Home / Browse projects / Raigarh, Maharashtra / SIGNATURE DESIRE
SIGNATURE DESIRE
By Satyam Homes
RG-MH-93498 · RERA P52000016954 · Last updated on MahaRERA portal: 29 Apr 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIGNATURE DESIRE is a Residential / Group Housing project by Satyam Homes in Raigarh, Maharashtra, registered with MahaRERA as P52000016954 on 25 Jun 2018. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSIGNATURE DESIRE
- TypeResidential / Group Housing
- Location
- B/H HONDA SHOW ROOM
- HALIVALI
- Haliwali
- Karjat
- Raigarh
- 410201
- Pincode410201
- RERA no.P52000016954
- ReraGenie IDRG-MH-93498
Builder
- NameSatyam Homes
- Entity typePartnership
- PartnersMANISHKUMAR C RAMJIYANI, BHUPENDRA D PATEL, PANKAJ V PATEL, ASHVIN C PATEL, NARENDRA M PATEL, PANKAJ M PATEL, SHAILESH A PATEL, VINDO M PATEL
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Jun 2018
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 30 Dec 2022)
- Buildings4 building records
- Documents filed37 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 4 | 0 | 0 | 0 | 0 |
| B | NA | 4 | 0 | 0 | 0 | 0 |
| C | NA | 4 | 0 | 0 | 0 | 0 |
| D | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 29 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
34 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAGARKAR & ASSOCIATES |
| Engineer | K R PATEL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Satyam Homes | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDate: 07/07/2023 To, Maharashtra Real Estate Regulatory Authority (MahaRERA HEADQUARTERS) BKC, E-Block, 7th Floor, Housefin Bhavan, near RBI, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051 Subject: An application for extension under section 7(3) Reference No: RERA No. P52000016954 Dear Sir/Madam, I am writing in response to the show cause notice dated 29/05/2023 regarding the lapsed project under RERA No. P52000016954. We apologize for the delay in compliance and appreciate the opportunity to provide an explanation. During our online meeting on 23-jun-2023, it was communicated t
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000210254 | PRADEEP VIRSEN SOLANKI | M/S. SATYAM HOME THROURH PANKAJ PATEL | 31/03/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jun 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jun 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Apr 2024
Documents filed37
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2nd Phase OC Desire.pdf | 29 Apr 2024 |
| Declaration in FORM BFile: from B affidavit cum Declaration.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A Quality Assurance Certificate (1).pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A Quality Assurance Certificate.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_compressed.pdf | 17 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-1.pdf | 7 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 K R PATEL ASSOCIATES.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From - 2A Quality assurance certificate.pdf | 7 Jul 2023 |
| Certificates of CA (Form 3)File: FORM 3-1.pdf | 7 Jul 2023 |
| Certificates of CA (Form 3)File: FORM - 3_ABCD_Jan 2023 compressed.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5_FY 18-19_Signature Desire_Final.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5_FY 19-20_Signature Desire.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5_FY 20-21_Signature Desire.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From 5_FY 21-22_Signature Desire.pdf | 11 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DocScanner.pdf | 27 Dec 2022 |
| Details of encumbrancesFile: Encr Certi II_Updation.pdf | 28 Jan 2019 |
| OtherFile: Uploaded_Mortgage Deed_1.pdf | 28 Jan 2019 |
| OtherFile: Uploaded_Mortgage Deed_2.pdf | 28 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate wing 4.pdf | 23 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SATYAM HOME RERA CERTIFICATE-ilovepdf-compressed.pdf | 13 Jun 2018 |
| Certificates of CA (Form 3)File: RERA CERTIFIACTE.pdf | 13 Jun 2018 |
| Proforma of Allotment letterFile: 1.pdf | 13 Jun 2018 |
| Layout approvalFile: layout-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Building plan approvalFile: layout-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Layout approvalFile: PL1-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Layout approvalFile: PL2-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Details of encumbrancesFile: Encumbrances.pdf | 8 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: layout-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: PL1-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: PL2-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Building Plan Approval (IOD)File: layout-ilovepdf-compressed.pdf | 8 Jun 2018 |
| Declaration in FORM BFile: Form B-ilovepdf-compressed (1).pdf | 8 Jun 2018 |
| OtherFile: SH.pdf | 8 Jun 2018 |
| PAN CardFile: SATYAM HOMES- PAN CARD.pdf | 7 Jun 2018 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 7 Jun 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 7 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ilovepdf-compressed.pdf | 7 Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 37 filed documents as one ZIP, foldered, with a manifest
Keep SIGNATURE DESIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HALIVALI5,900+ in Raigarh
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Satyam Homes
SATYAM HOMES has 2 registrations on MahaRERA, including SIGNATURE DESIRE and SIGNATURE DESIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SIGNATURE DESIRE is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIGNATURE DESIRE?
The registered promoter entity is Satyam Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIGNATURE DESIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIGNATURE DESIRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIGNATURE DESIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIGNATURE DESIRE?
The professionals named in the filing: Architect: NAGARKAR & ASSOCIATES; Engineer: K R PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIGNATURE DESIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback