Home / Browse projects / Pune, Maharashtra / Siddhivinayak Park Part 1
Siddhivinayak Park Part 1
RG-MH-68519 · RERA P52100051715 · Last updated on MahaRERA portal: 27 Oct 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 18 months, 4 of them under MahaRERA's automatic 4-month extension
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Siddhivinayak Park Part 1 is a Residential / Group Housing project by Nilesh Uddhav Borate in Pune, Maharashtra, registered with MahaRERA as P52100051715 on 27 Jun 2023. Possession is promised by 30 Jun 2028. The completion date has moved by 18 months from the original filing, 4 of them under MahaRERA's automatic 4-month extension for the West Asia conflict. 47 of the 151 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSiddhivinayak Park Part 1
- TypeResidential / Group Housing
- Location
- Moshi Dehu Road
- Borhadewadi Moshi
- Borhadewadi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051715
- ReraGenie IDRG-MH-68519
Builder
- NameNilesh Uddhav Borate
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion30 Jun 2028
- Revised completionRevised to 30 Jun 2028 (originally 31 Dec 2026)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 27 Oct 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 16 | 14 | 112 | 39 | 151 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
A Building: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed308
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Building | NA | Rs 10.46 cr | Rs 9.85 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sudesh Kulange |
| Engineer | Vaishali Chapolikar |
| Engineer | VIJAY PRALHAD KOTHALKAR |
| Engineer | Ajay Vilas Bhilare |
| Engineer | Divakar Dinesh Pandey |
| Chartered Accountant | Vaibhav Modi |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Nilesh Uddhav Borate | - |
Extensions2
A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.
Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.
Reason as filed by the promoterThe execution of the project encountered unavoidable delays as sanctions for the upper floors were received at a later stage, owing to procedural delays in obtaining the necessary TDR permissions from the competent authority.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Oct 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Layout Plan upload.pdf | 27 Oct 2026 |
| Building plan approvalFile: Basement 1 and 2.pdf | 27 Oct 2026 |
| Building plan approvalFile: Ground and 1st Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: 2nd 3rd 4th and 5th Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: 6th 7th and 8th Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: 9th and 10th Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: 11th and 12th Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: 13th and Terrace Floor Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: Section CC Plan.pdf | 27 Oct 2026 |
| Building plan approvalFile: Elevation.pdf | 27 Oct 2026 |
| Building plan approvalFile: Section DD.pdf | 27 Oct 2026 |
| Form 2A (FY 2023-2024)File: FY 23-24.pdf | 21 Oct 2026 |
| Form 2A (FY 2024-2025)File: FY 24-25.pdf | 21 Oct 2026 |
| Form 2A (FY 2025-2026)File: FY25-26.pdf | 21 Oct 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Oct 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Oct 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3.pdf | 15 Oct 2026 |
| Form 5 (FY 2025-2026)File: Form 5 FY 25-26.pdf | 15 Oct 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Aug 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Siddhivinayak Park Final Upload.pdf | 28 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Final.pdf | 12 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Oct 2025 |
| Form 1File: Form 1.pdf | 19 Jul 2025 |
| Form 2File: Form 2.pdf | 19 Jul 2025 |
| Form 3File: Form 3 Final_compressed.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Circular Final.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2025.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE FOR QUALITY ASSURANCE.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2025.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: modi certificate.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate(2).pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate(2).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate Dec 2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate Dec 2024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold book inventory Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA (2).pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf | 31 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload- Final rera.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate 10-10-24.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold book inventory new.pdf | 22 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1 Signed.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload- Final.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate 10-10-24.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold book inventory new.pdf | 20 Oct 2024 |
| Proforma of Agreement for saleFile: Agreement draft-compressed.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca 2.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 05072024.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 07072024.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory .pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 05072024.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 07072024.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE 07072024.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory .pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PGMJ AND ASSOCIATE CA CERTIFICATE.pdf | 25 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PGMJ AND ASSOCIATE CA CERTIFICATE 1.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINER CERTIFICATE 31-12-2023.pdf | 23 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Siddhivinayak Park Part 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borhadewadi Moshi14,000+ in Pune
Filed coordinates, straight-line distance. 225 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Nilesh Uddhav Borate
Nilesh Uddhav Borate has 1 registration on MahaRERA, including Siddhivinayak Park Part 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Siddhivinayak Park Part 1 is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Siddhivinayak Park Part 1?
The registered promoter entity is Nilesh Uddhav Borate, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Siddhivinayak Park Part 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Siddhivinayak Park Part 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Siddhivinayak Park Part 1?
The professionals named in the filing: Architect: Sudesh Kulange; Engineer: Vaishali Chapolikar; Engineer: VIJAY PRALHAD KOTHALKAR; Engineer: Ajay Vilas Bhilare; Engineer: Divakar Dinesh Pandey; Chartered Accountant: Vaibhav Modi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Siddhivinayak Park Part 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback