architect: NAGARKAR & ASSOCIATES; Engineer: K R PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE DESIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE DESIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE DESIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.