ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Shri Icon

Registered No litigation declared Residential / Group Housing project

Shri Icon

By Shri Samarth Buildtech

RG-MH-83484 · RERA P52100046579 · Last updated on MahaRERA portal: 4 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
161 of 183Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

Shri Icon is a Residential / Group Housing project by Shri Samarth Buildtech in Pune, Maharashtra, registered with MahaRERA as P52100046579 on 19 Aug 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 22 of the 183 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameShri Icon
  • TypeResidential / Group Housing
  • Location
    • Moshi
    • Pune
    • Haveli
    • 412105
  • Pincode412105
  • RERA no.P52100046579
  • ReraGenie IDRG-MH-83484

Builder

  • NameShri Samarth Buildtech
  • Entity typePartnership
  • PartnersJitendra Bapurao Khupse, Rajendra Appa Jadhav

Key dates

this monthRegisteredAug 2022First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed160 files

Current status

12%22 of 183 units booked
60.0%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WIngA wing 1312672996
B WingB wing131187087

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A WIng · wing A wing 69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
B Wing · wing B wing60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Closed/Covered200
Open Space134
BuildingClosed/CoveredOpen SpaceTotal
A WIng A wing8465149
B Wing B wing11669185

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,383 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Smt Mangal Himmat SasteMoshiPune
Mr Kishor Himmat SasteMoshiPune
Mr Dushant Himmat SasteMoshiPune
Mrs Archana Tushar DeshmukhMoshiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI13155.77
Proposed, not sanctioned13,153 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPOOJA HEIGHTS PURNANAGAR CHIKHALI CHINCHWAD PUNE 411019PLPOT NO 122/5
Estimated costRs 26.23 cr
Cost incurredRs 15.73 cr
Work done59.98%
BuildingWingEstimatedIncurred
A WIngA wing Rs 12.06 crRs 8.47 cr
B WingB wingRs 9.96 crRs 6.91 cr
-NARs 4.21 crRs 35.75 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil and Bugade Associates
EngineerAbhijit Shinde
Chartered AccountantMR VARAD S KULKARNI
Chartered AccountantNipun Bhandari
PartnerRole in project
Shri Samarth Buildtech-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025470Dec 2024 → Dec 2026

Reason as filed by the promoterDue to unavailability of material and laborers on time and Also due to heavy rains, large amount of water was accumulated at the location of the project hence, the promoter was unable to complete the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf4 Sep 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Sep 2026
Withdrawal Update Form 3File: Form 3 (2).pdf4 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Aug 2026
Withdrawal Update Form 3File: FORM 3 fINAL.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - 2026-2027.pdf20 Aug 2026
Withdrawal Update Form 1File: 14 - Form1 Architect Certifcate 31-12-2025.pdf8 Apr 2026
Withdrawal Update Form 2File: 14 - FORM 2 - 31-12-2025.pdf8 Apr 2026
Withdrawal Update Form 3File: 14 - Form 3 31-12-2025 (2).pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1-30-06-2025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 - 30-09-2025.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2 - 30-06-2025.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2 - 30_09_2025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 30-06-2025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 30-09-2025.pdf10 Feb 2026
Form 1File: Form1.pdf7 Jul 2025
Form 2File: FORM 2.pdf7 Jul 2025
Form 3File: Form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventroy.pdf7 Jul 2025
Form 2A (FY 2024-2025)File: 13 Form 2A - 2024-2025.pdf7 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Verification For RERA No - P52100046579.pdf4 Apr 2025
Other - TechnicalFile: Commencement Certificate Verification For RERA No - P52100046579.pdf4 Apr 2025
Layout approvalFile: Shri Icon - Layout Plan-1.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-2.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-3.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-4.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-5.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-6.pdf2 Apr 2025
Building plan approvalFile: Shri Icon - Plan-7.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Shri Icon - Layout Plan-1.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-2.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-3.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-4.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-5.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-6.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Shri Icon - Plan-7.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: 11 - Rewise Sold Inventory 31-12-24.pdf1 Apr 2025
Layout approvalFile: Shri Iocn - Recent Plan Copy_2_11zon.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Shri Iocn - Recent Plan Copy_2_11zon.pdf29 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commrencement Certi 28 02 25.pdf29 Mar 2025
Declaration about Commencement CertificateFile: Declaration About Comm Certificate.pdf29 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 12 Form 2A - 2022-2023.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 11 Form 2A - 2023-2024.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: Shri Icon final Sold unsold Dec 24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 31-12-24 SHRI_compressed.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 30-9-24 SHRI_compressed.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Shri Samarth Buildtech 22-23 - Form - 5.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Shri Samarth Buildtech 23-24 - Form - 5.pdf24 Jan 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate (4).pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: 10 sold Inventory 31-12-24.pdf22 Jan 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate (4).pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form1 Architect Certifcate 19-06-2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form1 Architect Certifcate 31-12-2024 done.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form1 Architect Certifcate 29-12-2023.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form1 Architect Certifcate 06-10-23 uploade d.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form1 Architect Certifcate 05-07-2023.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form1 Architect Certifcate 24-03-2023.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 Architect Certifcate 30-12-2022.PDF21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form1 Architect Certifcate 29-09-2022 uploaded.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 30-6-23_compressed.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 30-9-24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 30-6-24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 31-3-24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 31-12-2023.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 30-9-23.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 31-3-23(1)_compressed.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form3 31_12_2022.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 - 30_09_2022.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 06-10-2023 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 10-10-2024 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 19-06-2024 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 07-03-2024 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 29-12-2023 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 05-07-2023 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 25-03-2023 shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 30-09-2022 sold unsold shri icon.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: 30-12-2022 sold unsold shri icon.pdf21 Jan 2025
Proforma of Agreement for saleFile: AFS SHRI ICON FINAL.pdf21 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Annexure A - Jitendra Bapurao Khupse .pdf21 Jan 2025

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shri Icon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: Shri Samarth Buildtech

Shri Samarth Buildtech has 1 registration on MahaRERA, including Shri Icon. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shri Icon is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shri Icon?

The registered promoter entity is Shri Samarth Buildtech, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shri Icon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shri Icon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shri Icon?

The professionals named in the filing: Architect: Patil and Bugade Associates; Engineer: Abhijit Shinde; Chartered Accountant: MR VARAD S KULKARNI; Chartered Accountant: Nipun Bhandari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shri Icon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shri Icon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shri Icon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.