Home / Browse projects / Jalgaon, Maharashtra / SIDDHIVINAYAK PRIDE
SIDDHIVINAYAK PRIDE
RG-MH-50163 · RERA P49900076685 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Jalgaon registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHIVINAYAK PRIDE is a Residential / Group Housing project by SIDDHIVINAYAK PRIDE in Jalgaon, Maharashtra, registered with MahaRERA as P49900076685 on 20 Jun 2024. Possession is promised by 31 Mar 2027.
At a glance
Project
- NameSIDDHIVINAYAK PRIDE
- TypeResidential / Group Housing
- Location
- MEHRUN SHIVAR
- NEAR LANDORKHORI
- Jalgaon
- 425002
- Pincode425002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49900076685
- ReraGenie IDRG-MH-50163
Builder
- NameSIDDHIVINAYAK PRIDE
- Entity typePartnership
- GSTIN27AEWFS9274E1Z6
- PartnersCHANDRESH KIRAN DAHAD, HARISH MANIKRAO SURVE, YOGESH ASHOK AHUJA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHIVINAYAK PRIDE | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
SIDDHIVINAYAK PRIDE: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| LIFT | Yes | 0% |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VISHWA RAVINDRA POTDAR | Jalgaon (M Corp.) | Jalgaon |
| AKASH RAVINDRA POTDAR | Jalgaon (M Corp.) | Jalgaon |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YASH P SHETH |
| Engineer | Yash Pankaj Seth |
| Engineer | MOHIT A PATIL |
| Chartered Accountant | DHARAM K SANKHALA |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK PRIDE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A 310325.pdf | 18 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 310326.pdf | 18 Jul 2026 |
| Form 1File: Form 1 Architect Certificate.pdf | 8 Jul 2026 |
| Form 2File: form 2 Engineer certificate.pdf | 8 Jul 2026 |
| Form 3File: Form 3 CA certificate Compress.pdf | 8 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 30 6 26.pdf | 8 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 8 Jul 2026 |
| Form 1File: Form1Architect Certificate 30924.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 30924.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 30924.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Soldandbooked.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 30924 Compressed.pdf | 6 Jul 2026 |
| Form 1File: Form1 Architect Certificate 311224.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 311224.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 311224.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 311224.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Form 1File: Form1 Architect Certificate 31325.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 31325.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 31325.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 31325.pdf | 6 Jul 2026 |
| Form 1File: Form1 Architect Certificate 3062025.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 30625.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 30625.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 30625.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Form 1File: Form1 Architect Certificate 30925.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 30925.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 30925.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 30925.pdf | 6 Jul 2026 |
| Form 1File: Form1 Architect Certificate 311225.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 311225.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 311225.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 311225.pdf | 6 Jul 2026 |
| Form 1File: Form1Architect Certificate 31326.pdf | 6 Jul 2026 |
| Form 2File: Form2 Engineer Certificate 31326.pdf | 6 Jul 2026 |
| Form 3File: Form3 CA Certificate 31326.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: soldandbooked.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Report 31326.pdf | 6 Jul 2026 |
| Form 1File: Form 1.pdf | 6 Jul 2026 |
| Form 2File: Form 2.pdf | 6 Jul 2026 |
| Form 3File: Form 3.pdf | 6 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Soldandbooked.pdf | 6 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: QPR.pdf | 6 Jul 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Jul 2024 |
| Other - FinanceFile: QPR.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (3).pdf | 11 Jul 2024 |
| Copy of the legal title reportFile: NEW RERA SEARCH REPORT_11zon.pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11zon_removed-pages-PDF.pdf | 27 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PARSURAM PATIL.pdf | 27 Apr 2024 |
| Other - TechnicalFile: OrderNo50of2024.pdf | 27 Apr 2024 |
| Building plan approvalFile: 6 BUILDING PLAN.pdf | 20 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 BUILDING PLAN.pdf | 20 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 7 COMMENCEMENT CERTIFICATE.pdf | 8 Apr 2024 |
| Proforma of Agreement for saleFile: 27 Agreement to sales.pdf | 8 Apr 2024 |
| Proforma of Allotment letterFile: 30 Proforma_Allotment_Letter.pdf | 8 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 39 BANK DECLARATION.pdf | 8 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: 40 Deviation Report with respect to Allotment letter.pdf | 8 Apr 2024 |
| Declaration about Commencement CertificateFile: 8 Declaration about Commencement Certificate.pdf | 6 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: 41 MODEL COPY OF AGREEMENT.pdf | 6 Apr 2024 |
| Layout approvalFile: 5 LAYOUT SCAN.pdf | 21 Mar 2024 |
| PAN CardFile: 1 PAN CARD.pdf | 21 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: 3 AND 4 NO LEGAL AND FINANCIAL.pdf | 21 Mar 2024 |
| Details of encumbrances concerned to LegalFile: 3 AND 4 NO LEGAL AND FINANCIAL.pdf | 21 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 5 LAYOUT SCAN.pdf | 21 Mar 2024 |
| Declaration in FORM BFile: 9 PROMOTER FORM_B_PRASURAM PATIL.pdf | 21 Mar 2024 |
| CERSAI detailsFile: 17 CERSAI DECLARATION.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ASHOK AHUJA.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: CHANDARESH DAHAD.pdf | 21 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: HARISH SURVE.pdf | 21 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalgaon
Computed across the 230+ Jalgaon projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHIVINAYAK PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR LANDORKHORI230+ in Jalgaon
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
SAI DHAM
JB ASSOCIATES
VARAD HEIGHTS
Toke And Dhake Associates
JAMUNA RESIDENCY
JAMUNA INFRA
KRUPA APARTMENT
ABRAHAM THOMAS MULLESSERIL
OM PREMIA
OMBUILDCORP
Om Prabha
Om Build Corp
See every Jalgaon project, with the district possession charts
Builder: SIDDHIVINAYAK PRIDE
SIDDHIVINAYAK PRIDE has 1 registration on MahaRERA, including SIDDHIVINAYAK PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalgaon district page.
Frequently asked questions
What are my rights if SIDDHIVINAYAK PRIDE is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHIVINAYAK PRIDE?
The registered promoter entity is SIDDHIVINAYAK PRIDE, a partnership as per the filing. Its GSTIN 27AEWFS9274E1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHIVINAYAK PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHIVINAYAK PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHIVINAYAK PRIDE?
The professionals named in the filing: Architect: YASH P SHETH; Engineer: Yash Pankaj Seth; Engineer: MOHIT A PATIL; Chartered Accountant: DHARAM K SANKHALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHIVINAYAK PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback