Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

SHREEJA RESIDENCY is a Residential / Group Housing project by SWAROOP CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100048971 on 24 Jan 2023. The registration is recorded completed; possession was promised by 24 Jun 2024.

At a glance

Project

  • NameSHREEJA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • VIDYA VIHAR COLONY ROAD
    • TALEGAON DABHADE
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • RERA no.P52100048971
  • ReraGenie IDRG-MH-72850

Builder

  • NameSWAROOP CONSTRUCTION
  • Entity typePartnership
  • PartnersSACHIN NANDKUMAR BHEGADE, CHETAN DNYANESHWAR BHEGADE, SAGAR CHANDRAKANT KAKADE
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion24 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEJA RESIDENCYNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

SHREEJA RESIDENCY: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area488 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1322.39
Proposed, not sanctioned1,322 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON DABHADE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY B PATIL
EngineerAJAY B PATIL
Chartered AccountantSWANAND V AGASHE
PartnerRole in project
SWAROOP CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2024

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: shreeja residency occupany certificate.pdf22 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: form4 shreeja.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shreeja Architect certificate_page 22.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shreeja engineering certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: shreeja inventry.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 shreeja_page 22.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shreeja Form 5 CA 2022 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shreeja Architech certificae form 1 Q 1.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shreeja Architech certificae form 1 Q 2.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shreeja Architech certificae form 1 Q 3.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shreeja enginnering certificate form 2 Q1.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shreeja enginnering certificate form 2 Q2.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shreeja enginnering certificate form 2 Q3.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shreeja FORM 3 Q 1.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shreeja FORM 3 Q 2.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shreeja FORM 3 Q 3.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q 2 SHREEJI.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q 3 SHREEJI.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: Shreeja Residency Deatils Of Encumbrance 01.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: Shreeja Residency Deatils Of Encumbrance 01.pdf17 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture-A swaroop.pdf2 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 22_shreeja.pdf28 Dec 2022
Copy of the legal title reportFile: FORMAT A -LEGAL TITLE REPORT (SHREEJA).pdf22 Nov 2022
Details of encumbrances concerned to FinanceFile: detail of encumbrances-shreeja.pdf22 Nov 2022
Details of encumbrances concerned to LegalFile: detail of encumbrances-shreeja.pdf22 Nov 2022
Proforma of Allotment letterFile: allatment letter-shreeja residency_compressed.pdf22 Nov 2022
Proforma of Allotment letterFile: annexture-a shreeja.pdf22 Nov 2022
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf22 Nov 2022
Proforma of Agreement for saleFile: annexture-a shreeja.pdf22 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf22 Nov 2022
Other - LegalFile: notery shreeeja residency.pdf22 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A Shreeja .pdf13 Oct 2022
Deviation Report with respect to Allotment letterFile: DEVITION REPORT OF ALLOTMENT LETTER.pdf13 Oct 2022
Deviation Report with respect to model copy of AgreementFile: deviation report agreement (1).pdf13 Oct 2022
Building plan approvalFile: new plan.pdf1 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: new plan.pdf1 Sep 2022
CERSAI detailsFile: CERCAI FINAL.pdf1 Sep 2022
Declaration about Commencement CertificateFile: FORM D FINAL.PDF10 Aug 2022
Layout approvalFile: layout.pdf5 Aug 2022
PAN CardFile: pan.pdf5 Aug 2022
Copy of Layout Approval (in case of layout)File: layout.pdf5 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: commencesment.pdf5 Aug 2022
Declaration in FORM BFile: DocScanner 5 Aug 2022 19-12.pdf5 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects final.pdf5 Aug 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON DABHADE13,700+ in Pune

Builder: SWAROOP CONSTRUCTION

SWAROOP CONSTRUCTION has 6 registrations on MahaRERA, including SWAROOP ORCHID and SHREE GANESHA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHREEJA RESIDENCY is delayed beyond 24 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJA RESIDENCY?

The registered promoter entity is SWAROOP CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJA RESIDENCY?

The professionals named in the filing: Architect: AJAY B PATIL; Engineer: AJAY B PATIL; Chartered Accountant: SWANAND V AGASHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.