Home / Browse projects / Sangli, Maharashtra / SHREE KRUPA CITY

Registered No litigation declared Residential / Group Housing project

SHREE KRUPA CITY

By TATYASAHEB SAMBHAJI KHOT

RG-MH-18461 · RERA P53100077488 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 50%
17 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SHREE KRUPA CITY is a Residential / Group Housing project by TATYASAHEB SAMBHAJI KHOT in Sangli, Maharashtra, registered with MahaRERA as P53100077488 on 20 Aug 2024. Possession is promised by 31 Dec 2029. 0 of the 17 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE KRUPA CITY
  • TypeResidential / Group Housing
  • Location
    • SCHOOL EAST SIDE OF TURF GROUND 80FT ROAD KUPWAD
    • NEAR PODAR INTERNATIONAL SCHOOL
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416436
  • Pincode416436
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100077488
  • ReraGenie IDRG-MH-18461

Builder

  • NameTATYASAHEB SAMBHAJI KHOT
  • Entity typeIndividual
  • GSTIN27AUMPK8203H1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Current status

0%0 of 17 units booked
32.7%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE KRUPA CITY ROW HOUSENA2217017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

SHREE KRUPA CITY ROW HOUSE: 17% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered17
Open Space1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,157 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
Declared on3 Jun 2025
LandownerVillageDistrict
ANJALI BABGONDA PATILSangli Miraj Kupwad (M Corp.)Sangli
MANJUSHA BABGONDA PATILSangli Miraj Kupwad (M Corp.)Sangli
VILASMATI BABGONDA PATILSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ KUPWAD CORPORATION
Permissible FSI10101.44
Proposed, not sanctioned2,111 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Dr.Magdum Bldg.Nr.Vishrambag Bus Stop,SangliMirajKupwad.416415
Estimated costRs 4.62 cr
Cost incurredRs 1.51 cr
Work done32.72%
BuildingWingEstimatedIncurred
SHREE KRUPA CITY ROW HOUSENARs 4.62 crRs 1.51 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMBAR SHINDE
EngineerER ANIL RAM MANE
Chartered AccountantD S PALKAR
PartnerRole in project
TATYASAHEB SAMBHAJI KHOT-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-3-2026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 31-3-2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 31-3-2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM-1 (shree krupa city) 31-12-25 .pdf6 Feb 2026
Withdrawal Update Form 2File: FORM-2 (shree krupa city) 31-12-25 .pdf6 Feb 2026
Withdrawal Update Form 3File: FORM-3 (shree krupa city) 31-12-25 .pdf6 Feb 2026
Withdrawal Update Form 1File: form 1 30-9-25.pdf19 Nov 2025
Withdrawal Update Form 2File: form 2 30-9-25.pdf19 Nov 2025
Withdrawal Update Form 3File: FORM 3 30-9-25.pdf19 Nov 2025
Withdrawal Update Form 1File: form 1 30 6 25.pdf10 Sep 2025
Withdrawal Update Form 2File: form 2 30 6 25.pdf10 Sep 2025
Withdrawal Update Form 3File: form 3 30 6 25.pdf10 Sep 2025
Form 1File: FORM 1 SHRI KRUPA CITY_31032025.pdf4 Jun 2025
Form 2File: Withdrawal Application Form2 (1).pdf4 Jun 2025
Form 3File: FORM 3 31-3-25.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-3-25.pdf4 Jun 2025
Withdrawal Update Form 1File: FORM 1 SHRI KRUPA CITY_31032025.pdf4 Jun 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf4 Jun 2025
Withdrawal Update Form 3File: FORM 3 31-3-25.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 26-10-24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 31-12-24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092024.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 18-01-25.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - 30-09-24-.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-12-24.pdf22 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: SMKC TO MAHAREA MAIL SHRI ICON CITY.pdf13 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: hamipatra SHRI KRUPA CITY LAND OWNER.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOEM - 2 11-07-24.pdf23 Jul 2024
Other - LegalFile: DEVELOPMENT AGREEMENT_compressed (1)-1-30.pdf22 Jul 2024
Other - LegalFile: DEVELOPMENT AGREEMENT_compressed (1)-31-65.pdf22 Jul 2024
Other - LegalFile: POA ROW HOUSE_compressed.pdf22 Jul 2024
Other - TechnicalFile: OERDER NO 50.pdf22 Jul 2024
Building plan approvalFile: ROW HOUSE DRAWING.pdf20 Jul 2024
Layout approvalFile: PLOT DWG.pdf20 Jul 2024
PAN CardFile: PAN CARD - TATYASAHEB KHOT.pdf20 Jul 2024
Copy of the legal title reportFile: legal title report.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: non encumbrance certificate-FINANCE.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: NO Encumbrances certificate - legal.pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: non encumbrance certificate-FINANCE.pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: NO Encumbrances certificate - legal.pdf20 Jul 2024
Copy of Layout Approval (in case of layout)File: PLOT DWG.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: ROW HOUSE DRAWING.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: ROW HOUSE CERTIFICATE.pdf20 Jul 2024
Declaration about Commencement CertificateFile: declaration about commencemnt certificate.pdf20 Jul 2024
Declaration in FORM BFile: FROM B KHOT.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT 1 CITY.pdf20 Jul 2024
CERSAI detailsFile: undertaking.pdf20 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECURED UNSECURED LOAN.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf20 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSRE REAL ESTATE PROJECT.pdf20 Jul 2024
Proforma of Agreement for saleFile: UPDATED AGREEMENT TO SALE.pdf20 Jul 2024
Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER.pdf20 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format - A BANK.pdf20 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format - B BANK.pdf20 Jul 2024
Deviation Report with respect to Allotment letterFile: NON DAVIATION CERTIFICAT ALLOTMENT LETTER.pdf20 Jul 2024
Deviation Report with respect to model copy of AgreementFile: non daviation certificate AGREEMNT TO SALE.pdf20 Jul 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shri Krupa SankulPlot No 10 Satya Sai Nagar Near Pramod Dairy Vishrambaug Sangli15CompletedJun 2023Apr 2022
Shri Krupa ClassicPlot No 96 Satya Sai Nagar Near Pramod Dairy Vishrambaug Sangli12CompletedDec 2022Aug 2022

How this compares with Sangli

0%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SHREE KRUPA CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR PODAR INTERNATIONAL SCHOOL790+ in Sangli

2 kmSHREE KRUPA CITYCompleted 81Lapsed / revoked 49Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: TATYASAHEB SAMBHAJI KHOT

TATYASAHEB SAMBHAJI KHOT has 6 registrations on MahaRERA, including SHRI KRUPA SANKUL and SHRI KRUPA CLASSIC. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SHREE KRUPA CITY is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE KRUPA CITY?

The registered promoter entity is TATYASAHEB SAMBHAJI KHOT, an individual as per the filing. Its GSTIN 27AUMPK8203H1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE KRUPA CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE KRUPA CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE KRUPA CITY?

The professionals named in the filing: Architect: AMBAR SHINDE; Engineer: ER ANIL RAM MANE; Chartered Accountant: D S PALKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE KRUPA CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE KRUPA CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE KRUPA CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.