Registration lapsed No litigation declared Residential / Group Housing project

SIDDHI SAMARPAN

By Neha Hemant Agrawal

RG-MH-24557 · RERA P51800008947 · Last updated on MahaRERA portal: 6 Jul 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 72 months past the filed date
  • 13 complaints at MahaRERA
  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2020Possession promised72 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
13Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

SIDDHI SAMARPAN is a Residential / Group Housing project by Neha Hemant Agrawal in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008947 on 19 Aug 2017. Possession was promised by 30 Oct 2020 and is now 72 months past that date. The completion date has moved by 22 months from the original filing. 13 complaints are on record with the regulator.

At a glance

Project

  • NameSIDDHI SAMARPAN
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008947
  • ReraGenie IDRG-MH-24557

Builder

  • NameNeha Hemant Agrawal
  • Entity typeIndividual

Key dates

72 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Oct 2020
  • Revised completionRevised to 30 Oct 2020 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Siddhi SamarpanNA460000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Siddhi Samarpan: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered29
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,510 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5067.83
Proposed, not sanctioned3,546 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 797 KASA MARIA BLDG VIJAY MANJREKAR PATH NR PORTUGIZ CHURCH DADAR WEST MUMBAI 400028

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Arch of Mrs Anuradha Salunke
EngineerSatish C Dhupalia
PartnerRole in project
Neha Hemant Agrawal-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001170Dec 2018 → Apr 2020

Reason as filed by the promoterA) Sir, our Revised amended CFO was cleared on 05/12/2017. (CFO No. FB/HRC/RIV/25 dated 05/12/2017). Sir we had to supply additional / alternate supply of power, as per CFO requirement for the fire equipment’s and fire lift. Reliance Infrastructure Ltd. has approved the same on 16/02/2018., with conditions as mentioned in their, BILL OF SUPPLY, ELECTRICITY SERVICES CHARGES, (5 different contracts), dated 16/02/2018. Hence we are awaiting supply of additional / alternate line by Adani Electricity Ltd., (formerly Reliance Infrastructure Ltd.) and then approvals / occupation certification. B) Sir

EXT51800005088Dec 2018 → Apr 2020

Reason as filed by the promoterB) Sir, as per our revised amended CFO, cleared on 05/12/2017.(CFO No.FB/HRC/RIV/25 dated 05/12/2017), I had to supply additional /alternate supply of power , as per CFO requirement for fire equipment’s and fire lift. Adani Electricity Ltd (formely Reliance Infrastructure Ltd) has approved the same on 16/02/2018. Sir, as, I have already paid the amount to Adani Electricity Ltd about 15 months ago but still we have not received any supply from them. Sir, I have also written and send and delivered letters to Adani Electricity from time to time, and send many reminders for the same. Sir, I am sti

Litigation declared3

CaseCourtStatus
Before Sole Arbitrator Ms Rajani Iyer/2015ArbitrationPending
Before The Arbitral Tribunal Justice S M Jhunjhunwala Presiding Arbitrator/2015ArbitrationPending
Arbitration Petition Filing no-383 of 2018/2018Mumbai High CourtPending

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC006000000001195SUCHITA UPADHYAYNEHA HEMANT AGRAWAL10/10/2017
CC006000000001957Amit GharatNeha Hemant Agrawal22/11/2017
CC006000000012682Mr. Anil Vade and OthersM/s Siddhitech Developers through its Proprietor Ms. Neha Hemant Agrawal19/01/2018
CC006000000054895Mrs. Chandan V. Gogri and Mr. Mitesh S. GalaM/s.Siddhitech Developers12/06/2018
CC006000000055009Sunil D. GogriM/s. Siddhitech Developers20/06/2018
CC006000000056398Ramesh Doshi and Rajni DoshiMrs. Neha Hemant Agarwal29/01/2019
CC006000000057108Jeetendra V. TannaNeha Hemant Agrawal30/11/2018
CC006000000057473MRS. USHA ASHOK MORBIAMrs. Neha Hemant Agarwal29/12/2018
CC006000000057657PRAFUL MAKWANANEHA AGRAWAL07/02/2019
CC006000000089775JAYKISHAN LODHAMR HEMANT AGRAWAL20/06/2019
CC006000000171542Prasenjit Navkumar Maityneha hemant agarwal18/11/2019
CC006000000209599JITENDRA NATWARLAL SHAHNeha Agarwal/ SiddhiTech Developers25/01/2022
CC006000000429344Amit Arun GharatNeha Hemant Agrawal20/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jul 2021

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: THIRD PARTY QUALITY AUDITOR KAHAAN COMPLETION CERTIFICATE.pdf6 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RCC completion certificate satish dhupelia.pdf6 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate BY SITE SUPERVISOR Kamlesh Gurav.pdf6 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PROJECT MANAGEMENT CONSULTANT KAHAAN COMPLETION CERTIFICATE.pdf6 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: STY REGISTRATION CERTIFICATE.pdf6 Jul 2021
Certificates of CA (Form 3)File: form 3 31-12-2018.pdf14 Dec 2019
Details of encumbrancesFile: letter of encumbrance051219.pdf5 Dec 2019
OtherFile: kahan project letter.pdf5 Dec 2019
OtherFile: kamlesh gurav letter.pdf5 Dec 2019
OtherFile: Car Lift 1.pdf4 Nov 2019
OtherFile: Lift No 2 Certificate.pdf4 Nov 2019
OtherFile: Lift no 120191104.pdf4 Nov 2019
OtherFile: rcc completion satish dhupalia.pdf9 Oct 2019
OtherFile: order29062018.pdf4 Feb 2019
OtherFile: order30082018.pdf4 Feb 2019
OtherFile: Order25102018.pdf4 Feb 2019
Certificates of CA (Form 5)File: FORM 5.pdf21 Jan 2019
OtherFile: Siddhisamarpan registration certificate.pdf30 Apr 2018
Details of encumbrancesFile: details of ecubarance.pdf19 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: letter reg society formation.pdf19 Apr 2018
OtherFile: fire noc.pdf19 Apr 2018
OtherFile: Scan-0002 (1).pdf19 Apr 2018
OtherFile: Scan-0001 (2).pdf19 Apr 2018
OtherFile: scan 003.pdf19 Apr 2018
Proforma of Allotment letterFile: RERA SIDDHISAMARPAN AGREEMENT FOR SALE.pdf4 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shri arch.pdf13 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SIDDHI SAMARPAN.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate_Siddhi Samarpan.pdf28 Jul 2017
Building plan approvalFile: SD IOD.pdf27 Jul 2017
Layout approvalFile: Plan.pdf27 Jul 2017
PAN CardFile: PAN - Neha Agrawal.pdf27 Jul 2017
Copy of the legal title reportFile: SD title certificate.pdf27 Jul 2017
Details of encumbrancesFile: details of encumbrance.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: SD IOD.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Jul 2017
Declaration in FORM BFile: Form B.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Jul 2017
Proforma of Allotment letterFile: letter of allotment.pdf27 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 22 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHI SAMARPAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmSIDDHI SAMARPANCompleted 15Lapsed / revoked 16Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: Neha Hemant Agrawal

Neha Hemant Agrawal has 1 registration on MahaRERA, including SIDDHI SAMARPAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SIDDHI SAMARPAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SIDDHI SAMARPAN is delayed beyond 30 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHI SAMARPAN?

The registered promoter entity is Neha Hemant Agrawal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHI SAMARPAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHI SAMARPAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHI SAMARPAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHI SAMARPAN?

The professionals named in the filing: Architect: Shri Arch of Mrs Anuradha Salunke; Engineer: Satish C Dhupalia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHI SAMARPAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHI SAMARPAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHI SAMARPAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.