Home / Browse projects / Mumbai Suburban, Maharashtra / SIDDHARTH NAGAR GULMOHAR CHS LTD
SIDDHARTH NAGAR GULMOHAR CHS LTD
By SHIVAM PARIVAR DEVELOPERS PVT LTD
RG-MH-75300 · RERA P51800008681 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 6 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHARTH NAGAR GULMOHAR CHS LTD is a Residential / Group Housing project by SHIVAM PARIVAR DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008681 on 19 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 131 of the 155 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameSIDDHARTH NAGAR GULMOHAR CHS LTD
- TypeResidential / Group Housing
- Location
- Siddharth Nagar Road No 2 MIG Colony
- Goregaon west
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008681
- ReraGenie IDRG-MH-75300
Builder
- NameSHIVAM PARIVAR DEVELOPERS PVT LTD
- Entity typeCompany
- DirectorsSanjay Waman Bhosale, Pramod Waman Bhosale, Ajit Waman Bhosale
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed183 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHARTH NAGAR GULMOHAR CHS LTD | NA | 25 | 25 | 146 | 9 | 155 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 94%.
SIDDHARTH NAGAR GULMOHAR CHS LTD: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 94% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 56% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 77% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 53% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SIDDHARTH NAGAR GULMOHAR CHS LTD | NA | Rs 92.33 cr | Rs 87.71 cr |
| - | NA | Rs 1.62 cr | Rs 1.54 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Moulders |
| Engineer | Vaijnath Nachankar |
| Chartered Accountant | Shripati Gandhi Choudhari and Co |
| Chartered Accountant | Rahul Bera |
| Partner | Role in project |
|---|---|
| SHIVAM PARIVAR DEVELOPERS PVT LTD | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per attachment
Reason as filed by the promoterThe current facts of the case are being explained hereunder. We started construction work in the full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed.Industry Slow Down - As everybody is aware, Real Estate Industry is facing severe slowdown all across the country and we are no exceptions. It has affected our sales and further our liquidity. Lack of liquidity is affecting project progress which ultimately aff
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 3091/2014 | City Civil Court at Dindoshi | For Hearing |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055428 | Gajesh Dattatray Surve | Shivam Parivar Developers Pvt Ltd | 19/07/2018 |
| CC006000000079147 | Sarju Kamlekar | shivam parivar developers | 04/05/2019 |
| CC006000000089839 | RAJESH KHANDHAR AND ASHA KHANDHAR | SHIVAM PARIVAR DEVELOPERSPRIVATE LIMITED | 24/06/2019 |
| CC006000000193349 | Anil Kumar | Shivam Parivar Developers Pvt. Ltd | 29/06/2020 |
| CC12502923 | Abdul Munaf Abdul Aziz Solanki | Siddharth Nagar Gulmohar CoOperative Housing Society Limited Respondent Landowner Promoter | 20/08/2025 |
| CC12600936 | Karan Veer Mehra | SHIVAM PARIVAR DEVELOPERS PVT LTD | 20/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Gulmohar - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Gulmohar - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Gulmohar - March 26.pdf | 23 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form-2A Gulmohar March 2026.pdf | 21 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 5 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form-2A Gulmohar March-2025.pdf | 19 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form 5 - Gulmohar FY 20-21.pdf | 19 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 - Gulmohar FY 21-22.pdf | 19 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - Gulmohar FY 22-23.pdf | 19 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Gulmohar FY 23-24.pdf | 19 Feb 2026 |
| Form 2A (FY 2019-2020)File: Form 2A - 19-20.pdf | 18 Feb 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - 20-21.pdf | 18 Feb 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - 21-22.pdf | 18 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - 22-23.pdf | 18 Feb 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 18 Feb 2026 |
| Form 5 (FY 2019-2020)File: Form 5 - 19-20.pdf | 18 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Gulmohar - Dec 25.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Gulmohar - Dec 25.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Gulmohar - Dec 25 sign.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Gulmohar Sept 25_page-.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 - Sept 25.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Gulmohar - Sept 25.pdf | 5 Dec 2025 |
| Withdrawal Update Form 1File: Form-1 Gulmohar June 25.pdf | 25 Sep 2025 |
| Withdrawal Update Form 2File: Form-2 Gulmohar June-2025.pdf | 25 Sep 2025 |
| Withdrawal Update Form 3File: GULMOHAR JUNE 25 FORM 3 signed.pdf | 25 Sep 2025 |
| Form 1File: Form-1 Gulmohar Dec 24.pdf | 17 Jul 2025 |
| Form 2File: Form-2 Gulmohar March 2025.pdf | 17 Jul 2025 |
| Form 3File: FORM 3 - Gulmohar - March 25.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: RERA Disclosure - Gulmohar.pdf | 17 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Gulmohar - Declaration about Separate Bank Ac.pdf | 11 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration for Separate Bank Ac - Gulmohar CHSL.pdf | 11 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Gulmohar Dec24.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR MARCH 2020.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR MARCH 2021.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR MARCH 2022.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR MARCH 2023.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR MARCH 2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR JUNE 2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR SEPTEMBER 2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR DECEMBER 2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3- GULMOHAR DECEMBER 2024_1.pdf | 31 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Gulmohar Dec24.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Gulmohar FY 19-20.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Gulmohar FY 20-21.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RERA Disclasure - 30062024 Gulmohar.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RERA Disclosure Gulmohar - Sept 24.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RERA Disclosure - Gulmohar CHSL - December 2024.pdf | 31 Jan 2025 |
| CERSAI detailsFile: Declaration CERSAI for Gulmohar CHSL.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Gulmohar FY 21-22.pdf | 31 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest in other RERA - Ajit Bhosale.pdf | 31 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest in other RERA - Sanjay Bhosale.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Gulmohar FY 22-23.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Gulmohar FY 23-24.pdf | 31 Jan 2025 |
| Declaration in FORM BFile: Affidevit Cum Declaration - Form B - Gulmohar_compressed.pdf | 6 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gulmohar Form-1 March24.pdf | 6 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gulmohar Form-1 June-24.pdf | 6 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GulmoharForm-1 Sept24.pdf | 6 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Gulmohar Sept-24.pdf | 6 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Gulmohar March-24.pdf | 6 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Gulmohar June-24.pdf | 6 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Gulmohar Form2A Year 21-22.pdf | 6 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Gulmohar Form2A Year 22-23.pdf | 6 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Gulmohar Form 2A year 23-24.pdf | 6 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked inventory_compressed.pdf | 12 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold - June_compressed.pdf | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold - Sept_compressed.pdf | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold - Dec - Gulmohar compressed.pdf | 6 Apr 2024 |
| Proforma of Agreement for saleFile: APF - DRAFT Gulmohar.pdf | 6 Apr 2024 |
| Proforma of Allotment letterFile: Allotment As per Rera - Gulmohar.pdf | 6 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Gulmohar.pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18122023 Gulmohar Engineers Certificate.pdf | 22 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Gulmohar CC 25-03-2023.pdf | 24 Mar 2023 |
| Declaration about Commencement CertificateFile: Declaration for CC- Gulmohar.pdf | 24 Mar 2023 |
| Building plan approvalFile: IOD -07-09-2022.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0001.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0002.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0003.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0004.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0005.pdf | 16 Sep 2022 |
| Layout approvalFile: MYSCAN_20220909_0006.pdf | 16 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHARTH NAGAR GULMOHAR CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon west6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SHIVAM PARIVAR DEVELOPERS PVT LTD
SHIVAM PARIVAR DEVELOPERS PVT LTD has 5 registrations on MahaRERA, including SIDDHARTH NAGAR GULMOHAR CHS LTD and NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SIDDHARTH NAGAR GULMOHAR CHS LTD is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHARTH NAGAR GULMOHAR CHS LTD?
The registered promoter entity is SHIVAM PARIVAR DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHARTH NAGAR GULMOHAR CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIDDHARTH NAGAR GULMOHAR CHS LTD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIDDHARTH NAGAR GULMOHAR CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHARTH NAGAR GULMOHAR CHS LTD?
The professionals named in the filing: Architect: Space Moulders; Engineer: Vaijnath Nachankar; Chartered Accountant: Shripati Gandhi Choudhari and Co; Chartered Accountant: Rahul Bera. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHARTH NAGAR GULMOHAR CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback