Registration lapsed No litigation declared Residential / Group Housing project

SHRI RANDAL HEIGHTS-I

By SHRI RANDAL INFRA

RG-MH-04060 · RERA P50500034089 · Last updated on MahaRERA portal: 12 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
14 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

SHRI RANDAL HEIGHTS-I is a Residential / Group Housing project by SHRI RANDAL INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500034089 on 24 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 16 of the 30 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRI RANDAL HEIGHTS-I
  • TypeResidential / Group Housing
  • Location
    • WARDHA ROAD
    • BEHIND HOTEL RADISSON
    • NARENDRA NAGAR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440015
  • Pincode440015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500034089
  • ReraGenie IDRG-MH-04060

Builder

  • NameSHRI RANDAL INFRA
  • Entity typeOthers
  • Named personRAJESH ASHOK DAWDA

Key dates

10 months past promisethis monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

53%16 of 30 units booked
81.9%Work done, per cost certificate

Figures as on 12 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRI RANDAL HEIGHTS-INA161530030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHRI RANDAL HEIGHTS-I: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered14
Open Space19

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,159 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025
LandownerVillageDistrict
SMT GEETA DINKARRAO BORKUTENagpur (M Corp.)Nagpur
MISS TRUPTI DINKARRAO BORKUTENagpur (M Corp.)Nagpur
MISS BHAKTI DINKARRAO BORKUTENagpur (M Corp.)Nagpur
RISHI DINKARRAO BORKUTENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust (NIT)
Permissible FSI4995.27
Proposed, not sanctioned4,995 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTWAL NAGAR, NAGPUR
Estimated costRs 11.99 cr
Cost incurredRs 9.82 cr
Work done81.91%
BuildingWingEstimatedIncurred
SHRI RANDAL HEIGHTS-INARs 11.99 crRs 9.82 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATYENDRA GUPTA
EngineerAAJ ENGINEERS AND CONSULTANTS PRIVATE LIMITED
EngineerSATYENDRA GUPTA
Chartered AccountantBPSD AND ASSOCIATES
Chartered AccountantA M Dabke & Associates
PartnerRole in project
SHRI RANDAL INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA FORM 1 QUARTER ENDING 30-09-2025.pdf12 Jan 2026
Withdrawal Update Form 1File: RERA FORM 1 till 05-12-2025.pdf12 Jan 2026
Withdrawal Update Form 1File: RERA FORM 1 till 05-12-2025.pdf12 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2 QUARTER ENDED 30-09-2025.pdf12 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2 Till Sep-25.pdf12 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2 Till Sep-25.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 Sep-25.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 till 5 Dec-25.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 till 5 Dec-25.pdf12 Jan 2026
Withdrawal Update Form 1File: RERA FORM 1 FOR THE QUARTER ENDED JUNE-2025.pdf9 Jan 2026
Withdrawal Update Form 2File: RERA FORM 2 QUARTER ENDED 30-09-2025.pdf9 Jan 2026
Withdrawal Update Form 3File: Form 3 Sep-25.pdf9 Jan 2026
Withdrawal Update Form 1File: RERA FORM 1 FOR THE QUARTER ENDED JUNE-2025.pdf25 Aug 2025
Withdrawal Update Form 2File: RERA FORM 2 FOR THE QUARTER ENDED JUNE-2025.pdf25 Aug 2025
Withdrawal Update Form 3File: RERA FORM 3 FOR THE QUARTER ENDED JUNE-2025.pdf25 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 QUARTER 31-03-2025.pdf28 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 QUARTER 31-03-2025.pdf28 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 QUARTER 31-03-2025.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold of Mar-2025.pdf28 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A FY 2024-2025.pdf28 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 QUARTER ENDED DEC-2024.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 FOR THE QUARTER END DEC-2024_compressed.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 QUARTER ENDED DEC-2024.pdf7 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A Declaration about RERA designated Bank Account for Real Estate Projects.pdf29 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B OPENING OF RERA DESIGNATED BANK ACCOUNTS.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 ARCHITECHS CERTIFICATE 30 June 2024.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 ARCHITECTS CERTIFICATE 30 Sept 2024.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFICATE 30 June 2024.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CA CERTIFICATE 30 Sep 2024.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 ENGINEER CERTIFICATE 30 June 2024.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 ENGINEER CERTIFICATE 30 Sep 2024.pdf23 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A QUALITY ASSURANCE 31 March 2024.pdf23 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 ANNUAL REPORTS 31 March 2024.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 mar 24.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shri Randal heights.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH-2024 (1)_compressed.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory .pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 december New estimated cost.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Dec-23 .pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate for Dec -23.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory for Dec -23.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December -23.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-22.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-9-22.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-22.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-23.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-23.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2023.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-23.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-23 new.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-23.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-22.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-22.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-22.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2023.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2a 2023.pdf25 Nov 2023
Disclosure of sold/ booked inventoryFile: CR 29 sold inventory and unsold inventory.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 June-22.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 Sep-22.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 Dec-22.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 Mar-23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 June-23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Randal Form 3 sep-23.pdf25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023.pdf25 Nov 2023
Copy of the legal title reportFile: RANDAL INFRA-TITLE COVERING LETTER.pdf15 Mar 2022
Copy of the legal title reportFile: BORKUTE-RANDAL-TITLE REPORT-CHALLAN.pdf15 Mar 2022
Copy of the legal title reportFile: BORKUTE-RANDAL-TITLE REPORT-FLOW OF TITLE-compressed.pdf15 Mar 2022
PAN CardFile: RANDAL INFRA-PAN.pdf14 Mar 2022
Layout approvalFile: BUILDING PLAN-1 (4) (1).pdf10 Mar 2022
Building plan approvalFile: BUILDING PLAN-1 (4) (1).pdf10 Mar 2022
Building plan approvalFile: BUILDING PLAN-2-1.pdf10 Mar 2022
Copy of Layout Approval (in case of layout)File: BUILDING PLAN-1 (4) (1).pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN-1 (4) (1).pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN-2-1.pdf10 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT.pdf10 Mar 2022
Declaration in FORM BFile: RANDAL-FORM B_compressed.pdf10 Mar 2022

How this compares with Nagpur

53%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRI RANDAL HEIGHTS-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND HOTEL RADISSON, NARENDRA NAGAR2,800+ in Nagpur

2 kmSHRI RANDAL HEIGHTS-ICompleted 32Lapsed / revoked 12Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: SHRI RANDAL INFRA

SHRI RANDAL INFRA has 1 registration on MahaRERA, including SHRI RANDAL HEIGHTS-I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that SHRI RANDAL HEIGHTS-I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHRI RANDAL HEIGHTS-I is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI RANDAL HEIGHTS-I?

The registered promoter entity is SHRI RANDAL INFRA, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI RANDAL HEIGHTS-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRI RANDAL HEIGHTS-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI RANDAL HEIGHTS-I?

The professionals named in the filing: Architect: SATYENDRA GUPTA; Engineer: AAJ ENGINEERS AND CONSULTANTS PRIVATE LIMITED; Engineer: SATYENDRA GUPTA; Chartered Accountant: BPSD AND ASSOCIATES; Chartered Accountant: A M Dabke & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI RANDAL HEIGHTS-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI RANDAL HEIGHTS-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI RANDAL HEIGHTS-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.