Registered No litigation declared Residential / Group Housing project

SHREE MURLIDHAR PARK PHASE I

By RAJENDRA MADHUKAR KALE

RG-MH-69540 · RERA P51600050334 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken
  • Rs 8.50 crore secured on the land, in favour of Bank of Maharashtra

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 21 months from the original
19 of 20Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
18 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

SHREE MURLIDHAR PARK PHASE I is a Residential / Group Housing project by RAJENDRA MADHUKAR KALE in Nashik, Maharashtra, registered with MahaRERA as P51600050334 on 5 Apr 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 21 months from the original filing. 38 of the 56 units on this registration are recorded sold or booked, and 19 of 20 construction stages are filed complete.

At a glance

Project

  • NameSHREE MURLIDHAR PARK PHASE I
  • TypeResidential / Group Housing
  • Location
    • STATION ROAD
    • AT POST GHOTI BK
    • Ghoti Bk. (CT)
    • Igatpuri
    • Nashik
    • 422402
  • Pincode422402
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600050334
  • ReraGenie IDRG-MH-69540

Builder

  • NameRAJENDRA MADHUKAR KALE
  • Entity typeIndividual
  • Other registrations2 more →

Key dates

this monthRegisteredApr 2023First promiseMar 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2025)
  • Buildings2 building records
  • Documents filed102 files

Current status

68%38 of 56 units booked
99.6%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE MURLIDHAR PARK PHASE I- WING A AND BWING A8728028
SHREE MURLIDHAR PARK PHASE I- WING A AND BWING B8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SHREE MURLIDHAR PARK PHASE I- WING A AND B · wing WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHREE MURLIDHAR PARK PHASE I- WING A AND B · wing WING B100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes70%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110
BuildingClosed/CoveredTotal
SHREE MURLIDHAR PARK PHASE I- WING A AND B WING A4747
SHREE MURLIDHAR PARK PHASE I- WING A AND B WING B6363

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,276 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBank of Maharashtra
Secured amountRs 8.50 crore
CERSAI search filedYes
Declared on11 Feb 2026

Approvals and building plan

Permissible FSI3729.72
Proposed, not sanctioned3,730 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch8-9 SUYOJIT SANKUL TILAKWADI RD CANADA CORNER NASHIK 422002
Estimated costRs 6.87 cr
Cost incurredRs 6.83 cr
Work done99.56%
BuildingWingEstimatedIncurred
SHREE MURLIDHAR PARK PHASE I- WING A AND BWING ARs 6.67 crRs 6.67 cr
-NARs 20.00 lakhRs 17.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH BAGUL
EngineerSAGAR S SHAH
EngineerAmey Dhalkari
Chartered AccountantPRASHANT PATHAK ASSOCIATES
Chartered AccountantNandkumar Yashwantrao Deshmukh
PartnerRole in project
RAJENDRA MADHUKAR KALE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600027958Mar 2025 → Mar 2026

Reason as filed by the promoterRespected Sir, our construction work is not yet completed, hence we request you to kindly extend the proposed date of project completion till 31/03/2026

EA27022620040Mar 2025 → Dec 2026

Reason as filed by the promoterWith reference to the above subject, we hereby submit that the construction work of the project has been completed in accordance with the sanctioned building plan and as certified by the Project Architect through the Work Completion Certificate.We further submit that an application for issuance of the Occupancy/Completion Certificate has already been filed with the concerned Planning Authority. The approval is presently awaited.In view of the above and considering that the delay is procedural and beyond our control, we request your good office to kindly grant extension of the project registrat

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A I.PDF31 Jul 2026
Withdrawal Update Form 1File: FORM 1 - PHASE - I.PDF20 Jul 2026
Withdrawal Update Form 2File: Form 2 Phase 1.PDF20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Phase I_Sign.pdf20 Jul 2026
Withdrawal Update Form 1File: Ar Cretificate Phase - I.PDF28 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE I.PDF28 Apr 2026
Withdrawal Update Form 3File: FORM 3 CA CERTI PHASE I.pdf28 Apr 2026
Form 1File: ARCHITECT CERTI PHASE - 1 murlidhar park.pdf10 Feb 2026
Form 2File: ENGI CERTIFICATE PHASE 1.PDF10 Feb 2026
Form 3File: CA Certificate Phase I.PDF10 Feb 2026
Disclosure of Sold and Booked InventoryFile: BOOK INVENTARY PHASE 1.PDF10 Feb 2026
OthersFile: Phase I Form 2A.PDF10 Feb 2026
Form 1File: Phase 1.PDF13 Jan 2026
Form 2File: ENGINEER CERTIFICATE Q2 PHASE - 1.PDF13 Jan 2026
Form 3File: Form 3 - ShreeMurlidhar Park Phase- I.PDF13 Jan 2026
Disclosure of Sold and Booked InventoryFile: Phase I - Sold and Booked Inventory .PDF13 Jan 2026
OthersFile: Phase I Form 2A.PDF13 Jan 2026
Form 1File: Form 1 -Phase I.PDF26 Nov 2025
Form 2File: FORM 2 PHASE 1.PDF26 Nov 2025
Form 3File: Form 3 PHASE I.PDF26 Nov 2025
Disclosure of Sold and Booked InventoryFile: PHASE I.PDF26 Nov 2025
Form 5 (FY 2024-2025)File: Phase I - Form 5.PDF3 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase I.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unit - Phase I.pdf3 May 2025
Other - TechnicalFile: PERT CHART - PHASE I.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PHASE I.PDF2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi.pdf30 Apr 2025
Declaration in FORM BFile: Form B RM Kale - Phase I.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE 1 CA Certificate Form 3.PDF14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE 1 Engg.PDF14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PHASE 1.PDF28 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED PHASE 1.PDF28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE 1 FORM 1.PDF3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE 1 FORM 3.PDF3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE 1 FORM 2.PDF3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shree Murlidhar Park Phase-I.PDF7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREE MURLIDHAR PARK PH-1.PDF28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PHASE 1.PDF28 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q1.pdf28 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREEBRAMHAND.PDF20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 1.PDF20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PHASE I.PDF20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A PHASE I.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Phase I.pdf20 Apr 2024
CERSAI detailsFile: CERSAI merged.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREE MURLIDHAR PHASE 1.PDF25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF25 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Phase I.PDF25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Phase I Reduce.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE PHASE I.PDF3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS PHASE I.PDF3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE PHASE I.PDF21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A PHASE I.PDF21 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY PHASE I.PDF21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.PDF31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.PDF31 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD.PDF31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed- Murlidhar Park Phase 1.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ShreeMurlidhar park Phase I.PDF21 Jul 2023
Building plan approvalFile: DECLARATION ABOUT PLOT AREA1.pdf23 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: DECLARATION ABOUT PLOT AREA1.pdf23 Mar 2023
Building plan approvalFile: Plan 3-highlighted.pdf2 Mar 2023
Building plan approvalFile: Plan 4-Highlighted_compressed.pdf2 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3-highlighted.pdf2 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 4-Highlighted_compressed.pdf2 Mar 2023
Layout approvalFile: Layout - Mojani Nakasha.pdf17 Feb 2023
Layout approvalFile: SANAD.PDF17 Feb 2023
Building plan approvalFile: Plan 1.pdf17 Feb 2023
Building plan approvalFile: Plan 2.pdf17 Feb 2023
Building plan approvalFile: Plan 3.pdf17 Feb 2023
Building plan approvalFile: Plan 4-1.pdf17 Feb 2023
Building plan approvalFile: Plan 5-1.pdf17 Feb 2023
Building plan approvalFile: Plan 6-1.pdf17 Feb 2023
Building plan approvalFile: Plan 7-1.pdf17 Feb 2023
PAN CardFile: Pan Card.PDF17 Feb 2023
Copy of the legal title reportFile: Legal Title Report.PDF17 Feb 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Undertaking.pdf17 Feb 2023
Details of encumbrances concerned to FinanceFile: no any Legal and Litigation encumbranc.PDF17 Feb 2023
Details of encumbrances concerned to LegalFile: Self Declaration Undertaking.pdf17 Feb 2023
Details of encumbrances concerned to LegalFile: no any Legal and Litigation encumbranc.PDF17 Feb 2023

How this compares with Nashik

68%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 21 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE MURLIDHAR PARK PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AT POST GHOTI BK4,100+ in Nashik

2 kmSHREE MURLIDHAR PARK PHAOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: RAJENDRA MADHUKAR KALE

RAJENDRA MADHUKAR KALE has 3 registrations on MahaRERA, including SHREE MURLIDHAR PARK PHASE I and SHREEMURLIDHAR PARK PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE MURLIDHAR PARK PHASE I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MURLIDHAR PARK PHASE I?

The registered promoter entity is RAJENDRA MADHUKAR KALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MURLIDHAR PARK PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE MURLIDHAR PARK PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MURLIDHAR PARK PHASE I?

The professionals named in the filing: Architect: UMESH BAGUL; Engineer: SAGAR S SHAH; Engineer: Amey Dhalkari; Chartered Accountant: PRASHANT PATHAK ASSOCIATES; Chartered Accountant: Nandkumar Yashwantrao Deshmukh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MURLIDHAR PARK PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MURLIDHAR PARK PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MURLIDHAR PARK PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.