Home / Browse projects / Pune, Maharashtra / Shree Paradise
Shree Paradise
RG-MH-79221 · RERA P52100050527 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Paradise is a Residential / Group Housing project by Sunita Ashutosh Gosavi in Pune, Maharashtra, registered with MahaRERA as P52100050527 on 21 Apr 2023. Possession is promised by 20 Oct 2026. 19 of the 55 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameShree Paradise
- TypeResidential / Group Housing
- Location
- Kiwale
- Mawal
- Kivale
- Pune
- 410505
- Pincode410505
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050527
- ReraGenie IDRG-MH-79221
Builder
- NameSunita Ashutosh Gosavi
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Apr 2023
- Promised completion20 Oct 2026
- Revised completionNone
- Buildings2 building records
- Documents filed88 files
Current status
Figures as on 24 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Paradise Wing A | NA | 3 | 3 | 29 | 0 | 29 |
| Shree Paradise Wing B | NA | 3 | 3 | 26 | 0 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.
Shree Paradise Wing A44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Shree Paradise Wing B44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership15
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sadashiv Parbati Kanase | Kivale | Pune |
| Yogesh Gajanan Ramekar | VADHODA | Jalgaon |
| Nilesh Gajanan Ramekar | VADHODA | Jalgaon |
| Manisha Ashok Kokate | Deodaithan | Ahmednagar |
| Sunit Kalyan Ghadge | Kameri | Satara |
| Pallavi Jaychand Thakur | Pimpri Bk. | Pune |
| Yogesh Ramchandra Waghmare | Pandharwadi | Pune |
| Jitendra Namdev Sabale | Pimpri | Pune |
| Rahul Suresh Dhanawade | Karanje t.parali | Satara |
| Anant Babasaheb Raut | Kamothe | Raigarh |
| Sandeep Sonba Veer | Bhatghar | Satara |
| Geetanjali Ajay Shedage | Dehu Road (CB) | Pune |
| Ramesh shankar Ghanwat | Thane (M Corp.) | Thane |
| Sanket Prakash Ghare | Kalewadi (nv) | Pune |
| Chhaya Prakash Katake | Golegaon | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shree Paradise Wing A | NA | Rs 3.62 cr | Rs 2.30 cr |
| Shree Paradise Wing B | NA | Rs 3.62 cr | Rs 2.30 cr |
| - | NA | Rs 50.00 lakh | Rs 30.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar,Nilesh Saswade |
| Engineer | Mr. Yash Babulal Choundiye |
| Engineer | NAWAJ AND SHANUR ENTERPRISES |
| Engineer | ROHIT SABAJKAR |
| Chartered Accountant | G S DESAI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Sunita Ashutosh Gosavi | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 20 Oct 2026
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect form-1 -31 March 2026.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 SIGNED_11zon.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 31 12 2026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Engineering Certificate 31-12-2025 .pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: rera certificate _ 30 09 2025.pdf | 1 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 Engineering Certificate 30-09-25.pdf | 1 Apr 2026 |
| Withdrawal Update Form 3File: Form-3(signed).pdf | 1 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 30 06 25.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 KIWALE-1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: SUNITA GOSAVI FORM-3.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf | 16 Aug 2025 |
| Form 1File: FORM NO 1.pdf | 16 Aug 2025 |
| Form 2File: FORM-2.pdf | 16 Aug 2025 |
| Form 3File: FORM-3.pdf | 16 Aug 2025 |
| Form 1File: FORM-1.pdf | 10 Jul 2025 |
| Form 2File: FORM 2.pdf | 10 Jul 2025 |
| Form 3File: Form No 3.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 10 Jul 2025 |
| Form 1File: FORM NO 1.pdf | 10 Jul 2025 |
| Form 2File: Form 2 Eng Cert.pdf | 10 Jul 2025 |
| Form 3File: FORM NO -3.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 10 Jul 2025 |
| Form 1File: ARCHITECT FORM NO -1.pdf | 10 Jul 2025 |
| Form 2File: FORM NO 2.pdf | 10 Jul 2025 |
| Form 3File: FORN NO 3.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY SUNITA.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SUNITA.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO-3.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO -3.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORN NO 3.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM NO -1.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 18 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 29 Apr 2024 |
| Other - LegalFile: ANNEXURE - A.pdf | 29 Apr 2024 |
| Other - LegalFile: DECLARATION CUM UNDERTAKING.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 17 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf | 17 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 (2).pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANEEXURE A.pdf | 20 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a (2).pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate revised compressed.pdf | 31 Mar 2023 |
| Layout approvalFile: plan_2.pdf | 28 Mar 2023 |
| Layout approvalFile: plan_3.pdf | 28 Mar 2023 |
| Building plan approvalFile: plan_2.pdf | 28 Mar 2023 |
| Building plan approvalFile: plan_3.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: plan_2.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: plan_3.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: plan_2.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: plan_3.pdf | 28 Mar 2023 |
| Layout approvalFile: plan_1.pdf | 4 Mar 2023 |
| Building plan approvalFile: plan_1.pdf | 4 Mar 2023 |
| PAN CardFile: Pan.pdf | 4 Mar 2023 |
| Copy of the legal title reportFile: Title Final.pdf | 4 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Finance.pdf | 4 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Legal.pdf | 4 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Finance.pdf | 4 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Legal.pdf | 4 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: plan_1.pdf | 4 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: plan_1.pdf | 4 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: final _commencement.pdf | 4 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_PROVISINAL.pdf | 4 Mar 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 4 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Paradise on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mawal13,700+ in Pune
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
First City
Xrbia Developers Ltd
SURAJ EKYUM
SURAJ INFRA
Shankeshwar World
Nitin Chhaganlal Jain
Escape City Ph 1
Gajendra Patil , Pramod Patil , Vinod Pati
YESAI PARK
SIDDHIVINAYAK DEVELOPERS
Escape City Ph 2
Gajendra Patil , Pramod Patil , Vinod Pati
Builder: Sunita Ashutosh Gosavi
Sunita Ashutosh Gosavi has 1 registration on MahaRERA, including Shree Paradise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shree Paradise is delayed beyond 20 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Paradise?
The registered promoter entity is Sunita Ashutosh Gosavi, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Paradise?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Paradise?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Paradise?
The professionals named in the filing: Architect: Ar,Nilesh Saswade; Engineer: Mr. Yash Babulal Choundiye; Engineer: NAWAJ AND SHANUR ENTERPRISES; Engineer: ROHIT SABAJKAR; Chartered Accountant: G S DESAI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Paradise?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback