Home / Browse projects / Pune, Maharashtra / SHREE SWAMI KRUPA SADAN
SHREE SWAMI KRUPA SADAN
RG-MH-19253 · RERA P52100078335 · Last updated on MahaRERA portal: 20 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SWAMI KRUPA SADAN is a Others project by A S Associates in Pune, Maharashtra, registered with MahaRERA as P52100078335 on 4 Dec 2024. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameSHREE SWAMI KRUPA SADAN
- TypeOthers
- Location
- CTS NO 49 & 50
- 1
- SHUKRWARA PETH
- Pune (M Corp.)
- Pune City
- Pune
- 411042
- Pincode411042
- RERA no.P52100078335
- ReraGenie IDRG-MH-19253
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Dec 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed28 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
A: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership42
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VINAYAK SHANKARRAO GHORPADE (DEATH) | Pune (M Corp.) | Pune |
| PUNAM SACHIN KUDALE | Pune (CB) | Pune |
| GANESH GANPATRAO GHORPADE (DEATH) | Pune (M Corp.) | Pune |
| SHOBHA GANESH GHORPADE (DEATH) | Pune (M Corp.) | Pune |
| GANESH SHANKARRAO GHORPADE (DEATH) | Pune (M Corp.) | Pune |
| SHARDA VINAYAK SHANKARRAO GHORPADE (DEATH) | Pune (M Corp.) | Pune |
| SUPRIYA MAHARUDRA GHORPADE | Pune (M Corp.) | Pune |
| SUNIL GANPAT GHORPADE | Pune (M Corp.) | Pune |
| SONALI UMESH KUDALE | Pune (M Corp.) | Pune |
| SHRIKRISHNA GANESH GHORPADE | Pune (M Corp.) | Pune |
| SHERWARI SANTOSH GHORPADE | Pune (M Corp.) | Pune |
| SAVITA CHINTAMANI GHORPADE | Pune (M Corp.) | Pune |
| SARITA CHANDRAKANT GHORPADE | Pune (M Corp.) | Pune |
| RUPAJANLI GAURAKSH GHORPADE | Pune (M Corp.) | Pune |
| RENUKASUNIL BHUJBAL | Pune (M Corp.) | Pune |
| RAVINDRA VINAYAK GHORPADE | Pune (M Corp.) | Pune |
| SARIKA YOGESH POD | Pune (M Corp.) | Pune |
| NEHA RAVINDRA GHORPADE | Pune (M Corp.) | Pune |
| MANISHA KEDAR GHORPADE | Pune (M Corp.) | Pune |
| MANISHA GANPAT GHORPADE | Pune (M Corp.) | Pune |
| MAHARUDRA HERAMB GHORPADE | Pune (M Corp.) | Pune |
| KUSUM BHALCHANDRA GHORPADE | Pune (M Corp.) | Pune |
| KIRTI SHRIKRISHNA GHORPADE | Pune (M Corp.) | Pune |
| KEDAR JAYANT GHORPADE | Pune (M Corp.) | Pune |
| KALINDI SUNIL GHORPADE | Pune (M Corp.) | Pune |
| JYOTI SANTOSH GHORPADE | Pune (M Corp.) | Pune |
| JAYANT SHANKARRAO GHORPADE | Pune (M Corp.) | Pune |
| HERAMB SHANKARRAO GHORPADE | Pune (M Corp.) | Pune |
| HEMLATA RAVINDRA GHORPADE | Pune (M Corp.) | Pune |
| HARSH CHANDRAKANT GHORPADE | Pune (M Corp.) | Pune |
| GEETA HERAMB GHORPADE | Pune (M Corp.) | Pune |
| GAURI VIRENDRA KULANGE | Pune (M Corp.) | Pune |
| GAURAKSH CHINTAMANI GHORPADE | Pune (M Corp.) | Pune |
| CHINTAMANI SHANKARRAO GHORPADE | Pune (M Corp.) | Pune |
| CHAYYA JAYANT GHORPADE | Pune (M Corp.) | Pune |
| CHANDRAKANT BHALCHANDRA GHORPADE | Pune (M Corp.) | Pune |
| BHALCHANDRA SHANKARRAO GHORPADE | Pune (M Corp.) | Pune |
| ANITA SHYAM BHIJBAL | Pune (M Corp.) | Pune |
| SANTOSH GANESH GHORPADE | Pune (M Corp.) | Pune |
| VIJAYA RAVINDRA GHORPADE | Pune (M Corp.) | Pune |
| VANITA ANAND PASALKAR | Pune (M Corp.) | Pune |
| SWATI SOMDATTA GIRME | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANISH G AGRAWAL |
| Engineer | S V & Associates |
| Chartered Accountant | Sachin K. Mishra & Co. |
| Partner | Role in project |
|---|---|
| A S Associates | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed28
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: No encumbrances concerned to Finance.pdf | 20 Nov 2024 |
| Other - LegalFile: Clarification Letter - Shree Swami Krupa Sadan.pdf | 20 Nov 2024 |
| Details of encumbrances concerned to LegalFile: No encumbrances concerned to Finance.pdf | 20 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA.pdf | 17 Oct 2024 |
| Declaration about Commencement CertificateFile: From D.pdf | 17 Oct 2024 |
| Other - TechnicalFile: One Project One Registartion.pdf | 17 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviations Report for AFS.pdf | 16 Oct 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale_Final.pdf | 16 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Intrest.pdf | 16 Oct 2024 |
| Copy of the legal title reportFile: Legal Title Report_11 July 24.pdf | 18 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances_page-0001.pdf | 8 May 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances_page-0001.pdf | 8 May 2024 |
| Proforma of Allotment letterFile: Model_Allotment Letter_with annexure.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 49 50 Shukrwar Peth_ARCH CERTIFICATE.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_page-0001.pdf | 13 Apr 2024 |
| Building plan approvalFile: 50.pdf | 16 Mar 2024 |
| Building plan approvalFile: 49.pdf | 16 Mar 2024 |
| Layout approvalFile: 50.pdf | 16 Mar 2024 |
| PAN CardFile: Pan a s associates .pdf | 16 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 50.pdf | 16 Mar 2024 |
| Declaration in FORM BFile: FORM B.pdf | 16 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 16 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 49.pdf | 16 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 50.pdf | 16 Mar 2024 |
| CERSAI detailsFile: DECLARATION CERSAI_page-0001 (1).pdf | 16 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A_Declaration about Separate Bank Account for real estate projects.pdf | 16 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter_page-0001.pdf | 16 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 28 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHREE SWAMI KRUPA SADAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near 1, SHUKRWARA PETH13,700+ in Pune
Samaira Tower
Prathamesh Constro Realty LLp
Aarambh
Seven Star Properties
ABBAS HEIGHT
ABBAS BUILDERS
Vardhaman Heights
VARDHAMAN DEVELOPERS
VASTU LAXMI
VASTUYOG DEVELOPERS
SONIGARA NEW KALPATARU
SHREE SONIGARA DEVELOPERS LLP
Builder: A S Associates
A S ASSOCIATES has 2 registrations on MahaRERA, including VISHNU KRUPA and SHREE SWAMI KRUPA SADAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREE SWAMI KRUPA SADAN is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SWAMI KRUPA SADAN?
The registered promoter entity is A S Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SWAMI KRUPA SADAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SWAMI KRUPA SADAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SWAMI KRUPA SADAN?
The professionals named in the filing: Architect: MANISH G AGRAWAL; Engineer: S V & Associates; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SWAMI KRUPA SADAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback