ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Siddharth Nagar Samata

Registered No litigation declared Others project

Siddharth Nagar Samata

By White Water Developers

RG-MH-84068 · RERA P51800028598 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 51 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 51 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
23 of 57Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Siddharth Nagar Samata is a Others project by White Water Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028598 on 25 Mar 2021. Possession is promised by 31 Jul 2027. The completion date has moved by 51 months from the original filing. 34 of the 57 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSiddharth Nagar Samata
  • TypeOthers
  • Location
    • Vivek College Road
    • Siddhrath Nagar
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028598
  • ReraGenie IDRG-MH-84068

Builder

  • NameWhite Water Developers
  • Entity typePartnership
  • PartnersSameer Desai, Sameer Mungekar
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2021First promiseApr 2023Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2021
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 30 Apr 2023)
  • Buildings1 building record
  • Documents filed75 files

Current status

60%34 of 57 units booked
61.5%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
S N Samata C H SNA131357057

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

S N Samata C H S: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes97%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered60
Open Space3

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area737 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Mar 2026

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI2597.61
Proposed, not sanctioned1,783 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 7 Rustomjee Ozone, Laxmi Singh Complex Goregaon west MUMBAI 400062
Estimated costRs 6.50 cr
Cost incurredRs 4.00 cr
Work done61.54%
BuildingWingEstimatedIncurred
S N Samata C H SNARs 6.50 crRs 4.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra Dewoolkar
ArchitectJINISH SONI
EngineerVivek Kanekar
EngineerNITIN ELLORA
Chartered AccountantC A Virag Shah
Chartered AccountantNEHALI DOSHI
Chartered AccountantJIMIT SHAH
PartnerRole in project
White Water Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017029Apr 2023 → Apr 2024

Reason as filed by the promoterBrief facts and circumstances which has led to the filing of the present application is enumerated herein below for reference: 1. The Promoter is the owner of all that piece and parcel of land bearing C.T.S. No. 353 (pt), admeasuring 737.22 sq. mtr., of Village Pahadi Goregaon, Taluka Borivali, District Mumbai Suburban situated at Siddharth Nagar MHADA Layout, Goregaon (West), Mumbai.b(hereinafter referred to as “the said Land”). The Promoter had proposed to construct a real estate project in the name and style of Siddharth Nagar Samta. 2. On or about 14th June, 2023, the aforesaid real estate

EXT51800024711Apr 2023 → Jul 2025

Reason as filed by the promoterDUE TO COVID 19 NOT ABLE TO COMPLETE PROJECT PLEASE GRAT US EXTENSION TILL 31/07/2025

EA17042620662Apr 2023 → Jul 2027

Reason as filed by the promoter1. Regullatory Migration and Compliance Requirements: Due to recent updates in the MahaRERA system, we were required to undergo a migration process. Post migration, we had to prepare and submit all pending and updated quarterly progress reports and related documentation, which involved considerable time and effort and resulted in delay. 2. MHADA Compliance: The project is being executed in accordance with MHADA rules and regulations. Compliance with such requirements involves detailed documentation, procedural approvals, and coordination with authorities, which has consumed additional time. 3.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000354304Ashok Nathalal GandhiWhite WaterDevelopers11/02/2023
CC006000000396846Chandresh Nandlal VoraMumbai Shelter Housing Development project samata28/07/2023
CC12501380Harsha JainWhite Water Developers25/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jan 2021

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Architect Rera Certificate Jan 2026 to March 2026.pdf13 Jun 2026
Withdrawal Update Form 2File: FORM 2_Jan to March 2026 signed.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3 Jan 2026 to March 2026.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 03_1_2026.pdf6 Jun 2026
Withdrawal Update Form 2File: Engineers Certifiacte oct to dec.pdf6 Jun 2026
Withdrawal Update Form 3File: CA Form 3.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 01_07_2025.pdf6 Apr 2026
Withdrawal Update Form 1File: Form 1 01_10_2025.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 1st July 2025.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 1_10_2025.pdf6 Apr 2026
Withdrawal Update Form 3File: CA Form 3.pdf6 Apr 2026
Withdrawal Update Form 3File: CA Form 3.pdf6 Apr 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf25 Oct 2024
Declaration in FORM BFile: Form B-1.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold Inventory updated 1.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold Inventory (1).pdf10 Aug 2024
Declaration in FORM BFile: Form B promoter .pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: sold unsold inventory .pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 20-21.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 21-22.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 22-23.pdf23 Nov 2023
CERSAI detailsFile: Cersai Declartation.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf22 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: P51800028598_FileName_0.pdf4 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: P51800028598_FileName_0.pdf4 Sep 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf4 Sep 2023
Declaration in FORM BFile: Form B Promoter.pdf4 Sep 2023
Declaration in FORM BFile: Form B - Society.pdf4 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect certificate.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_Aug 2023.pdf4 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold and unsold flats wwd.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf4 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Samata Certificate (E-signed).pdf30 Sep 2021
Layout approvalFile: Scan_20210309_104318.pdf9 Mar 2021
Layout approvalFile: Scan_20210309_104318.pdf9 Mar 2021
Copy of Layout Approval (in case of layout)File: Scan_20210309_104318.pdf9 Mar 2021
Copy of Layout Approval (in case of layout)File: Scan_20210309_104318.pdf9 Mar 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society.pdf9 Mar 2021
Building plan approvalFile: Sheet 2 22072020.pdf5 Mar 2021
Building plan approvalFile: Sheet 3 22072020.pdf5 Mar 2021
Building plan approvalFile: Sheet 4 22072020.pdf5 Mar 2021
Building plan approvalFile: Sheet 5 22072020.pdf5 Mar 2021
Building plan approvalFile: Sheet 6 22072020.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2 22072020.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3 22072020.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4 22072020.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5 22072020.pdf5 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 6 22072020.pdf5 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC upto 16th floor.pdf5 Mar 2021
Details of encumbrancesFile: MAHA RERA no encum.pdf11 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA CC no 2A.pdf11 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: RERA CC no 2A.pdf11 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA CC no 2A.pdf11 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA CC no 2A.pdf11 Feb 2021
Details of Restarting of Construction work post lockdownFile: RERA CC no 2A.pdf11 Feb 2021
OtherFile: RERA main prayer_compressed.pdf11 Feb 2021
Building plan approvalFile: Sheet 1 22072020.pdf10 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 1 22072020.pdf10 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf10 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Final Form 3 Signed.pdf10 Feb 2021
OtherFile: RPM_MCHI_518000_MSUB_679.pdf5 Feb 2021
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf27 Jan 2021
Declaration in FORM BFile: Undertaking Form B Samata_compressed.pdf27 Jan 2021
PAN CardFile: WWD PAN.pdf23 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 22072020.pdf23 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_compressed.pdf23 Jan 2021
Proforma of Allotment letterFile: Blank_Samata__Allotment_Letter.pdf22 Jan 2021
Proforma of Allotment letterFile: ModelAgreementforSale.pdf22 Jan 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Certificate.pdf22 Jan 2021
OtherFile: Janta Insurance Policy.pdf22 Jan 2021

How this compares with Mumbai Suburban

60%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 51 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddharth Nagar Samata on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Siddhrath Nagar6,700+ in Mumbai Suburban

2 kmSiddharth Nagar SamataCompleted 135Lapsed / revoked 71Abeyance 1Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 349 registered projects within 2 km.

Builder: White Water Developers

White Water Developers has 2 registrations on MahaRERA, including Siddharth Nagar Parijat and Siddharth Nagar Samata. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Siddharth Nagar Samata is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddharth Nagar Samata?

The registered promoter entity is White Water Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddharth Nagar Samata?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Siddharth Nagar Samata?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Siddharth Nagar Samata?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddharth Nagar Samata?

The professionals named in the filing: Architect: Jitendra Dewoolkar; Architect: JINISH SONI; Engineer: Vivek Kanekar; Engineer: NITIN ELLORA; Chartered Accountant: C A Virag Shah; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddharth Nagar Samata?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddharth Nagar Samata. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddharth Nagar Samata to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.