Home / Browse projects / Chandrapur, Maharashtra / Shree Saikrupa Layout

Completed No litigation declared Plotted project

Shree Saikrupa Layout

By Shree Gurukrupa Builders And Developers

RG-MH-45241 · RERA P50900054942 · Last updated on MahaRERA portal: 16 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Shree Saikrupa Layout is a Plotted project by Shree Gurukrupa Builders And Developers in Chandrapur, Maharashtra, registered with MahaRERA as P50900054942 on 21 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2025. 0 of the 10 units on this registration are recorded sold or booked.

At a glance

Project

  • NameShree Saikrupa Layout
  • TypePlotted
  • Location
    • Khedmakta
    • Mouza Khedmakta
    • Brahmapuri
    • Chandrapur
    • 441206
  • Pincode441206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50900054942
  • ReraGenie IDRG-MH-45241

Builder

  • NameShree Gurukrupa Builders And Developers
  • Entity typePartnership
  • GSTIN27AEIFS9878Q1ZL
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSarang Dadarao Mendhule, Hussain ABID Karori, Anup Vasantrao Mendhule
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredFeb 2024PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Feb 2024
  • Promised completion31 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed80 files

Current status

0%0 of 10 units booked

Figures as on 16 Sep 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 16 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,896 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024

Approvals and building plan

Sanctioning authoritySub divisional officer, Bramhapuri

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNarayan Bldg, Plot No 436/B, Infront of Central Bank of India, Civil Line, Churhe Bada, Bramhapuri-4

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSarang D Mendhule
ArchitectDesign Coordinates
EngineerLiladhar Kukde
EngineerShivalaya Designs
Chartered AccountantCA Abhinav Welekar
Chartered AccountantAPJ & ASsociates
Chartered AccountantPravin Dhiran & Co.
PartnerRole in project
Shree Gurukrupa Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Sep 2025

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: CC Mail 830.pdf16 Sep 2025
Completion CertificateFile: Clarification Shree Saikrupa Layout.pdf16 Sep 2025
Form 5 (FY 2024-2025)File: Form-5 03-02-2025 Sign.pdf8 Jul 2025
Form 1File: Form-1_30-9-24.pdf1 Jul 2025
Form 2File: Form-2_30-9-24.pdf1 Jul 2025
Form 3File: Form 3_30-09-24.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-9-24.pdf1 Jul 2025
Form 1File: Form-1 31-12-2024 Sai Krupa.pdf1 Jul 2025
Form 2File: Form-2 31-12-2024 Sai krupa.pdf1 Jul 2025
Form 3File: Form 3_ 31-12-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Annexture 29_ 31-12-2024.pdf1 Jul 2025
Form 1File: Form-1 03-02-2025 Sai Krupa.pdf1 Jul 2025
Form 2File: Form-2 03-02-2025 Sai Krupa.pdf1 Jul 2025
Form 3File: Form 3_ 3-2-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Annexture 29_ 31-03-2025.pdf1 Jul 2025
Form 1File: Form-1-31-03-24.pdf26 Jun 2025
Form 3File: Form 3 31-3-24.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 31-3-24.pdf26 Jun 2025
Form 2File: Form-2-31-03-24.pdf26 Jun 2025
Form 1File: Form-1_30-06-24.pdf26 Jun 2025
Form 2File: Form-2_30-06-24.pdf26 Jun 2025
Form 3File: Form 3_30-06-24.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-6-24.pdf26 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 Signed 31-03-2024.pdf30 May 2025
Completion CertificateFile: Completion Certificate Survey no 830.pdf30 May 2025
Building plan approval or NA orderFile: 7_NA Order Survey No 828 836 SDO.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 03-02-2025 Sai Krupa.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 31-12-2024.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 3-2-2024.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 03-02-2025 Sai Krupa.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2024 Sai Krupa.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024 Sai krupa.pdf10 May 2025
Other - TechnicalFile: CC Mail 830.pdf18 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Survey no 830.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gurukrupa june.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-9-24 G.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect_ form 1_31-3-24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect_30-6-24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect_30-9-24.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-3-24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers cert_31-3-24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers cert_30-6-24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers cert_30-9-24.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 31-3-24.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 30-6-24.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 30-9-24.pdf7 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineers quality assurence_31-3-24.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Signed.pdf7 Dec 2024
Copy of the legal title reportFile: 4_search Report.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 Architect Certificate Survey No 830.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 Survey no 830.pdf5 Feb 2024
CERSAI detailsFile: 18_CERSAI Declaration Survey No 830.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 signed.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 16_Disclosure of Intrest (Anup Mendhule).pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 16_Disclosure of interest sarang.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 16_Disclosure of Interest Husain.pdf5 Feb 2024
Other - LegalFile: Partnership Deed.pdf5 Feb 2024
Other - LegalFile: Saledeed Survey No 830.pdf5 Feb 2024
Other - TechnicalFile: 17_Annexture A Declaration Cum Undertaking Survey No 830.pdf5 Feb 2024
Layout approvalFile: 10_Sanction Map of Layout.pdf3 Feb 2024
Building plan approval or NA orderFile: 7_NA Order Survey No 830 SDO.pdf3 Feb 2024
Building plan approval or NA orderFile: 7_NA Order Survey No 830 BPMS.pdf3 Feb 2024
PAN CardFile: PAN.pdf3 Feb 2024
Details of encumbrances concerned to FinanceFile: 5A_Financial Encumbrance Certificate.pdf3 Feb 2024
Details of encumbrances concerned to FinanceFile: 5B_Legal encumbrance.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: 5A_Financial Encumbrance Certificate.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: 5B_Legal encumbrance.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: 10_Sanction Map of Layout.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_NA Order Survey No 830 SDO.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_NA Order Survey No 830 BPMS.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_NA Order Survey No 830 SDO.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_NA Order Survey No 830 BPMS.pdf3 Feb 2024
Declaration about Commencement CertificateFile: 12_Declaration About Commencement Certificate Survey No 830.pdf3 Feb 2024
Declaration in FORM BFile: 6_ FORM B Survey No 830.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 11_Disclosure of Sold Inventory Survey No 830.pdf3 Feb 2024
Proforma of Agreement for saleFile: 9_ATS.pdf3 Feb 2024
Proforma of Allotment letterFile: 8_Proforma of Allotment Letter Survey No 830.pdf3 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 14_Declaration About Seperate Bank Act Survey No 830.pdf3 Feb 2024
Deviation Report with respect to Allotment letterFile: 15_Deviation Report For Allotment Letter.pdf3 Feb 2024
Deviation Report with respect to model copy of AgreementFile: 13_Declaration for Model Form of Agreement.pdf3 Feb 2024

How this compares with Chandrapur

0%of this project is bookeddistrict median 18%
10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is completed

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep Shree Saikrupa Layout on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza Khedmakta220+ in Chandrapur

Builder: Shree Gurukrupa Builders And Developers

Shree Gurukrupa Builders And Developers has 4 registrations on MahaRERA, including Shree Niwas Apartment and Shree Saikrupa Layout. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What are my rights if Shree Saikrupa Layout is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Saikrupa Layout?

The registered promoter entity is Shree Gurukrupa Builders And Developers, a partnership as per the filing. Its GSTIN 27AEIFS9878Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Saikrupa Layout?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Saikrupa Layout?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Saikrupa Layout?

The professionals named in the filing: Architect: Sarang D Mendhule; Architect: Design Coordinates; Engineer: Liladhar Kukde; Engineer: Shivalaya Designs; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: APJ & ASsociates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Saikrupa Layout?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Saikrupa Layout. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Saikrupa Layout to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.