SIDDHIVINAYAK
RG-MH-68400 · RERA P51800011066 · Last updated on MahaRERA portal: 19 Apr 2025
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
- 3 extensions taken
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHIVINAYAK is a Residential / Group Housing project by Triumph Ventures in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011066 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2021. 4 complaints are on record with the regulator.
At a glance
Project
- NameSIDDHIVINAYAK
- TypeResidential / Group Housing
- Location
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800011066
- ReraGenie IDRG-MH-68400
Builder
- NameTriumph Ventures
- Entity typePartnership
- PartnersRajiv Shah, Anant Shah
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Aug 2017
- Promised completion30 Jun 2021
- Revised completionNone
- Buildings3 building records
- Documents filed233 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 25 | 0 | 0 | 0 | 0 |
| WING B | NA | 25 | 0 | 0 | 0 | 0 |
| WING C | NA | 25 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 1 | 1 |
| WING B | 1 | 1 |
| WING C | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | IRANI ARCHITECTS |
| Architect | ELLORA PROJECT CONSULTANTS |
| Engineer | JW CONSULTANTS LLP |
| Chartered Accountant | DJ SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Triumph Ventures | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCONSTRUCTION UPDATE, EXPLANATORY NOTE FOR DELAY AND REASON FOR EXTENSION OF THE SIDDHIVINAYAK PROJECT • We are seeking RERA Extension of the project till 30th September 2023. • We have received Amended FULL IOD of the Project on 12th October 2022 and Full CC on 16th December 2022. • We have received the Environment Clearance from the SEIAA on the 7th of December,2022. • Our Previous Cc was till the Top of 19th Floor and Full Core Area upto the top of Water Tank of all 3 Wings. • We have Applied for Part OC Upto the Top of 18 Floors of All 3 Wings on the 25th September,2022. We received Part OC
Reason as filed by the promoter• We are seeking RERA Extension of the project till 31sr December 2023. • We have received Amended FULL IOD of the Project on 12th October 2022 and Full CC on 16th December 2022. • We have received the Environment Clearance from the SEIAA on the 7th of December,2022. • We have received PART OC Upto the Top of 18 Floors of All 3 Wings viz A, B & C on 31st January 2023. • We have already given possession to the flat owners till 18th Floor of all the 3 wings (A, B & C). Construction work of All 3 Wings A, B & C is totally complete. We have initiated the process of obtaining Full OC with MHADA. Co
Reason as filed by the promoterReasons for Delay in the Project have been listed below - 1. Uncertainties in approval norms between 2016 to 2018 due to which plans had to be repeatedly amended leading. 2. Lack of clarity and delay in allotment of Pro Rate (Layout) FSI from Mhada due to non approval of Mhada layout by MCGM. Only once Mhada became the planning body could the FSI be relased by Mhada. 3. Non-Renewal of the Societies Lease Agreement till date. More than 200 Societies have been affected due to delay from Mhada. 4. Delay in approval process due to Multiple Bugs in the New BMC Plan Approval Software. 5. Delay in ap
Litigation declared1
| Case | Court | Status |
|---|---|---|
| WPL/2449/2017/2017 | HIGH COURT | PENDING |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198639 | Sudha Motiram Mishra | M/s. Siddhivinayak Developers | 11/10/2021 |
| CC006000000375156 | GEETA PRAKASH MANE | M/S TRIUMPH VENTURES | 07/04/2023 |
| CC006000000480084 | SHALINI SUNIL UPADHYAY | M/S TRIUMPH VNTURES | 16/04/2024 |
| CC006000000500557 | M/S. TRIUMPH VENTURES | MRS. SHALINI SUNIL UPADHYAY AND MR. SUNIL KUMAR UPADHYAY | 25/05/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Apr 2024
Documents filed233
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 233 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Sidd Mar 25.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 C A CERTIFICATE _Siddhivinayak.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer's Certificate Siddhivinayak_0001.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A- Annesxure c Siddhivinayak.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Siddhivinayak Dec 24.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Siddhivinayak Dec 24 n.pdf | 18 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE Siddhivinayak Dec 24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayk Inventory Dec 24.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siddhivinayak FORM 5 MAARCH 24_0001.pdf | 10 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: siddhi inv_0001.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sept 24 Siddhi.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 Sept 24 Siddhi nn.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Sept 2024 Siddhi Form 2.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Qualty Certificate March 24 Siddhi.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 24 Siddhi.pdf | 17 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE June 24 Siddhi.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory june 24 Siddhivinayak.pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 june 24 Siddhi nn.pdf | 16 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 24 Siddhi nn.pdf | 20 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENGINEER'S CERTIFICATE March 24 Siddhi NN.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Qualty Certificate March 24 Siddhi.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory March 24 Siddhivinayak nn.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 March 24 Siddhi NN.pdf | 20 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dt 15-3-2024.PDF | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayk Inventory Dec 23 nn.pdf | 25 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Siddhi Dec 23_compressed.pdf | 19 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Siddhi Dec 23.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Siddhi Dec 23_compressed.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Siddhivinayak Rera Certificate Form No 5 March 23 n.pdf | 30 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Siddhivinayak Full OC Cetificate dt 29-12-2023.pdf | 29 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2023 Siddhi ok.pdf | 18 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Sept 23 Siddhi ok.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayak Inventory 30-9-2023 ok.pdf | 17 Oct 2023 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 Sept 23 Siddhi ok.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Siddhivinayak Quality Form 2A.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayak Sold Flat June 23 N.pdf | 21 Jul 2023 |
| Certificates of CA (Form 3)File: Siddhivinayak C A Certificate Form 3 June 2023_compressed.pdf | 21 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023 Siddhi N.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE June 23 Siddhi N.pdf | 17 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Siddhivinayak Rera Form 4.pdf | 28 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2023 Siddhi n.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE March 23 Siddhi.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Siddhivinayak Quality Form 2A.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayak Sold Flat March 23 n.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 March 23 Siddhi n.pdf | 20 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8 N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9N.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Complition Certificate up to 18th Floor dt 31-1-23.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2022 Siddhi n.pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Siddhivinayak Quality Form 2A n.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Siddhivinayak Inventory Dec22 n.pdf | 17 Jan 2023 |
| Certificates of CA (Form 3)File: C A Certificate Form 3 Dec 22 Siddhi n.pdf | 17 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Dec 22 Siddhi n.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Certificate Form No 5 March 22 n.pdf | 20 Dec 2022 |
| Building plan approvalFile: Siddhivinayak New IOD MHADA Letter Amended Plan extended 20th floor (2).pdf | 20 Oct 2022 |
| Building plan approvalFile: 1.pdf | 20 Oct 2022 |
| Building plan approvalFile: 2.pdf | 20 Oct 2022 |
| Building plan approvalFile: 3.pdf | 20 Oct 2022 |
| Building plan approvalFile: 4.pdf | 20 Oct 2022 |
| Building plan approvalFile: 5.pdf | 20 Oct 2022 |
| Building plan approvalFile: 6.pdf | 20 Oct 2022 |
| Building plan approvalFile: 7.pdf | 20 Oct 2022 |
| Building plan approvalFile: 8.pdf | 20 Oct 2022 |
| Building plan approvalFile: 9.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: Siddhivinayak New IOD MHADA Letter Amended Plan extended 20th floor (2).pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 1.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 2.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 3.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 4.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 5.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 6.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 7.pdf | 20 Oct 2022 |
| Building Plan Approval (IOD)File: 8.pdf | 20 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 233 filed documents as one ZIP, foldered, with a manifest
Keep SIDDHIVINAYAK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 391 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Triumph Ventures
Triumph Ventures has 2 registrations on MahaRERA, including SIDDHIVINAYAK and OMKARESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SIDDHIVINAYAK is delayed beyond 30 Jun 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHIVINAYAK?
The registered promoter entity is Triumph Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHIVINAYAK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIDDHIVINAYAK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIDDHIVINAYAK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHIVINAYAK?
The professionals named in the filing: Architect: IRANI ARCHITECTS; Architect: ELLORA PROJECT CONSULTANTS; Engineer: JW CONSULTANTS LLP; Chartered Accountant: DJ SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHIVINAYAK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback