Red flags

  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 17.50 crore secured on the land, in favour of Motilal Oswal Home Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 18 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SHRIRAM SKYPARK is a Others project by SHRIRAM SAMRUDDHI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052123 on 24 Jul 2023. Possession is promised by 25 Jun 2027. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSHRIRAM SKYPARK
  • TypeOthers
  • Location
    • Charholi Bk
    • Pune
    • CHARHOLI
    • Haveli
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052123
  • ReraGenie IDRG-MH-76494

Builder

  • NameSHRIRAM SAMRUDDHI DEVELOPERS
  • Entity typePartnership
  • PartnersMahesh Sahebrao Gayake, Mahadev Narayan Kawade
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2023First promiseDec 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jul 2023
  • Promised completion25 Jun 2027
  • Revised completionRevised to 25 Jun 2027 (originally 22 Dec 2025)
  • Buildings2 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRIRAM SKYPARK A WINGNA110000
SHRIRAM SKYPARK B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

SHRIRAM SKYPARK A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHRIRAM SKYPARK B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63
BuildingClosed/CoveredTotal
SHRIRAM SKYPARK A WING5151
SHRIRAM SKYPARK B WING1212

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,785 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMotilal Oswal Home Finance Limited
Secured amountRs 17.50 crore
CERSAI search filedYes
Declared on18 Oct 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI6578.02
Proposed, not sanctioned6,578 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPorwal Road Lohegaon Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil & Bugade Associates
EngineerRavindra Dayanand Kale
EngineerShrirish Balasaheb Raut
Chartered AccountantS B D M & Co
PartnerRole in project
SHRIRAM SAMRUDDHI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028085Dec 2025 → Jun 2027

Reason as filed by the promoterDear Sir, This is to bring to your notice that we have completed all the compliances of our project and we have taken consent of 51% allotttess for further extension of our project which is 25/06/2027. Hence we request you to grant extension for our project till 25/06/2027

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Jun 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1.pdf17 Apr 2026
Form 2File: Form 2.pdf17 Apr 2026
Form 3File: SSD - Form 3.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory for AB wing.pdf17 Apr 2026
Form 2File: Form 2.pdf27 Jan 2026
Form 1File: Form 1.pdf27 Jan 2026
Form 3File: Form 3 CA Certificate.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf27 Jan 2026
Form 1File: Form 1 Architect Certificate Final.pdf27 Jan 2026
Form 2File: Form 2 Engineers Certificate - Final.pdf27 Jan 2026
Form 3File: Form 3 CA Certificate Final Skypark.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: ilovepdf_merged.pdf27 Jan 2026
Form 1File: Form 1.pdf22 Jul 2025
Form 2File: Form 2.pdf22 Jul 2025
Form 3File: Form 3.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold AB Wing.pdf22 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2024-25) Final 2 (1).pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architects Certificate Final.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate Final (1) (1).pdf16 May 2025
Disclosure of sold/ booked inventoryFile: dis.pdf16 May 2025
Declaration in FORM BFile: Form B Promotors.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed (1).pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Final.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf9 May 2025
Other - TechnicalFile: Pert Chart.pdf9 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Audit Report -.pdf9 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2024-25).pdf29 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Audit Report.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skypark Form 2 CA Certificate.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBRANCES CONCERNED TO FINANCE.pdf13 Jul 2023
Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBRANCES CONCERNED TO FINANCE.pdf13 Jul 2023
CERSAI detailsFile: Declaration with Respect to Security Interest and Finance Charges.pdf13 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects.pdf13 Jul 2023
Copy of the legal title reportFile: Sky Park - Legal Report-3-6.pdf4 Jul 2023
Copy of the legal title reportFile: Sky Park - flow report_compressed (1).pdf4 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200273374099_For_Asset_Based_Search_04_07_2023_11_11_40_061.pdf4 Jul 2023
Proforma of Allotment letterFile: ilovepdf_merged (33).pdf15 Jun 2023
Declaration in FORM BFile: Declaration - Shriram Samruddhi Developers.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Gayake.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Kawade.pdf14 Jun 2023
Proforma of Agreement for saleFile: shriram skypark agreement.pdf13 Jun 2023
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (12).pdf12 Jun 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (19).pdf12 Jun 2023
Building plan approvalFile: 2.pdf12 Jun 2023
Building plan approvalFile: 4.pdf12 Jun 2023
Building plan approvalFile: 5.pdf12 Jun 2023
Building plan approvalFile: 6.pdf12 Jun 2023
Building plan approvalFile: 7.pdf12 Jun 2023
Building plan approvalFile: 8.pdf12 Jun 2023
Building plan approvalFile: 9.pdf12 Jun 2023
Building plan approvalFile: 10.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (31).pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: ilovepdf_merged (31).pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (12).pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (19).pdf12 Jun 2023
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf12 Jun 2023
Deviation Report with respect to Allotment letterFile: Daviation Report with respect to the Allottment Letter.pdf12 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Daviation Report with respect to the Aggrement to sale.pdf12 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf8 Jun 2023
PAN CardFile: Shriram Samruddhi Developers PAN Both Side.pdf7 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHRIRAM NYSAP52100049622PUNE282Feb 2023OngoingDec 2027Not due yet
VIVAAN PARKP52100029803LOHGAON, Pune211Jul 2021OngoingDec 2026Not due yet

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRIRAM SKYPARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmSHRIRAM SKYPARKCompleted 163Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: SHRIRAM SAMRUDDHI DEVELOPERS

SHRIRAM SAMRUDDHI DEVELOPERS has 2 registrations on MahaRERA, including SHRIRAM SKYPARK and SHRIRAM NYRA. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHRIRAM SKYPARK is delayed beyond 25 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRIRAM SKYPARK?

The registered promoter entity is SHRIRAM SAMRUDDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRIRAM SKYPARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRIRAM SKYPARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRIRAM SKYPARK?

The professionals named in the filing: Architect: Patil & Bugade Associates; Engineer: Ravindra Dayanand Kale; Engineer: Shrirish Balasaheb Raut; Chartered Accountant: S B D M & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIRAM SKYPARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIRAM SKYPARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIRAM SKYPARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.