Home / Browse projects / Pune, Maharashtra / SHRI LAXMI BHAGYODAY SANKUL
SHRI LAXMI BHAGYODAY SANKUL
RG-MH-04969 · RERA P52100021507 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 43 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHRI LAXMI BHAGYODAY SANKUL is a Others project by VINAY VINAYAK BHALERAO in Pune, Maharashtra, registered with MahaRERA as P52100021507 on 5 Jul 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 43 months from the original filing. 1 of the 23 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSHRI LAXMI BHAGYODAY SANKUL
- TypeOthers
- Location
- AMBEGAON
- PUNE
- AMBEGAON Bk
- Haveli
- 411046
- Pincode411046
- RERA no.P52100021507
- ReraGenie IDRG-MH-04969
Builder
- NameVINAY VINAYAK BHALERAO
- Entity typeIndividual
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Jul 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 May 2023)
- Buildings1 building record
- Documents filed146 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHRI LAXMI BHAGYODAY SANKUL | NA | 7 | 6 | 19 | 4 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 80%.
SHRI LAXMI BHAGYODAY SANKUL: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VINAY VINAYAK BHALERAO | Peth | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHRI LAXMI BHAGYODAY SANKUL | NA | Rs 6.69 cr | Rs 3.18 cr |
| - | NA | Rs 94.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR SUNIL D BHAMARE |
| Engineer | SUHAS G JOSHI |
| Engineer | V.V. Bhalerao & Associates |
| Chartered Accountant | MR MADHAV R MATE |
| Chartered Accountant | ASHUTOSH MATE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| VINAY VINAYAK BHALERAO | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs there was covid pandemci and there was shoratge of material and labour
Reason as filed by the promoterThe project is impacted by financial constraints, and there is a shortage of labor required to complete the work.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed146
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect certificate 1st qtr 2026-2027 (2).pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Architect certificate 1st qtr 2026-2027 (2).pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Engineer certificate Form 2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Engineer certificate Form 2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate March 2026 .pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers certificate March 2026 .pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: F3 (2).pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf | 27 Feb 2026 |
| Form 5 (FY 2019-2020)File: Form 5_FY 2019-20.pdf | 20 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf | 20 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf | 20 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form 5FY 2020-21.pdf | 20 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24_25.pdf | 20 Feb 2026 |
| Form 2A (FY 2019-2020)File: 2019-2020-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2020-2021)File: 2020-2021-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2021-2022)File: 2021-2022-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2022-2023)File: 2022-2023-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2023-2024)File: 2023-2024-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2024-2025)File: 2024-2025-Form 2 A.pdf | 27 Dec 2025 |
| Form 2A (FY 2024-2025)File: 2024-2025-Form 2 A.pdf | 27 Dec 2025 |
| Form 1File: Architect Certificate 30-06-2025.pdf | 8 Nov 2025 |
| Form 2File: Engineer certificate 30-06-2025.pdf | 8 Nov 2025 |
| Form 3File: RERA Certificate Q-1.pdf | 8 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory sold unsold 30062025.pdf | 8 Nov 2025 |
| Form 1File: Ar Certificate 30-09-25.pdf | 8 Nov 2025 |
| Form 2File: Er Certificate 30-09-25.pdf | 8 Nov 2025 |
| Form 3File: CA Certificate 30 Sept-2025.pdf | 8 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory sold unsold 30-09-2025.pdf | 8 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March-2025.pdf | 21 Apr 2025 |
| Certificates of CA (Form 3)File: C A CERTIFICATE 4TH QTR.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31-03-2025.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold Unsold format 31032025.pdf | 21 Apr 2025 |
| Other - TechnicalFile: Engineers certificate for Quality Assurance.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24.pdf | 21 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3_Dec 24.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure_Dec 24.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1- Sep 2024.pdf | 23 Oct 2024 |
| Certificates of CA (Form 3)File: From 3- Sep 2024.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2- Sep 2024.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory-Sep 24.pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A- Sep 2024.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 18-7-24.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERIFICATE FROM (2) JULY 24_20240717_0001.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE FROM (2)_20240717_0001.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY JULY 2024_20240717_0001.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: From -3 CA Certificate 30 JUNE 2024.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: CA Cartificate from 3.pdf | 29 Apr 2024 |
| Certificates of CA (Form 3)File: CA cartificate ( From -3).pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31 MARCH 2024.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FROM 2(1) UP TO 31 MARCH 2024.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE FOR QUALITY ASSUARANCE 31 MARCH 2024.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY 31 MARCH 2024.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 10-10-23.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 31-DEC-2024.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CARTIFICATE FROM (2) SEPTEMBER 2023.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FROM 2(1) UP TO 31 DEC 23.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CERTIFICATE FOR QUALITY ASSUARANCE 30 SEPTEMBER 2023.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE FOR QUALITY ASSUARANCE DECEMBER 2023.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY SOLD UNSOLD 30 SEPTEMBER 2023.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY SOLD UNSOLD FORMAT 311223.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS CA FROM 5 (UT) 2022 -23.pdf | 24 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Architect Certificate JUNE 2023_20230713_0001.pdf | 15 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 30th June 2023_20230715_0001.pdf | 15 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate 31ST March 2023_20230715_0002.pdf | 15 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 C A Certificate JUNE 2023_20230713_0001.pdf | 15 Jul 2023 |
| PAN CardFile: Vinay Pan card.pdf | 5 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 1-APRIL 2023.pdf | 5 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE 31-MARCH 30-2023.pdf | 5 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE JUNE 26TH 2023.pdf | 5 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD-BOOKED INVENTORY MARCH 31-2023.pdf | 5 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD JUNE 30TH 2023.pdf | 5 Jul 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE FROM 3 31TH MARCH 2023.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS FROM 5 CA CERTIFICATE 12-4-2023.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNUAL REPORT ON STATEMENT OF ACCOUNTS FROM 5 CA CERTIFICATE 12-4-2023.pdf | 14 Apr 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MEGH MALHAR | 516 A1 A2 NARAYAN PETH PUNE 411030 | 19 | Completed | Oct 2013 | Oct 2013 |
| DARSHAN | 1043-44 SADASHIV PETH PUNE 411030 | 18 | Completed | Apr 2007 | Apr 2007 |
| SHAKUNTALA | 211 SADASHIV PETH PUNE 411030 | 10 | Completed | Oct 1999 | Oct 1999 |
| GANESH CHANDRA | 1697 SADASHIV PETH PUNE 411030 | 16 | Completed | Apr 1998 | Apr 1998 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 146 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHRI LAXMI BHAGYODAY SANKUL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: VINAY VINAYAK BHALERAO
VINAY VINAYAK BHALERAO has 1 registration on MahaRERA, including SHRI LAXMI BHAGYODAY SANKUL. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHRI LAXMI BHAGYODAY SANKUL is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHRI LAXMI BHAGYODAY SANKUL?
The registered promoter entity is VINAY VINAYAK BHALERAO, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHRI LAXMI BHAGYODAY SANKUL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHRI LAXMI BHAGYODAY SANKUL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHRI LAXMI BHAGYODAY SANKUL?
The professionals named in the filing: Architect: MR SUNIL D BHAMARE; Engineer: SUHAS G JOSHI; Engineer: V.V. Bhalerao & Associates; Chartered Accountant: MR MADHAV R MATE; Chartered Accountant: ASHUTOSH MATE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRI LAXMI BHAGYODAY SANKUL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback