ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / Shri Shri Enclaves

Registered No litigation declared Others project

Shri Shri Enclaves

By Balkrishna Bhaskar Sawant

RG-MH-93668 · RERA P52900034558 · Last updated on MahaRERA portal: 26 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 98%
45 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Shri Shri Enclaves is a Others project by Balkrishna Bhaskar Sawant in Sindhudurg, Maharashtra, registered with MahaRERA as P52900034558 on 11 Apr 2022. Possession is promised by 31 Mar 2027. 4 of the 49 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameShri Shri Enclaves
  • TypeOthers
  • Location
    • Pandur
    • Kudal
    • Sindhudurg
    • 416521
  • Pincode416521
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900034558
  • ReraGenie IDRG-MH-93668

Builder

  • NameBalkrishna Bhaskar Sawant
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Apr 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

8%4 of 49 units booked
42.9%Work done, per cost certificate

Figures as on 26 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA66161026
Building BNA6623023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.

Building A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%

Progress on shared amenities15

As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered20
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
Building A101929
Building B101929

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 May 2025
LandownerVillageDistrict
Dayanand Vasant AnavkarPandurSindhudurg

Approvals and building plan

Sanctioning authorityGrampanchayat Pandur and Department of Town Planning Sindhudurg
Permissible FSI3451.46
Proposed, not sanctioned2,857 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBazar Peth, Kadawal, Sindhudurg 416521
Estimated costRs 7.36 cr
Cost incurredRs 3.15 cr
Work done42.88%
BuildingWingEstimatedIncurred
Building ANARs 3.21 cr-
Building BNARs 3.09 crRs 3.00 cr
-NARs 1.06 crRs 15.50 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRupesh N Tawate
EngineerRupesh N Tawate
Chartered AccountantSagar G Teli
PartnerRole in project
Balkrishna Bhaskar Sawant-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate 30Jun25.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 30Sep25.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 31Dec25.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30Jun25.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30Sep25.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31Dec25.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 30Jun25.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 30Sep25.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 31Dec25.pdf26 Feb 2026
Form 1File: Form 1 Architect Certificate March2025.pdf25 Feb 2026
Form 2File: Form 2 Engineer Certificate March2025.pdf25 Feb 2026
Form 3File: Form 3 CA Certificate 31Mar25.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 2025 Sawant.pdf25 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate March2025.pdf25 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 31Dec25.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate March2025.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate March2025.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 31Mar25.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 31Dec25.pdf25 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 Form1 31Dec2024.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 Form2 31Dec2024.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 CA Certificate BSawant Jun2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 08 CA Certificate BSawant Dec2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 CA Certificate BSawant Sep2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 CA Certificate BSawant Mar2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 CA Certificate BSawant Dec2023.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 CA Certificate BSawant Sep2023.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 CA Certificate BSawant Jun2023.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 CA Certificate BSawant Mar2023.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Balkrishna Sawant.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2023.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Form1 30june2023.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Form1 30sep2023.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Form1 31dec2023.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Form1 31mar2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Form1 30june2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 Form1 30sep2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form1 31mar2023.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Form2 31mar2023.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form2 30june2023.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Form2 30sept2023.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Form2 31dec2023.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Form2 31mar2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Form2 30june2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 Form2 30sep2024.pdf23 Jan 2025
Proforma of Allotment letterFile: Agreement to sale.pdf22 Jul 2022
Other - LegalFile: Final Sale Deed.pdf22 Jul 2022
Layout approvalFile: PDF 10_compressed Upload.pdf3 Apr 2022
Copy of Layout Approval (in case of layout)File: PDF 10_compressed Upload.pdf3 Apr 2022
CERSAI detailsFile: Asset Based Search Final.pdf3 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Below 2 Mb.pdf3 Apr 2022
Proforma of Allotment letterFile: Draft_Agreement_to_Sale.pdf3 Apr 2022
Building plan approvalFile: NA Order.pdf1 Apr 2022
PAN CardFile: Pan Card.pdf1 Apr 2022
Copy of the legal title reportFile: Legal Title Report.pdf1 Apr 2022
Details of encumbrancesFile: No Encumbrances Declaration.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf1 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf1 Apr 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf1 Apr 2022
Declaration in FORM BFile: Form B Promoter B Sawant.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf1 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf1 Apr 2022
CERSAI detailsFile: CERSAI Declaration.pdf1 Apr 2022

How this compares with Sindhudurg

8%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Shri Shri Enclaves on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pandur530+ in Sindhudurg

Builder: Balkrishna Bhaskar Sawant

Balkrishna Bhaskar Sawant has 1 registration on MahaRERA, including Shri Shri Enclaves. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Shri Shri Enclaves is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shri Shri Enclaves?

The registered promoter entity is Balkrishna Bhaskar Sawant, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shri Shri Enclaves?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shri Shri Enclaves?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shri Shri Enclaves?

The professionals named in the filing: Architect: Rupesh N Tawate; Engineer: Rupesh N Tawate; Chartered Accountant: Sagar G Teli. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shri Shri Enclaves?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shri Shri Enclaves. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shri Shri Enclaves to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.