SHREE HARIKRUSHNA HEIGHTS
RG-MH-13593 · RERA P51600026379 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 42 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE HARIKRUSHNA HEIGHTS is a Residential / Group Housing project by PARSHWANTH PROJECTS in Nashik, Maharashtra, registered with MahaRERA as P51600026379 on 16 Sep 2020. Possession is promised by 1 Feb 2027. The completion date has moved by 42 months from the original filing.
At a glance
Project
- NameSHREE HARIKRUSHNA HEIGHTS
- TypeResidential / Group Housing
- Location
- NEAR ASHOKA MEDICOVER HOSPITAL
- INDRA NAGAR
- Indiranagar
- Nashik
- 422006
- Pincode422006
- RERA no.P51600026379
- ReraGenie IDRG-MH-13593
Builder
- NamePARSHWANTH PROJECTS
- Entity typePartnership
- PartnersNARAYAN GOVERDHAN KASIYANI, RAMESH GOVERDHAN KASIYANI, KIRAN HARAKCHAND BHAYANI, PARESH HARAKCHAND BHAYANI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Sep 2020
- Promised completion1 Feb 2027
- Revised completionRevised to 1 Feb 2027 (originally 31 Aug 2023)
- Buildings3 building records
- Documents filed126 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING C RESIDENITAL | NA | 17 | 0 | 0 | 0 | 0 |
| WING A RESIDENITAL AND COMMERICAL | NA | 21 | 0 | 0 | 0 | 0 |
| WING B RESIDENITAL AND COMMERCIAL | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
WING C RESIDENITAL94%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 90% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
WING A RESIDENITAL AND COMMERICAL63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 68% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 47% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 68% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B RESIDENITAL AND COMMERCIAL96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 78% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 5% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | Yes | 15% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed208
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| WING C RESIDENITAL | 57 | 57 |
| WING A RESIDENITAL AND COMMERICAL | 60 | 60 |
| WING B RESIDENITAL AND COMMERCIAL | 91 | 91 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RASIK KUMAR BOTHARA |
| Engineer | PRAKASH RAMESH KASHIYANI |
| Chartered Accountant | SANTOSH NAMDEV KASAR |
| Partner | Role in project |
|---|---|
| PARSHWANTH PROJECTS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID19 WORK WILL BE COMPLETED BY DELAY
Reason as filed by the promoterPROJECT EXPIRY DATE SHOWN 28/02/2025 THEREFORE THIS IS SUFFICENT TIME FOR COMPLETION OF THE PROJECT
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Sep 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Feb 2027
Documents filed126
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARCHITECT CERTIFICATE.pdf | 20 May 2026 |
| Form 2File: ENGINEER CERTIFICATE.pdf | 20 May 2026 |
| Form 3File: CA CERTIFICATE.pdf | 20 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 20 May 2026 |
| Form 1File: ARCHITECT CERTIFICATE.pdf | 24 Jul 2025 |
| Form 2File: ENGINEERS CERTIFICATE.pdf | 24 Jul 2025 |
| Form 3File: CA CERTIFICATE.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 24 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Prashwant Project - Shree harikrushn height.pdf | 9 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Self Declaration on Letter Head.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE.pdf | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate.pdf | 27 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A Change of Bank Account.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31122024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31122024.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31122024.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 310324.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 310324.pdf | 18 Jan 2025 |
| Details of encumbrancesFile: parshwnath.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Parshwanath Project- Final.pdf | 14 Feb 2024 |
| OtherFile: two third consent (1).pdf | 2 Jan 2024 |
| OtherFile: two third consent (2).pdf | 2 Jan 2024 |
| OtherFile: two third consent (2).pdf | 2 Jan 2024 |
| Declaration in FORM BFile: extension deceleration.pdf | 8 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architect.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf | 5 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2 engineer certificate.pdf | 5 Dec 2023 |
| OtherFile: two third consent.pdf | 2 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 28 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold inventory.pdf | 20 Nov 2023 |
| OtherFile: consent.pdf | 20 Nov 2023 |
| Building plan approvalFile: 13 Building Plan Approval _ NA Order for plotted development.pdf | 4 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 13 Building Plan Approval _ NA Order for plotted development.pdf | 4 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AUDIT REPORT 21-22 RERA.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Report FY 21-22.pdf | 13 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CA CERTIFICATE.pdf | 1 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENG CERTIFICATE.pdf | 1 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY SOLD UNITS.pdf | 1 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 1 Apr 2023 |
| Building plan approvalFile: 1-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 2-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 3-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 4-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 5-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 6-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 7-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 8-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 9-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 10-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 12-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 13-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 14-15.pdf | 29 Mar 2023 |
| Building plan approvalFile: 15-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 8-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 9-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 14-15.pdf | 29 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 15-15.pdf | 29 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 29 Mar 2023 |
| Details of Restarting of Construction work post lockdownFile: Restarting of Construction work post lockdown.pdf | 12 May 2022 |
| Proforma of Allotment letterFile: _Sample_Agreement.pdf | 27 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 28 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 28 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 28 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 28 Feb 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE HARIKRISHNA PLAZAP51600007472 | Nashik, Nashik | Aug 2017 | Certificate Signed | Apr 2032Registered original: Jul 2019 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 126 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE HARIKRUSHNA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near INDRA NAGAR4,100+ in Nashik
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: PARSHWANTH PROJECTS
PARSHWANTH PROJECTS has 1 registration on MahaRERA, including SHREE HARIKRUSHNA HEIGHTS. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE HARIKRUSHNA HEIGHTS is delayed beyond 1 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE HARIKRUSHNA HEIGHTS?
The registered promoter entity is PARSHWANTH PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE HARIKRUSHNA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE HARIKRUSHNA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE HARIKRUSHNA HEIGHTS?
The professionals named in the filing: Architect: RASIK KUMAR BOTHARA; Engineer: PRAKASH RAMESH KASHIYANI; Chartered Accountant: SANTOSH NAMDEV KASAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE HARIKRUSHNA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback