Home / Browse projects / Mumbai Suburban, Maharashtra / SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD
SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD
RG-MH-89297 · RERA P51800049630 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD is a Residential / Group Housing project by INFINITY CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049630 on 22 Feb 2023. Possession is promised by 31 Dec 2027. 47 of the 68 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD
- TypeResidential / Group Housing
- Location
- VIVEK VIDYALAY SCHOOL ROAD
- SIDDHARTH NAGAR GOREGAON WEST
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800049630
- ReraGenie IDRG-MH-89297
Builder
- NameINFINITY CONSTRUCTIONS
- Entity typePartnership
- PartnersIRSHAD HANIF MULLA, AYAN IRSHAD MULLA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD | NA | 23 | 22 | 67 | 1 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | - |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD | NA | Rs 25.53 cr | Rs 14.05 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PATEL & PATELARCHITECTS Vikas Patel |
| Engineer | ZARNA ASSOCIATES |
| Engineer | Hafiz Shaikh |
| Chartered Accountant | BHAVESH C VITHLANI |
| Chartered Accountant | SUFIYAN VANCHESA |
| Chartered Accountant | Praful Suhas Sawant |
| Partner | Role in project |
|---|---|
| INFINITY CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: siddhivinayak form 1 31032026.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 SIDDHIVINAYAK .pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: siddivinayak form 3.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: siddhivinayak form 1.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: FORM 1 311225.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: SIDDHIVINAYAK FORM 2 30092025.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: SIDDHIVINAYAK FORM 2 30092025.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: SIDDHIVINAYAK FORM 3 AS ON 30092025.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: SIDDHIVINAYAK FORM 3 31122025.pdf | 21 May 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 Siddhivinayak FY 2023-2024.pdf | 20 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Siddhivinayak.pdf | 17 Mar 2026 |
| Form 1File: Form 1.pdf | 12 Jun 2025 |
| Form 2File: Form 2.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOS.pdf | 12 Jun 2025 |
| Form 3File: FORM 3 SIDDHIVINAYAK AS ON 30092024 Signed.pdf | 12 Jun 2025 |
| Form 1File: Form 1.pdf | 12 Jun 2025 |
| Form 2File: Form 2.pdf | 12 Jun 2025 |
| Form 3File: FORM 3 SIDDHIVINAYAK.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOS.pdf | 12 Jun 2025 |
| Form 1File: Form 1.pdf | 12 Jun 2025 |
| Form 2File: Form 2.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOS.pdf | 12 Jun 2025 |
| Form 3File: Form 3.pdf | 12 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHIVINAYAK.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DOS_Q3 of FY 24-25.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIDDHIVINAYAK AS ON 30092024 Signed.pdf | 24 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIDDHIVINAYAK AS ON 30092024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Siddhivinayak.pdf | 7 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Siddhivinayak_04_23-24-Q1_24-25_P1-P2.pdf | 6 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: SIDDHIVINAYK- REVALIDATION CERTIFICATE.pdf | 5 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf | 3 May 2024 |
| Disclosure of sold/ booked inventoryFile: Q3 Siddhivinayak_Sold Unsold Disclosure_ as on Dec 2023_23012024.pdf | 25 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Siddhivinayak Up To 20th Upper Floor.pdf | 22 Jan 2024 |
| Declaration about Commencement CertificateFile: CC Declaration Siddhivinayak.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Siddhivinayak For Q3 Certificate No 03.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate_SIDDHIVINAYAK_Q2_15102023_P1-P3.pdf | 25 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory SIDDHIVINAYAK_Q2_15102023_24112023_P1-P3.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final_Siddhivinayak as on 15102023.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Siddhivinayak FY 22-23.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Architects Certificates.pdf | 5 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate.pdf | 5 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Book Inventry Siddhivinayak.pdf | 5 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Book Inventry Siddhivinayak.pdf | 2 Sep 2023 |
| Declaration about Commencement CertificateFile: Decleration Of CC Siddhivinayak.pdf | 16 Feb 2023 |
| Other - TechnicalFile: Letter for RERA.pdf | 9 Feb 2023 |
| Building plan approvalFile: IOD_SDH_02_11zon.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_03_11zon.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_05_14_11zon.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_06_15_11zon.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_07_16_11zon.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_08_compressed.pdf | 28 Jan 2023 |
| Building plan approvalFile: IOD_SDH_09_compressed.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_02_11zon.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_03_11zon.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_05_14_11zon.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_06_15_11zon.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_07_16_11zon.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_08_compressed.pdf | 28 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_09_compressed.pdf | 28 Jan 2023 |
| Layout approvalFile: A_Covering Letter Of IOD.pdf | 7 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: A_Covering Letter Of IOD.pdf | 7 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement for sale Siddhivinayak.pdf | 7 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration Annexure - A.pdf | 6 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf | 6 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report on Allotment Letter.pdf | 21 Dec 2022 |
| Copy of the legal title reportFile: TITLE CERTIFICATE OF SIDDHIVINAYAK_compressed.pdf | 14 Dec 2022 |
| CERSAI detailsFile: DECLARATION.pdf | 14 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Siddhivinayak CHS LTD .pdf | 14 Dec 2022 |
| Proforma of Allotment letterFile: Allotment Letter Of Siddhivinayak On Letter Head.pdf | 14 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for Sale.pdf | 14 Dec 2022 |
| Building plan approvalFile: IOD_SDH_01_11zon.pdf | 29 Nov 2022 |
| PAN CardFile: 1_INFINITY PAN CARD.pdf | 29 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Of Siddhivinayak13102022.pdf | 29 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate Of Siddhivinayak13102022.pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD_SDH_01_11zon.pdf | 29 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Siddhivinayak_CC.pdf | 29 Nov 2022 |
| Declaration in FORM BFile: Form B Declaration Affidavit Of Siddhivinayak.pdf | 29 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate_16092022.pdf | 29 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SIDDHARTH NAGAR GOREGAON WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 354 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: INFINITY CONSTRUCTIONS
INFINITY CONSTRUCTIONS has 2 registrations on MahaRERA, including SIDDHARTH NAGAR PARADISE CHS LTD and SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?
The registered promoter entity is INFINITY CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?
The professionals named in the filing: Architect: PATEL & PATELARCHITECTS Vikas Patel; Engineer: ZARNA ASSOCIATES; Engineer: Hafiz Shaikh; Chartered Accountant: BHAVESH C VITHLANI; Chartered Accountant: SUFIYAN VANCHESA; Chartered Accountant: Praful Suhas Sawant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback