Registered No litigation declared Residential / Group Housing project

SHREESHA ICON

By IMPERIAL BUILDCON

RG-MH-31063 · RERA P52100079397 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
66 of 154Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SHREESHA ICON is a Residential / Group Housing project by IMPERIAL BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100079397 on 3 Mar 2025. Possession is promised by 30 Jul 2029. 88 of the 154 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREESHA ICON
  • TypeResidential / Group Housing
  • Location
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079397
  • ReraGenie IDRG-MH-31063

Builder

  • NameIMPERIAL BUILDCON
  • Entity typePartnership
  • PartnersSURAJ ASHOK DARSHALE, AKASH BABAN JAID, VISHAL SAMBHAJI KARPE, ROHIT SHANTARAM PAWAR, SANTOSH SAMBHAJI LOKHANDE
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredMar 2025PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Mar 2025
  • Promised completion30 Jul 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

57%88 of 154 units booked
30.9%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREESHA ICON BUILDINGNA16141540154

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

SHREESHA ICON BUILDING: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed252

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots252
Closed/Covered252

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,897 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025
LandownerVillageDistrict
HANUMANT CHABHU PAWARPimpri Chinchawad (M Corp.)Pune
VACHHALABAI CHABU PAWARPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI13713.39
Proposed, not sanctioned13,713 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHOP NO 1 P, GK PALACIO S NO 111, BORADEWADI, DEHU ALANDI ROAD MOSHI PIMPRI CHINCHWAD DIST PUNE 412105
Estimated costRs 37.80 cr
Cost incurredRs 11.70 cr
Work done30.95%
BuildingWingEstimatedIncurred
SHREESHA ICON BUILDINGNARs 34.02 crRs 10.53 cr
-NARs 3.78 crRs 1.17 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectI.P. ASSOCIATES
EngineerSHARAD DHANAVE ENGINEERING
EngineerSANKET ANIL GODSE
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
Chartered AccountantNavdeep Jindal & Assocaites
PartnerRole in project
IMPERIAL BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jul 2029

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2 sign.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26 Sign.pdf13 Jul 2026
Layout approvalFile: 1 Layout.pdf9 May 2026
Building plan approvalFile: 2-5.pdf9 May 2026
Withdrawal Update Form 1File: Form 1Mar_26.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 Sing.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 Sing.pdf7 May 2026
Layout approvalFile: Layout.pdf4 Mar 2026
Building plan approvalFile: Building Plan 1.pdf4 Mar 2026
Building plan approvalFile: Building Plan 2.pdf4 Mar 2026
Building plan approvalFile: Building Plan 3.pdf4 Mar 2026
Building plan approvalFile: Building Plan 4.pdf4 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Final.pdf8 Nov 2025
Layout approvalFile: Layout.pdf29 Oct 2025
Building plan approvalFile: Building Plan 1.pdf29 Oct 2025
Building plan approvalFile: Building Plan 2.pdf29 Oct 2025
Building plan approvalFile: Building Plan 3.pdf29 Oct 2025
Building plan approvalFile: Building Plan 4.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1 Final.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 Final.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 Final.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf29 Sep 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: Form 2.pdf18 Jul 2025
Form 3File: CA FORM promoter sign.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Cir (1).pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Cir (1).pdf20 Apr 2025
Layout approvalFile: Sanction Plan.pdf12 Mar 2025
Building plan approvalFile: Building Plan 1.pdf12 Mar 2025
Building plan approvalFile: Building Plan 2.pdf12 Mar 2025
Building plan approvalFile: Building Plan 3.pdf12 Mar 2025
Building plan approvalFile: Building Plan 4.pdf12 Mar 2025
Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf12 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf4 Feb 2025
Copy of the legal title reportFile: Legal Title.pdf9 Jan 2025
Other - FinanceFile: No Sale Declaration.pdf2 Jan 2025
Declaration in FORM BFile: Form B Promoter Final.pdf17 Dec 2024
Other - TechnicalFile: Order 50 NEW.pdf17 Dec 2024
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf17 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report.pdf16 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclouser Of Secutred And LO.pdf16 Dec 2024
Layout approvalFile: Layout_compressed.pdf13 Dec 2024
Building plan approvalFile: Building_compressed.pdf13 Dec 2024
Building plan approvalFile: Building 1_compressed.pdf13 Dec 2024
Building plan approvalFile: Building 2_compressed.pdf13 Dec 2024
Building plan approvalFile: Building 3_compressed.pdf13 Dec 2024
PAN CardFile: PAN Card.pdf13 Dec 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf13 Dec 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbranca.pdf13 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf13 Dec 2024
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final 21-02-2025.pdf13 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement_compressed.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building_compressed.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 1_compressed.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 2_compressed.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 3_compressed.pdf13 Dec 2024
Other - LegalFile: No Sale Declaration.pdf13 Dec 2024
Other - LegalFile: Sale Deed_compressed_11zon.pdf13 Dec 2024
Other - LegalFile: डुडुळगाव_217_Satbara.pdf13 Dec 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf13 Dec 2024
CERSAI detailsFile: CERSAI.pdf13 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf13 Dec 2024
Deviation Report with respect to Allotment letterFile: No deviation allotment letter.pdf13 Dec 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf13 Dec 2024
Details of encumbrances concerned to LegalFile: Legal Encumbranca.pdf13 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration Akash.pdf13 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration Rohit.pdf13 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration Santosh.pdf13 Dec 2024

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREESHA ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmSHREESHA ICONCompleted 51Lapsed / revoked 25Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: IMPERIAL BUILDCON

IMPERIAL BUILDCON has 3 registrations on MahaRERA, including LA IMPERIA and Imperial Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHREESHA ICON is delayed beyond 30 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREESHA ICON?

The registered promoter entity is IMPERIAL BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREESHA ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREESHA ICON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREESHA ICON?

The professionals named in the filing: Architect: I.P. ASSOCIATES; Engineer: SHARAD DHANAVE ENGINEERING; Engineer: SANKET ANIL GODSE; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES; Chartered Accountant: Navdeep Jindal & Assocaites. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREESHA ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREESHA ICON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREESHA ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.