Registered No litigation declared Residential / Group Housing project

SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD

By SHIVAM PARIVAR DEVELOPERS PVT LTD

RG-MH-97086 · RERA P51800011260 · Last updated on MahaRERA portal: 6 Nov 2024

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 27%
4Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD is a Residential / Group Housing project by SHIVAM PARIVAR DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011260 on 31 Aug 2017. Possession is promised by 30 Dec 2026. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD
  • TypeResidential / Group Housing
  • Location
    • Siddharth Nagar road no 5
    • Goregaon west
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011260
  • ReraGenie IDRG-MH-97086

Builder

  • NameSHIVAM PARIVAR DEVELOPERS PVT LTD
  • Entity typeCompany
  • DirectorsSanjay Waman Bhosale, Pramod Waman Bhosale, Ajit Waman Bhosale
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTDNA2828000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 27%.

SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks26%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%

Progress on shared amenities15

As on 6 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered1
Open Space8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,213 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBuilding Permission Cell Greater Mumbai
Permissible FSI9231.22
Proposed, not sanctioned784 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch343, Mani Bhavan, SV Rd, OPP, Jawahar Nagar, Goregaon, Mumbai, Maharashtra 400104

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Molders
EngineerGireesh rajadhyaksh
PartnerRole in project
SHIVAM PARIVAR DEVELOPERS PVT LTD-

Litigation declared11

CaseCourtStatus
CC/15/480/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/481/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/482/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/483/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/484/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/485/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/486/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/487/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/488/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/489/2015STATE CONSUMER COMMISSIONFOR EVIDENCE
CC/15/490/2015STATE CONSUMER COMMISSIONFOR EVIDENCE

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000192355Jasbir KaurShiwam Parivar Developers Pvt. Ltd.30/01/2020
CC006000000192356Sushma Paramjeet SahaniShivam Parivar Developers Private Limited30/01/2020
CC006000000057616AVINASH ANANT MORESHIVAM PARIVAR DEVELOPERS PRIVATE LIMITED24/01/2019
CC006000000110789Mr. Vijay Bhaurao ThakareM/s. Shivam Parivar Developers Pvt. Ltd.11/09/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf6 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers certificate.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Certificates.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: RERA - Jagruti as on 31032024_compressed.pdf12 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC JAGRUTI -21122021.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: Discloure of Sold - June - Jagruti_compressed.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: Discloure of Sold - Sept - Jagruti_compressed.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Dec-2023_compressed.pdf6 Apr 2024
Proforma of Allotment letterFile: Allotment Letter- JAGRUTI CHSL.pdf6 Apr 2024
Proforma of Agreement for saleFile: AFS-draft - JAGRUTI CHSL.pdf6 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201223 Form-1 Paschim Jagruti.pdf22 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18122023 Jagruti Engineers Certificate.pdf22 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Paschim Jagruti_Form 2_Dec 21.pdf12 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Paschim Jagruti.pdf2 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Jagruti CHSL.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 19.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: June 19.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sept 19.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Dec 19.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 20.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June 20.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sept 20.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dec 20.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 21.pdf27 Jul 2021
Declaration about Commencement CertificateFile: Declaration for CC - Paschim Jagruti CHSL.pdf14 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jagruti CHSL.pdf3 Jun 2021
Building plan approvalFile: IOD - 14 08 19.pdf26 May 2021
Layout approvalFile: Plan copy 1.pdf26 May 2021
Layout approvalFile: Plan copy 2.pdf26 May 2021
Layout approvalFile: Plan Copy 3.pdf26 May 2021
Layout approvalFile: Plan copy 4.pdf26 May 2021
Layout approvalFile: Plan copy 5.pdf26 May 2021
Layout approvalFile: Plan Copy 6.pdf26 May 2021
Layout approvalFile: Plan Copy 7.pdf26 May 2021
Layout approvalFile: Plan copy 8.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan copy 1.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan copy 2.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan Copy 3.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan copy 4.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan copy 5.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan Copy 6.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan Copy 7.pdf26 May 2021
Copy of Layout Approval (in case of layout)File: Plan copy 8.pdf26 May 2021
Building Plan Approval (IOD)File: IOD - 14 08 19.pdf26 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 30 11 2019.pdf26 May 2021
Proforma of Allotment letterFile: Draft Agreement for Sale.pdf26 May 2021
Proforma of Allotment letterFile: Draft Allotment Letter.pdf26 May 2021
Building plan approvalFile: IOD - 14 08 19.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 1.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 2.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 3.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 4.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 5.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 6.pdf17 Dec 2020
Layout approvalFile: sanctioned Plan 7.pdf17 Dec 2020
Layout approvalFile: Sanctioned Plan 8.pdf17 Dec 2020
Details of encumbrancesFile: No-encumbrance Certificate of Jagruti.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 2.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 3.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 4.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 5.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 6.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: sanctioned Plan 7.pdf17 Dec 2020
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 8.pdf17 Dec 2020
Building Plan Approval (IOD)File: IOD - 14 08 19.pdf17 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf17 Dec 2020
Declaration in FORM BFile: Form B - Jagruti.pdf17 Dec 2020
PAN CardFile: spdpl pan card.pdf8 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: CC of Jagruti (2).pdf8 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Jagruti.pdf16 Aug 2017
Certificates of CA (Form 3)File: Form 3 Jagruti.pdf16 Aug 2017
Proforma of Allotment letterFile: Allotment Letter AND AFS.pdf16 Aug 2017
Layout approvalFile: scan1 Page.pdf6 Aug 2017
Layout approvalFile: scan1 Page two.pdf6 Aug 2017
Layout approvalFile: scan1_Page three.pdf6 Aug 2017
Layout approvalFile: scan1 Page four.pdf6 Aug 2017
Building plan approvalFile: Letter IOD Jagruti final.pdf6 Aug 2017
Copy of the legal title reportFile: Jagruti - Title Certificate.pdf6 Aug 2017
Details of encumbrancesFile: Jagruti - Encrumb.pdf6 Aug 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon west6,700+ in Mumbai Suburban

2 kmSIDDHARTH NAGAR PASCHIM Completed 136Lapsed / revoked 62Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 336 registered projects within 2 km.

Builder: SHIVAM PARIVAR DEVELOPERS PVT LTD

SHIVAM PARIVAR DEVELOPERS PVT LTD has 5 registrations on MahaRERA, including SIDDHARTH NAGAR GULMOHAR CHS LTD and NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

The registered promoter entity is SHIVAM PARIVAR DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

The professionals named in the filing: Architect: Space Molders; Engineer: Gireesh rajadhyaksh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.