Registration lapsed No litigation declared Residential / Group Housing project

SIDDHARTH VIKAS SRA CHS LTD

By M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS

RG-MH-80240 · RERA P51800012508 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • 5 complaints at MahaRERA
  • Completion date moved by 45 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
1 of 11Construction stages donefurthest along: Internal walls, 90%
17 of 43Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

SIDDHARTH VIKAS SRA CHS LTD is a Residential / Group Housing project by M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012508 on 1 Sep 2017. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 45 months from the original filing. 26 of the 43 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameSIDDHARTH VIKAS SRA CHS LTD
  • TypeResidential / Group Housing
  • Location
    • Plot Nos. 2834-2851
    • 2853
    • 2855-2857
    • 3387-3391
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012508
  • ReraGenie IDRG-MH-80240

Builder

  • NameM/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersBRIAN FRANCIS MIRANDA, RAJESH POPAT PAWAR

Key dates

19 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed51 files

Current status

60%26 of 43 units booked

Figures as on 4 Oct 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHARTH VIKAS CHS LTDNA9743043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SIDDHARTH VIKAS CHS LTD: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor1%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,312 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI3138.66
Proposed, not sanctioned3,139 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVAKOLA SANTACRUZ EAST MUMBAI 400055

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAJENDRA DOLARE
EngineerMUTHUKRISHNAN
EngineerEPICONS Consultants Pvt Ltd
Chartered AccountantG. C. PATEL AND CO.
Chartered AccountantNeeta Chaudhry & Co.
PartnerRole in project
M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009626Jun 2021 → May 2022

Reason as filed by the promoterWork delayed due to Stop work notice issued on 24 April 2019 by the competent authority, the copy of which is enclosed in S.No.:2 other. Also delayed by Covid 19 First and 2nd Wave Lock down till date

EXT51800013054Jun 2021 → Mar 2025

Reason as filed by the promoterThe proposal is submitted as per D.C. Regulations 1991 and now developer want to take benefit of fungible and want to take benefit of DCPR 2034.

Litigation declared1

CaseCourtStatus
CC/11/191,192,199,200,201/2014CONSUMER COURTADJORNED FOR HIRING

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000055367TUKARAM MESTRYCosmos Enterprises13/07/2018
CC006000000100197prashant dalviM/S Cosmos Enterprises and M/s B.R.Builder and Developers18/07/2019
CC006000000195216Prashant DalviRajesh Pawar12/12/2020
CC006000000209858Shaila JadhavM/s. Cosmos Enterprises and M/s. B.R Builders and Developers04/02/2022
CC12601222Suchita Tukaram MestryM/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS06/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B (1)_Compressed.pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023.pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022.pdf4 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf4 Oct 2023
Declaration in FORM BFile: New Form B.pdf18 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera Form 2A for Siddharth Vikas SRA CHS Ltd (2).PDF18 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Form 2A for Siddharth Vikas SRA CHS Ltd 2020-21.PDF10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rera Form 2A for Siddharth Vikas SRA CHS Ltd 2021-22.PDF10 Aug 2023
Declaration in FORM BFile: Form B.pdf24 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rera Form 2A for Siddharth Vikas SRA CHS Ltd.PDF24 Jul 2023
Declaration in FORM BFile: form 'B'_compressed.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: cosmos sold unsold xls.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - B R BUILDERS -2022-23.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: BRD-form5-17-18.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: BRD-form5-18-19 (1).pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BRD-form5-20-21 (1).pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BRD-form5-19-20 (1).pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: BRD-form5-20-21 (1).pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BRD-firm5-21-22 (1).pdf8 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Epicon RERA certificate.pdf20 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate11.pdf9 Dec 2022
OtherFile: COMPLANIT CASE.pdf20 Feb 2020
Building plan approvalFile: IOD 2.pdf31 Jul 2017
Building plan approvalFile: IOD 1.pdf31 Jul 2017
Layout approvalFile: Building plan Approval 1.pdf31 Jul 2017
Layout approvalFile: Building plan Approval 2.pdf31 Jul 2017
PAN CardFile: PAN CARD.pdf31 Jul 2017
Copy of the legal title reportFile: Title Report.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 1.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 2.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 3.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 4.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 5.pdf31 Jul 2017
Details of encumbrancesFile: PROPERTY CARD 6.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Building plan Approval 1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Building plan Approval 2.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD 1.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD 2.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf31 Jul 2017
Declaration in FORM BFile: Form B Affidavit.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 2.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Ceretificate 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer'sCertificate 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement 1.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement 2.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement 3.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement 4.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement 5.pdf31 Jul 2017

How this compares with Mumbai Suburban

60%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 45 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHARTH VIKAS SRA CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmSIDDHARTH VIKAS SRA CHS Completed 130Lapsed / revoked 73Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 341 registered projects within 2 km.

Builder: M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS

M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SIDDHARTH VIKAS SRA CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SIDDHARTH VIKAS SRA CHS LTD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SIDDHARTH VIKAS SRA CHS LTD is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHARTH VIKAS SRA CHS LTD?

The registered promoter entity is M/S.COSMOS ENTERPRISES AND M/S. B.R. BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHARTH VIKAS SRA CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHARTH VIKAS SRA CHS LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHARTH VIKAS SRA CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHARTH VIKAS SRA CHS LTD?

The professionals named in the filing: Architect: GAJENDRA DOLARE; Engineer: MUTHUKRISHNAN; Engineer: EPICONS Consultants Pvt Ltd; Chartered Accountant: G. C. PATEL AND CO.; Chartered Accountant: Neeta Chaudhry & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHARTH VIKAS SRA CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHARTH VIKAS SRA CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHARTH VIKAS SRA CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.