Home / Browse projects / Mumbai Suburban, Maharashtra / SIDDHIVINAYAK

Completed No litigation declared Residential / Group Housing project

SIDDHIVINAYAK

By Triumph Ventures

RG-MH-68400 · RERA P51800011066 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • 3 extensions taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2021Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
4Complaints at MahaRERAon this registration
Jump to the 233 documents Report an error

SIDDHIVINAYAK is a Residential / Group Housing project by Triumph Ventures in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011066 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2021. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSIDDHIVINAYAK
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011066
  • ReraGenie IDRG-MH-68400

Builder

  • NameTriumph Ventures
  • Entity typePartnership
  • PartnersRajiv Shah, Anant Shah
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedJun 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings3 building records
  • Documents filed233 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA250000
WING BNA250000
WING CNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
WING A11
WING B11
WING C11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,940 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15295.5
Proposed, not sanctioned6,145 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL HALL BRANCH, ANDHERI EAST MUMBAI 400069

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIRANI ARCHITECTS
ArchitectELLORA PROJECT CONSULTANTS
EngineerJW CONSULTANTS LLP
Chartered AccountantDJ SHAH & ASSOCIATES
PartnerRole in project
Triumph Ventures-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013372Jun 2021 → Sep 2023

Reason as filed by the promoterCONSTRUCTION UPDATE, EXPLANATORY NOTE FOR DELAY AND REASON FOR EXTENSION OF THE SIDDHIVINAYAK PROJECT • We are seeking RERA Extension of the project till 30th September 2023. • We have received Amended FULL IOD of the Project on 12th October 2022 and Full CC on 16th December 2022. • We have received the Environment Clearance from the SEIAA on the 7th of December,2022. • Our Previous Cc was till the Top of 19th Floor and Full Core Area upto the top of Water Tank of all 3 Wings. • We have Applied for Part OC Upto the Top of 18 Floors of All 3 Wings on the 25th September,2022. We received Part OC

EXT51800017672Jun 2021 → Dec 2023

Reason as filed by the promoter• We are seeking RERA Extension of the project till 31sr December 2023. • We have received Amended FULL IOD of the Project on 12th October 2022 and Full CC on 16th December 2022. • We have received the Environment Clearance from the SEIAA on the 7th of December,2022. • We have received PART OC Upto the Top of 18 Floors of All 3 Wings viz A, B & C on 31st January 2023. • We have already given possession to the flat owners till 18th Floor of all the 3 wings (A, B & C). Construction work of All 3 Wings A, B & C is totally complete. We have initiated the process of obtaining Full OC with MHADA. Co

EXT51800009991Jun 2021 → Jun 2022

Reason as filed by the promoterReasons for Delay in the Project have been listed below - 1. Uncertainties in approval norms between 2016 to 2018 due to which plans had to be repeatedly amended leading. 2. Lack of clarity and delay in allotment of Pro Rate (Layout) FSI from Mhada due to non approval of Mhada layout by MCGM. Only once Mhada became the planning body could the FSI be relased by Mhada. 3. Non-Renewal of the Societies Lease Agreement till date. More than 200 Societies have been affected due to delay from Mhada. 4. Delay in approval process due to Multiple Bugs in the New BMC Plan Approval Software. 5. Delay in ap

Litigation declared1

CaseCourtStatus
WPL/2449/2017/2017HIGH COURTPENDING

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000198639Sudha Motiram MishraM/s. Siddhivinayak Developers11/10/2021
CC006000000375156GEETA PRAKASH MANEM/S TRIUMPH VENTURES07/04/2023
CC006000000480084SHALINI SUNIL UPADHYAYM/S TRIUMPH VNTURES16/04/2024
CC006000000500557M/S. TRIUMPH VENTURESMRS. SHALINI SUNIL UPADHYAY AND MR. SUNIL KUMAR UPADHYAY25/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2024

Documents filed233

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 233 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Sidd Mar 25.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 C A CERTIFICATE _Siddhivinayak.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer's Certificate Siddhivinayak_0001.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A- Annesxure c Siddhivinayak.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Siddhivinayak Dec 24.pdf18 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Siddhivinayak Dec 24 n.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE Siddhivinayak Dec 24.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Siddhivinayk Inventory Dec 24.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siddhivinayak FORM 5 MAARCH 24_0001.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: siddhi inv_0001.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sept 24 Siddhi.pdf18 Oct 2024
Certificates of CA (Form 3)File: C A Certificate Form 3 Sept 24 Siddhi nn.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Sept 2024 Siddhi Form 2.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Qualty Certificate March 24 Siddhi.pdf17 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 24 Siddhi.pdf17 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE June 24 Siddhi.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory june 24 Siddhivinayak.pdf16 Jul 2024
Certificates of CA (Form 3)File: C A Certificate Form 3 june 24 Siddhi nn.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 24 Siddhi nn.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE March 24 Siddhi NN.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Qualty Certificate March 24 Siddhi.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory March 24 Siddhivinayak nn.pdf20 Apr 2024
Certificates of CA (Form 3)File: C A Certificate Form 3 March 24 Siddhi NN.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dt 15-3-2024.PDF19 Apr 2024
Disclosure of sold/ booked inventoryFile: Siddhivinayk Inventory Dec 23 nn.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Siddhi Dec 23_compressed.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Siddhi Dec 23.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3 Siddhi Dec 23_compressed.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Siddhivinayak Rera Certificate Form No 5 March 23 n.pdf30 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Siddhivinayak Full OC Cetificate dt 29-12-2023.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2023 Siddhi ok.pdf18 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Sept 23 Siddhi ok.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Siddhivinayak Inventory 30-9-2023 ok.pdf17 Oct 2023
Certificates of CA (Form 3)File: C A Certificate Form 3 Sept 23 Siddhi ok.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Siddhivinayak Quality Form 2A.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Siddhivinayak Sold Flat June 23 N.pdf21 Jul 2023
Certificates of CA (Form 3)File: Siddhivinayak C A Certificate Form 3 June 2023_compressed.pdf21 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023 Siddhi N.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE June 23 Siddhi N.pdf17 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Siddhivinayak Rera Form 4.pdf28 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023 Siddhi n.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE March 23 Siddhi.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Siddhivinayak Quality Form 2A.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Siddhivinayak Sold Flat March 23 n.pdf20 Apr 2023
Certificates of CA (Form 3)File: C A Certificate Form 3 March 23 Siddhi n.pdf20 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8 N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9N.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Complition Certificate up to 18th Floor dt 31-1-23.pdf31 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2022 Siddhi n.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Siddhivinayak Quality Form 2A n.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: Siddhivinayak Inventory Dec22 n.pdf17 Jan 2023
Certificates of CA (Form 3)File: C A Certificate Form 3 Dec 22 Siddhi n.pdf17 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Dec 22 Siddhi n.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Certificate Form No 5 March 22 n.pdf20 Dec 2022
Building plan approvalFile: Siddhivinayak New IOD MHADA Letter Amended Plan extended 20th floor (2).pdf20 Oct 2022
Building plan approvalFile: 1.pdf20 Oct 2022
Building plan approvalFile: 2.pdf20 Oct 2022
Building plan approvalFile: 3.pdf20 Oct 2022
Building plan approvalFile: 4.pdf20 Oct 2022
Building plan approvalFile: 5.pdf20 Oct 2022
Building plan approvalFile: 6.pdf20 Oct 2022
Building plan approvalFile: 7.pdf20 Oct 2022
Building plan approvalFile: 8.pdf20 Oct 2022
Building plan approvalFile: 9.pdf20 Oct 2022
Building Plan Approval (IOD)File: Siddhivinayak New IOD MHADA Letter Amended Plan extended 20th floor (2).pdf20 Oct 2022
Building Plan Approval (IOD)File: 1.pdf20 Oct 2022
Building Plan Approval (IOD)File: 2.pdf20 Oct 2022
Building Plan Approval (IOD)File: 3.pdf20 Oct 2022
Building Plan Approval (IOD)File: 4.pdf20 Oct 2022
Building Plan Approval (IOD)File: 5.pdf20 Oct 2022
Building Plan Approval (IOD)File: 6.pdf20 Oct 2022
Building Plan Approval (IOD)File: 7.pdf20 Oct 2022
Building Plan Approval (IOD)File: 8.pdf20 Oct 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmSIDDHIVINAYAKCompleted 130Lapsed / revoked 77Other 184Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: Triumph Ventures

Triumph Ventures has 2 registrations on MahaRERA, including SIDDHIVINAYAK and OMKARESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK?

The registered promoter entity is Triumph Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHIVINAYAK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHIVINAYAK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK?

The professionals named in the filing: Architect: IRANI ARCHITECTS; Architect: ELLORA PROJECT CONSULTANTS; Engineer: JW CONSULTANTS LLP; Chartered Accountant: DJ SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.