Home / Browse projects / Wardha, Maharashtra / SHREE GUNGARA BALAJI PARK
SHREE GUNGARA BALAJI PARK
RG-MH-60716 · RERA P50400050832 · Last updated on MahaRERA portal: 8 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GUNGARA BALAJI PARK is a Plotted project by SHREE GUNGARA BALAJI PARK in Wardha, Maharashtra, registered with MahaRERA as P50400050832 on 9 May 2023. Possession was promised by 30 Mar 2026 and is now 7 months past that date. 33 of the 71 units on this registration are recorded sold or booked.
At a glance
Project
- NameSHREE GUNGARA BALAJI PARK
- TypePlotted
- Location
- Wardha Road
- Pavnar
- Wardha
- 442001
- Pincode442001
- RERA no.P50400050832
- ReraGenie IDRG-MH-60716
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 May 2023
- Promised completion30 Mar 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed89 files
Current status
Figures as on 8 Jan 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 99% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| OM BALKRISHNARAO THAKARE | Wardha (M Cl) | Wardha |
| CHANDRASHEKHAR M RAUT | Wardha (M Cl) | Wardha |
| KISHOR VISHWANATH BHOOT | Wardha (M Cl) | Wardha |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | J P ASSOCIATES ENGINEERS & CONSULTANT |
| Chartered Accountant | S P SANGTANI & CO |
| Chartered Accountant | DHANDEKAR METHWANI & CO CHARTERED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| SHREE GUNGARA BALAJI PARK | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate.pdf | 8 Jan 2026 |
| Form 2File: Engineer Certificate.pdf | 8 Jan 2026 |
| Form 3File: Form 3.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 8 Jan 2026 |
| Form 1File: Architect Certificate.pdf | 8 Jan 2026 |
| Form 2File: Engineer Certificate.pdf | 8 Jan 2026 |
| Form 3File: Form 3.pdf | 8 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 8 Jan 2026 |
| Form 1File: Arc.pdf | 21 Aug 2025 |
| Form 2File: Eng.pdf | 21 Aug 2025 |
| Form 3File: CA Certificate.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 21 Aug 2025 |
| OthersFile: Completion Certificate Om Thakre.pdf | 21 Aug 2025 |
| Form 1File: Architects Certificate.pdf | 18 Aug 2025 |
| Form 2File: Engineer Certificate.pdf | 18 Aug 2025 |
| Form 3File: CA Certificate.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf | 18 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2.pdf | 18 Aug 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 18 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed Updated.pdf | 11 Apr 2023 |
| Other - FinanceFile: Error In Name.pdf | 16 Mar 2023 |
| Other - FinanceFile: Bank Joint Declaration.pdf | 16 Mar 2023 |
| PAN CardFile: Self Declaration for Not having seperate PAN.pdf | 2 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration formate A.pdf | 22 Feb 2023 |
| Other - TechnicalFile: Declaration Non Formation Of Entity.pdf | 22 Feb 2023 |
| PAN CardFile: Declaration Non Formation Of Entity.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate.pdf | 17 Feb 2023 |
| PAN CardFile: Kishor Bhoot Pan.pdf | 6 Feb 2023 |
| PAN CardFile: Om Thakre PAN.pdf | 1 Feb 2023 |
| PAN CardFile: Chandrashekhar Raut PAN.pdf | 1 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 27 Jan 2023 |
| CERSAI detailsFile: CERSAI Undertaking and No Charge Certificate.pdf | 27 Jan 2023 |
| Proforma of Agreement for saleFile: Model Form of Agreement_compressed (1).pdf | 27 Jan 2023 |
| Proforma of Allotment letterFile: model form of Allotment Letter_compressed.pdf | 27 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation AL.pdf | 27 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation For ATS.pdf | 27 Jan 2023 |
| Layout approvalFile: Layout Plan Om Thakre.pdf | 21 Jan 2023 |
| Building plan approval or NA orderFile: Layout Plan Om Thakre.pdf | 21 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SHREE GUNGARA BALAJI PARK | MAUZA SELOO | Ongoing | Oct 2024 | Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE GUNGARA BALAJI PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pavnar290+ in Wardha
Shri Ram Vatika
Krishnagiri Developers
LITTLE EARTH UNIT 11
SANJAY P. MANMODE, GANESH P. ATKAR AND MOH
Shree Sadguru Krushnagiri Nagari
Shree Samarth Infra
DATTADHAM PART 4
HARIBHAU WASUDEORAO WAZURKAR
Mahalaxmi CIty Part-2
Krushna Builders & Developers
ISHWAR NAGAR
Mahesh Batra & 2 Others
See every Wardha project, with the district possession charts
Builder: SHREE GUNGARA BALAJI PARK
SHREE GUNGARA BALAJI PARK has 2 registrations on MahaRERA, including SHREE GUNGARA BALAJI PARK and SHREE GUNGARA BALAJI PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What does it mean that SHREE GUNGARA BALAJI PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREE GUNGARA BALAJI PARK is delayed beyond 30 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GUNGARA BALAJI PARK?
The registered promoter entity is SHREE GUNGARA BALAJI PARK, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GUNGARA BALAJI PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GUNGARA BALAJI PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GUNGARA BALAJI PARK?
The professionals named in the filing: Engineer: J P ASSOCIATES ENGINEERS & CONSULTANT; Chartered Accountant: S P SANGTANI & CO; Chartered Accountant: DHANDEKAR METHWANI & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GUNGARA BALAJI PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback