Completed No litigation declared Residential / Group Housing project

SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL

By DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED

RG-MH-21754 · RERA P51800023386 · Last updated on MahaRERA portal: 12 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL is a Residential / Group Housing project by DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023386 on 12 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2026.

At a glance

Project

  • NameSIDDHARTH NAGAR SWAMI VIVEKANAND CHSL
  • TypeResidential / Group Housing
  • Location
    • BUILDING NO 10 VIVEK COLLEGE ROAD OFF SV ROAD
    • SIDDHARTH NAGAR 4 PAHADI GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800023386
  • ReraGenie IDRG-MH-21754

Builder

  • NameDHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsPREETI SANJEEV MALHOTRA, SANJEEV MOTILAL MALHOTRA
  • DirectorSANJEEV MOTILAL MALHOTRA
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHARTH NAGAR SWAMI VIVEKANAND CHSLNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area649 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4539.53
Proposed, not sanctioned3,381 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHARKOP BRANCH CHARKOP KANDIVALI WEST MUMBAI - 400067

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITHVI ARCH
EngineerJ RATHOD & ASSOCIATES
EngineerCSE CONSULTANTS
Chartered AccountantABHAY H SHAH & CO
PartnerRole in project
DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jul 2023

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation.pdf12 Oct 2023
Status of ConveyanceFile: conveyance deed.pdf12 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Architech Certificate.pdf11 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: occupation certificate - Swami (1).pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q2 22-23.pdf31 Oct 2022
Disclosure of sold/ booked inventoryFile: sold and unsold flat list-Swami Vivekannad.pdf1 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Fy 2020-21.pdf1 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q4 21-22.pdf19 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1 22-23.pdf19 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Q3 FY 21-22_compressed.pdf19 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Q4 FY 21-22_compressed.pdf19 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q3 21-22-compressed.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q1 fy 2021-22_compressed.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q2 fy 2021-22_compressed.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q3 fy 2021-22_compressed.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 21-22.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 21-22.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf6 Apr 2022
Layout approvalFile: 1-compressed.pdf12 Mar 2022
Layout approvalFile: 6-compressed.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 1-compressed.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 6-compressed.pdf12 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a Q4 fy 2019-20.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 20-21.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 20-21.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q3 20-21.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q4 20-21.pdf13 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC upto 23rd-compressed.pdf29 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1 21-22.pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 - Q4 Fy 20-21_compressed.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 1 arch q4 20-21 rera cert-compressed.pdf29 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 arch q4 20-21 rera cert-compressed.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q2 21-22.pdf30 Sep 2021
Declaration about Commencement CertificateFile: CC upto 23rd-compressed.pdf18 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 arch q3 20-21 RERA 3 compress.pdf3 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 egg signed.pdf3 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q3 20-21.pdf3 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 RERA FY 20-21 Swami Vivekananda_compressed.pdf3 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf3 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1_compressed.pdf27 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA AECH Q2 20-21.pdf27 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 20-21 sign.pdf27 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 20-21 signed.pdf27 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 20-21.pdf27 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 20-21.pdf27 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q1 FY 20-21_compressed.pdf27 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q2 certificate_compressed.pdf27 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a.pdf12 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch 2019 q4.pdf26 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EnggCertq31920signed.pdf26 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 19-20 signed.pdf26 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized q4 form 3 compressed.pdf26 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera FORM 1 OCT - DEC 04012020.pdf29 May 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2ajan20.pdf29 May 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - QUARTER 3_compressed.pdf29 May 2020
Layout approvalFile: SIDDHARTHA NAGAR LAYOUT 123-1.pdf9 Dec 2019
Layout approvalFile: SIDDHARTHA NAGAR LAYOUT 123-2-1.pdf9 Dec 2019
Building plan approvalFile: iod copy compressed-1-7.pdf9 Dec 2019
Building plan approvalFile: iod copy compressed-8-11-1.pdf9 Dec 2019
Building plan approvalFile: iod copy compressed-8-11-2.pdf9 Dec 2019
Building plan approvalFile: iod copy compressed-8-11-3.pdf9 Dec 2019
Building plan approvalFile: iod copy compressed-8-11-4.pdf9 Dec 2019
PAN CardFile: DEVELOPERS PAN CARD.pdf9 Dec 2019
Copy of the legal title reportFile: swami vivekanand Title certificate (2).pdf9 Dec 2019
Details of encumbrancesFile: swami vivekanand No encrumbences certificate.pdf9 Dec 2019
Copy of Layout Approval (in case of layout)File: SIDDHARTHA NAGAR LAYOUT 123-1.pdf9 Dec 2019
Copy of Layout Approval (in case of layout)File: SIDDHARTHA NAGAR LAYOUT 123-2-1.pdf9 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-1-7.pdf9 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-1.pdf9 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-2.pdf9 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-3.pdf9 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-4.pdf9 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: SWAMI VIVEKANAND CHSL CC COPY.pdf9 Dec 2019
Declaration in FORM BFile: form b scanned_rotated_compressed.pdf9 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera certificate (1).pdf9 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf9 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT ORIGINAL.pdf9 Dec 2019
Proforma of Allotment letterFile: Swami vivekanand Final Sale Agreement 2018 (2).pdf9 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
OM SAI CHSLCTS NO 445 445-1 TO 20 VILLAGE PAHADI GOREGAON EAST MUMBAI 40006360CompletedFeb 2017Feb 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SIDDHARTH NAGAR 4 PAHADI GOREGAON WEST6,700+ in Mumbai Suburban

2 kmSIDDHARTH NAGAR SWAMI VICompleted 134Lapsed / revoked 71Abeyance 1Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED

DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED has 3 registrations on MahaRERA, including SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL and MAGATHANE PRESS ENCLAVE CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?

The registered promoter entity is DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?

The professionals named in the filing: Architect: PRITHVI ARCH; Engineer: J RATHOD & ASSOCIATES; Engineer: CSE CONSULTANTS; Chartered Accountant: ABHAY H SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.