Home / Browse projects / Mumbai Suburban, Maharashtra / SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL
SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL
By DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED
RG-MH-21754 · RERA P51800023386 · Last updated on MahaRERA portal: 12 Oct 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL is a Residential / Group Housing project by DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023386 on 12 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2026.
At a glance
Project
- NameSIDDHARTH NAGAR SWAMI VIVEKANAND CHSL
- TypeResidential / Group Housing
- Location
- BUILDING NO 10 VIVEK COLLEGE ROAD OFF SV ROAD
- SIDDHARTH NAGAR 4 PAHADI GOREGAON WEST
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800023386
- ReraGenie IDRG-MH-21754
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Dec 2019
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRITHVI ARCH |
| Engineer | J RATHOD & ASSOCIATES |
| Engineer | CSE CONSULTANTS |
| Chartered Accountant | ABHAY H SHAH & CO |
| Partner | Role in project |
|---|---|
| DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Dec 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Jul 2023
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation.pdf | 12 Oct 2023 |
| Status of ConveyanceFile: conveyance deed.pdf | 12 Oct 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architech Certificate.pdf | 11 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: occupation certificate - Swami (1).pdf | 12 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q2 22-23.pdf | 31 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: sold and unsold flat list-Swami Vivekannad.pdf | 1 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Fy 2020-21.pdf | 1 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q4 21-22.pdf | 19 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1 22-23.pdf | 19 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Q3 FY 21-22_compressed.pdf | 19 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Q4 FY 21-22_compressed.pdf | 19 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q3 21-22-compressed.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q1 fy 2021-22_compressed.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q2 fy 2021-22_compressed.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - q3 fy 2021-22_compressed.pdf | 6 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 21-22.pdf | 6 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 21-22.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf | 6 Apr 2022 |
| Layout approvalFile: 1-compressed.pdf | 12 Mar 2022 |
| Layout approvalFile: 6-compressed.pdf | 12 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: 1-compressed.pdf | 12 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: 6-compressed.pdf | 12 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a Q4 fy 2019-20.pdf | 13 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 20-21.pdf | 13 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 20-21.pdf | 13 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q3 20-21.pdf | 13 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q4 20-21.pdf | 13 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC upto 23rd-compressed.pdf | 29 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1 21-22.pdf | 29 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 - Q4 Fy 20-21_compressed.pdf | 29 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 1 arch q4 20-21 rera cert-compressed.pdf | 29 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 arch q4 20-21 rera cert-compressed.pdf | 30 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q2 21-22.pdf | 30 Sep 2021 |
| Declaration about Commencement CertificateFile: CC upto 23rd-compressed.pdf | 18 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 arch q3 20-21 RERA 3 compress.pdf | 3 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 egg signed.pdf | 3 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q3 20-21.pdf | 3 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 RERA FY 20-21 Swami Vivekananda_compressed.pdf | 3 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf | 3 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch q1_compressed.pdf | 27 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA AECH Q2 20-21.pdf | 27 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 20-21 sign.pdf | 27 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 20-21 signed.pdf | 27 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q1 20-21.pdf | 27 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a q2 20-21.pdf | 27 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q1 FY 20-21_compressed.pdf | 27 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q2 certificate_compressed.pdf | 27 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a.pdf | 12 Nov 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera arch 2019 q4.pdf | 26 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EnggCertq31920signed.pdf | 26 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 19-20 signed.pdf | 26 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized q4 form 3 compressed.pdf | 26 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera FORM 1 OCT - DEC 04012020.pdf | 29 May 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2ajan20.pdf | 29 May 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - QUARTER 3_compressed.pdf | 29 May 2020 |
| Layout approvalFile: SIDDHARTHA NAGAR LAYOUT 123-1.pdf | 9 Dec 2019 |
| Layout approvalFile: SIDDHARTHA NAGAR LAYOUT 123-2-1.pdf | 9 Dec 2019 |
| Building plan approvalFile: iod copy compressed-1-7.pdf | 9 Dec 2019 |
| Building plan approvalFile: iod copy compressed-8-11-1.pdf | 9 Dec 2019 |
| Building plan approvalFile: iod copy compressed-8-11-2.pdf | 9 Dec 2019 |
| Building plan approvalFile: iod copy compressed-8-11-3.pdf | 9 Dec 2019 |
| Building plan approvalFile: iod copy compressed-8-11-4.pdf | 9 Dec 2019 |
| PAN CardFile: DEVELOPERS PAN CARD.pdf | 9 Dec 2019 |
| Copy of the legal title reportFile: swami vivekanand Title certificate (2).pdf | 9 Dec 2019 |
| Details of encumbrancesFile: swami vivekanand No encrumbences certificate.pdf | 9 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: SIDDHARTHA NAGAR LAYOUT 123-1.pdf | 9 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: SIDDHARTHA NAGAR LAYOUT 123-2-1.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-1-7.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-1.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-2.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-3.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: iod copy compressed-8-11-4.pdf | 9 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: SWAMI VIVEKANAND CHSL CC COPY.pdf | 9 Dec 2019 |
| Declaration in FORM BFile: form b scanned_rotated_compressed.pdf | 9 Dec 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera certificate (1).pdf | 9 Dec 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf | 9 Dec 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT ORIGINAL.pdf | 9 Dec 2019 |
| Proforma of Allotment letterFile: Swami vivekanand Final Sale Agreement 2018 (2).pdf | 9 Dec 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| OM SAI CHSL | CTS NO 445 445-1 TO 20 VILLAGE PAHADI GOREGAON EAST MUMBAI 400063 | 60 | Completed | Feb 2017 | Feb 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SIDDHARTH NAGAR 4 PAHADI GOREGAON WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 350 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED
DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED has 3 registrations on MahaRERA, including SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL and MAGATHANE PRESS ENCLAVE CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?
The registered promoter entity is DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?
The professionals named in the filing: Architect: PRITHVI ARCH; Engineer: J RATHOD & ASSOCIATES; Engineer: CSE CONSULTANTS; Chartered Accountant: ABHAY H SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback