Home / Browse projects / Mumbai Suburban, Maharashtra / SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD

Registered No litigation declared Residential / Group Housing project

SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD

By INFINITY CONSTRUCTIONS

RG-MH-89297 · RERA P51800049630 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 95%
21 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD is a Residential / Group Housing project by INFINITY CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049630 on 22 Feb 2023. Possession is promised by 31 Dec 2027. 47 of the 68 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD
  • TypeResidential / Group Housing
  • Location
    • VIVEK VIDYALAY SCHOOL ROAD
    • SIDDHARTH NAGAR GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049630
  • ReraGenie IDRG-MH-89297

Builder

  • NameINFINITY CONSTRUCTIONS
  • Entity typePartnership
  • PartnersIRSHAD HANIF MULLA, AYAN IRSHAD MULLA
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

69%47 of 68 units booked
55.0%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTDNA232267168

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,256 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI4256.0
Proposed, not sanctioned4,256 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDIVYAJYOT CHSL, SHOP NO 2, BESIDE MARUTI ARENA SHOWROOM, S V ROAD, SIDDHARTH NAGAR, GOREGAON WEST, M
Estimated costRs 25.53 cr
Cost incurredRs 14.05 cr
Work done55.05%
BuildingWingEstimatedIncurred
SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTDNARs 25.53 crRs 14.05 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPATEL & PATELARCHITECTS Vikas Patel
EngineerZARNA ASSOCIATES
EngineerHafiz Shaikh
Chartered AccountantBHAVESH C VITHLANI
Chartered AccountantSUFIYAN VANCHESA
Chartered AccountantPraful Suhas Sawant
PartnerRole in project
INFINITY CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: siddhivinayak form 1 31032026.pdf1 Jul 2026
Withdrawal Update Form 2File: FORM 2 SIDDHIVINAYAK .pdf1 Jul 2026
Withdrawal Update Form 3File: siddivinayak form 3.pdf1 Jul 2026
Withdrawal Update Form 1File: siddhivinayak form 1.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1 311225.pdf21 May 2026
Withdrawal Update Form 2File: SIDDHIVINAYAK FORM 2 30092025.pdf21 May 2026
Withdrawal Update Form 2File: SIDDHIVINAYAK FORM 2 30092025.pdf21 May 2026
Withdrawal Update Form 3File: SIDDHIVINAYAK FORM 3 AS ON 30092025.pdf21 May 2026
Withdrawal Update Form 3File: SIDDHIVINAYAK FORM 3 31122025.pdf21 May 2026
Form 5 (FY 2023-2024)File: FORM 5 Siddhivinayak FY 2023-2024.pdf20 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Siddhivinayak.pdf17 Mar 2026
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 3File: FORM 3 SIDDHIVINAYAK AS ON 30092024 Signed.pdf12 Jun 2025
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Form 3File: FORM 3 SIDDHIVINAYAK.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 3File: Form 3.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHIVINAYAK.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DOS_Q3 of FY 24-25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHIVINAYAK AS ON 30092024 Signed.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIDDHIVINAYAK AS ON 30092024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Siddhivinayak.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Siddhivinayak_04_23-24-Q1_24-25_P1-P2.pdf6 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: SIDDHIVINAYK- REVALIDATION CERTIFICATE.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Q3 Siddhivinayak_Sold Unsold Disclosure_ as on Dec 2023_23012024.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Siddhivinayak Up To 20th Upper Floor.pdf22 Jan 2024
Declaration about Commencement CertificateFile: CC Declaration Siddhivinayak.pdf22 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Siddhivinayak For Q3 Certificate No 03.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate_SIDDHIVINAYAK_Q2_15102023_P1-P3.pdf25 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory SIDDHIVINAYAK_Q2_15102023_24112023_P1-P3.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final_Siddhivinayak as on 15102023.pdf25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Siddhivinayak FY 22-23.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Architects Certificates.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Book Inventry Siddhivinayak.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Book Inventry Siddhivinayak.pdf2 Sep 2023
Declaration about Commencement CertificateFile: Decleration Of CC Siddhivinayak.pdf16 Feb 2023
Other - TechnicalFile: Letter for RERA.pdf9 Feb 2023
Building plan approvalFile: IOD_SDH_02_11zon.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_03_11zon.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_05_14_11zon.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_06_15_11zon.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_07_16_11zon.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_08_compressed.pdf28 Jan 2023
Building plan approvalFile: IOD_SDH_09_compressed.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_02_11zon.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_03_11zon.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_05_14_11zon.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_06_15_11zon.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_07_16_11zon.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_08_compressed.pdf28 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_09_compressed.pdf28 Jan 2023
Layout approvalFile: A_Covering Letter Of IOD.pdf7 Jan 2023
Copy of Layout Approval (in case of layout)File: A_Covering Letter Of IOD.pdf7 Jan 2023
Proforma of Agreement for saleFile: Agreement for sale Siddhivinayak.pdf7 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration Annexure - A.pdf6 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf6 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report on Allotment Letter.pdf21 Dec 2022
Copy of the legal title reportFile: TITLE CERTIFICATE OF SIDDHIVINAYAK_compressed.pdf14 Dec 2022
CERSAI detailsFile: DECLARATION.pdf14 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Siddhivinayak CHS LTD .pdf14 Dec 2022
Proforma of Allotment letterFile: Allotment Letter Of Siddhivinayak On Letter Head.pdf14 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for Sale.pdf14 Dec 2022
Building plan approvalFile: IOD_SDH_01_11zon.pdf29 Nov 2022
PAN CardFile: 1_INFINITY PAN CARD.pdf29 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Of Siddhivinayak13102022.pdf29 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Of Siddhivinayak13102022.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_01_11zon.pdf29 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Siddhivinayak_CC.pdf29 Nov 2022
Declaration in FORM BFile: Form B Declaration Affidavit Of Siddhivinayak.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate_16092022.pdf29 Nov 2022

How this compares with Mumbai Suburban

69%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SIDDHARTH NAGAR GOREGAON WEST6,700+ in Mumbai Suburban

2 kmSIDDHARTH NAGAR SIDDHIVICompleted 137Lapsed / revoked 71Abeyance 1Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 354 registered projects within 2 km.

Builder: INFINITY CONSTRUCTIONS

INFINITY CONSTRUCTIONS has 2 registrations on MahaRERA, including SIDDHARTH NAGAR PARADISE CHS LTD and SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?

The registered promoter entity is INFINITY CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?

The professionals named in the filing: Architect: PATEL & PATELARCHITECTS Vikas Patel; Engineer: ZARNA ASSOCIATES; Engineer: Hafiz Shaikh; Chartered Accountant: BHAVESH C VITHLANI; Chartered Accountant: SUFIYAN VANCHESA; Chartered Accountant: Praful Suhas Sawant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.