Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 98%
30 of 79Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SIDDHARTH NAGAR PARADISE CHS LTD is a Mixed project by INFINITY CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049649 on 22 Feb 2023. Possession is promised by 31 Dec 2026. 49 of the 79 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSIDDHARTH NAGAR PARADISE CHS LTD
  • TypeMixed
  • Location
    • VIVEK VIDYALAY SCHOOL ROAD
    • SIDDHARTH NAGAR GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049649
  • ReraGenie IDRG-MH-68364

Builder

  • NameINFINITY CONSTRUCTIONS
  • Entity typePartnership
  • PartnersIRSHAD HANIF MULLA, AYAN IRSHAD MULLA
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

62%49 of 79 units booked
45.9%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARADISE CHS LTD BLDG NO 22NA232277178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 98%.

PARADISE CHS LTD BLDG NO 2282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered41

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,570 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI3730.53
Proposed, not sanctioned3,731 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS V ROAD SIDDHARTH NAGAR
Estimated costRs 33.95 cr
Cost incurredRs 15.58 cr
Work done45.9%
BuildingWingEstimatedIncurred
PARADISE CHS LTD BLDG NO 22NARs 33.95 crRs 15.58 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MOULDERS
ArchitectCHANDAN PRABHAKAR KELEKAR
EngineerCHANDRAKANT SHINGADE
EngineerHafiz Shaikh
EngineerRandhir Awalkar
Chartered AccountantBHAVESH C VITHLANI
Chartered AccountantSUFIYAN VANCHESA
Chartered AccountantPraful Suhas Sawant
PartnerRole in project
INFINITY CONSTRUCTIONS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400813Suraj Sadanand ShettyINFINITY CONSTRUCTIONS18/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Paradise form 2A 2024-2025.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: 2025-26 PARADISE FORM 2A.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM 1 PARADISE.pdf30 Jun 2026
Withdrawal Update Form 2File: FORM 2 PARADISE.pdf30 Jun 2026
Withdrawal Update Form 3File: PARADISE FORM 3 31032026.pdf30 Jun 2026
Withdrawal Update Form 1File: paradise 30092025.pdf13 May 2026
Withdrawal Update Form 1File: paradise 31122025.pdf13 May 2026
Withdrawal Update Form 2File: PARADISE FORM 2 300925.pdf13 May 2026
Withdrawal Update Form 2File: PARADISE FROM 2 31122025.pdf13 May 2026
Withdrawal Update Form 3File: PARADISE FORM 3 AS ON 30092025.pdf13 May 2026
Withdrawal Update Form 3File: PARADISE FORM 3 AS ON 31122025.pdf13 May 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Siddhivinayak.pdf21 Mar 2026
Form 5 (FY 2023-2024)File: FORM 5 Paradise FY 202324.pdf20 Mar 2026
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 3File: FORM 3 PARADISE.pdf12 Jun 2025
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 3File: FORM 3 PARADISE .pdf12 Jun 2025
Form 1File: Form 1.pdf12 Jun 2025
Form 2File: Form 2.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOS.pdf12 Jun 2025
Form 3File: FORM 3 PARADISE.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARADISE .pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: DOS of Q3 of FY 24-25.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARADISE AS ON 30092024.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE PARADISE AVENUE AS ON 30092024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 PARADISE.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Siddharth Paradise_Sold Unsold Disclosure_ 30-06-24.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Paradise_04_23-24-Q1_24-25_P1-P2.pdf6 Aug 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE Paradise_11072024.pdf5 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: FCC Paradise Issued on 02-05-2024_Valid Upto 25-08-2024_ Upto 20th FLR.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Siddharth Paradise Sold Unsold Disclosure.pdf29 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC PARADISE.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: Q3 Siddharth Paradise_Sold Unsold Disclosure_ as on Dec 2023_23012024.pdf25 Jan 2024
Building plan approval or NA orderFile: IOD Paradise.pdf19 Jan 2024
Layout approvalFile: Layout_Paradise_Part2_compressed.pdf19 Jan 2024
Layout approvalFile: Layout_Paradise_Part1_compressed.pdf19 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout_Paradise_Part1_compressed.pdf19 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout_Paradise_Part2_compressed.pdf19 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Paradise.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidation Certificate for Paradise.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Paradise 15102023 Q2.pdf25 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory PARADISE_Q2_15102023_24112023_P1-P3.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Paradise as on date 15102023.pdf25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Paradise FY 22-23.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Paradise.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Book InventryPARADISE.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A_ Quality Assurance Certificate.pdf24 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of -Sold -Book Inventry.pdf24 Aug 2023
Other - TechnicalFile: Change In Plot Area on Architect Letter Paradise.pdf10 Feb 2023
Layout approvalFile: IOD_PAGE_1_compressed.pdf27 Jan 2023
Layout approvalFile: IOD_PAGE_2_compressed.pdf27 Jan 2023
Layout approvalFile: IOD_PAGE_3_compressed.pdf27 Jan 2023
Layout approvalFile: IOD_PAGE_4_compressed.pdf27 Jan 2023
Layout approvalFile: IOD_PAGE_5_compressed.pdf27 Jan 2023
Layout approvalFile: IOD_PAGE_6_compressed.pdf27 Jan 2023
Building plan approval or NA orderFile: IOD_COVERING.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_1_compressed.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_2_compressed.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_3_compressed.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_4_compressed.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_5_compressed.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD_PAGE_6_compressed.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD_COVERING.pdf27 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration Annexure - A.pdf3 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Paradise CHS LTD .pdf2 Jan 2023
Proforma of Agreement for saleFile: PROFORMA OF AGREEMENT FOR SALE.pdf2 Jan 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf20 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report on Allotment Letter.pdf20 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for Sale.pdf20 Dec 2022
Proforma of Allotment letterFile: Allotment Letter Of Paradise On Letter Head.pdf12 Dec 2022
CERSAI detailsFile: CERSAI DETAILS.pdf6 Dec 2022
PAN CardFile: 1_INFINITY PAN CARD.pdf4 Oct 2022
Copy of the legal title reportFile: Copy of legal title report.pdf4 Oct 2022
Details of encumbrances concerned to FinanceFile: Encumberances certificates.pdf4 Oct 2022
Details of encumbrances concerned to LegalFile: Encumberances certificates.pdf4 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC issued on 26 08 2022 _top of Stilt Paradise_(1).pdf4 Oct 2022

How this compares with Mumbai Suburban

62%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHARTH NAGAR PARADISE CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SIDDHARTH NAGAR GOREGAON WEST6,700+ in Mumbai Suburban

2 kmSIDDHARTH NAGAR PARADISECompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: INFINITY CONSTRUCTIONS

INFINITY CONSTRUCTIONS has 2 registrations on MahaRERA, including SIDDHARTH NAGAR PARADISE CHS LTD and SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SIDDHARTH NAGAR PARADISE CHS LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHARTH NAGAR PARADISE CHS LTD?

The registered promoter entity is INFINITY CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHARTH NAGAR PARADISE CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIDDHARTH NAGAR PARADISE CHS LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIDDHARTH NAGAR PARADISE CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHARTH NAGAR PARADISE CHS LTD?

The professionals named in the filing: Architect: SPACE MOULDERS; Architect: CHANDAN PRABHAKAR KELEKAR; Engineer: CHANDRAKANT SHINGADE; Engineer: Hafiz Shaikh; Engineer: Randhir Awalkar; Chartered Accountant: BHAVESH C VITHLANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHARTH NAGAR PARADISE CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHARTH NAGAR PARADISE CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHARTH NAGAR PARADISE CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.