New projects and RERA data in Wardha district, Maharashtra

292 of the projects in this build are in Wardha district: 17,730 units across them, 9 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

292Projects in this build
9Registered, last 12 months
17,730Units declared
15,044Units not yet booked
17Completion dates revised
0With declared litigation

Of the 292 covered registrations, 17 have revised their promised completion date and 0 declare litigation. The median project here is 0% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

When Wardha projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 292 projects with a promised date, 199 are recorded delivered, 40 are still on the register and 53 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 2 projects, delivered’172018: 10 projects, delivered’182019: 7 projects, delivered’192020: 4 projects, delivered2020: 2 projects, registration lapsed or cancelled’202021: 11 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 21 projects, delivered2022: 15 projects, registration lapsed or cancelled’222023: 38 projects, delivered2023: 9 projects, registration lapsed or cancelled’232024: 48 projects, delivered2024: 12 projects, registration lapsed or cancelled’242025: 30 projects, delivered2025: 4 projects, registration lapsed or cancelled’252026: 17 projects, delivered2026: 4 projects, on the register2026: 8 projects, registration lapsed or cancelled’262027: 9 projects, delivered2027: 12 projects, on the register’272028: 1 projects, delivered2028: 10 projects, on the register’282029: 1 projects, on the register’292030: 1 projects, delivered2030: 5 projects, on the register’302032: 7 projects, on the register’322034: 1 projects, on the register’34

76 projects promise possession in 2026 or later. Facts as per filings on RERA website.

01,2502,5003,7505,000today’172018: 415 flats, delivered’182019: 176 flats, delivered (only 2 of 7 projects filed a flat count)’192020: 182 flats, delivered’202021: 507 flats, delivered2021: 90 flats, registration lapsed or cancelled’212022: 1,070 flats, delivered2022: 900 flats, registration lapsed or cancelled’222023: 2,125 flats, delivered2023: 489 flats, registration lapsed or cancelled’232024: 3,407 flats, delivered2024: 464 flats, registration lapsed or cancelled’242025: 2,121 flats, delivered2025: 65 flats, registration lapsed or cancelled’252026: 1,609 flats, delivered2026: 147 flats, on the register2026: 547 flats, registration lapsed or cancelled’262027: 1,090 flats, delivered2027: 508 flats, on the register’272028: 45 flats, delivered2028: 848 flats, on the register’282029: 130 flats, on the register’292030: 411 flats, on the register’302032: 215 flats, on the register’322034: 169 flats, on the register’34

5,719 flats are promised in 2026 or later, across the 93% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Wardha possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 17 of 292 projects (6%) have moved at least once; the median move is 24 months and the longest is 62 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 2 projects kept the original date, 100% of the year’17Originally due 2018: 10 projects kept the original date, 91% of the yearOriginally due 2018: 1 projects moved by under 2 years, 9% of the year’18Originally due 2019: 6 projects kept the original date, 67% of the yearOriginally due 2019: 2 projects moved by under 2 years, 22% of the yearOriginally due 2019: 1 projects moved by 2 years or more, 11% of the year’19Originally due 2020: 5 projects kept the original date, 100% of the year’20Originally due 2021: 13 projects kept the original date, 87% of the yearOriginally due 2021: 1 projects moved by under 2 years, 7% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 7% of the year’21Originally due 2022: 35 projects kept the original date, 92% of the yearOriginally due 2022: 1 projects moved by under 2 years, 3% of the yearOriginally due 2022: 2 projects moved by 2 years or more, 5% of the year’22Originally due 2023: 44 projects kept the original date, 94% of the yearOriginally due 2023: 1 projects moved by under 2 years, 2% of the yearOriginally due 2023: 2 projects moved by 2 years or more, 4% of the year’23Originally due 2024: 58 projects kept the original date, 95% of the yearOriginally due 2024: 1 projects moved by under 2 years, 2% of the yearOriginally due 2024: 2 projects moved by 2 years or more, 3% of the year’24Originally due 2025: 33 projects kept the original date, 94% of the yearOriginally due 2025: 1 projects moved by under 2 years, 3% of the yearOriginally due 2025: 1 projects moved by 2 years or more, 3% of the year’25Originally due 2026: 27 projects kept the original date, 100% of the year’26Originally due 2027: 16 projects kept the original date, 100% of the year’27Originally due 2028: 11 projects kept the original date, 100% of the year’28Originally due 2029: 1 projects kept the original date, 100% of the year’29Originally due 2030: 6 projects kept the original date, 100% of the year’30Originally due 2032: 7 projects kept the original date, 100% of the year’32Originally due 2034: 1 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000’17Originally due 2018: 415 flats kept the original date, 91% of the year’18Originally due 2019: 176 flats kept the original date, 67% of the year (only 2 of 9 projects filed a flat count)’19Originally due 2020: 182 flats kept the original date, 100% of the year’20Originally due 2021: 597 flats kept the original date, 87% of the year’21Originally due 2022: 1,970 flats kept the original date, 92% of the yearOriginally due 2022: 12 flats moved by under 2 years, 3% of the yearOriginally due 2022: 59 flats moved by 2 years or more, 5% of the year’22Originally due 2023: 2,602 flats kept the original date, 94% of the yearOriginally due 2023: 41 flats moved by under 2 years, 2% of the yearOriginally due 2023: 38 flats moved by 2 years or more, 4% of the year’23Originally due 2024: 3,830 flats kept the original date, 95% of the yearOriginally due 2024: 98 flats moved by 2 years or more, 3% of the year’24Originally due 2025: 2,159 flats kept the original date, 94% of the yearOriginally due 2025: 16 flats moved by under 2 years, 3% of the yearOriginally due 2025: 30 flats moved by 2 years or more, 3% of the year’25Originally due 2026: 2,273 flats kept the original date, 100% of the year’26Originally due 2027: 1,414 flats kept the original date, 100% of the year’27Originally due 2028: 893 flats kept the original date, 100% of the year’28Originally due 2029: 130 flats kept the original date, 100% of the year’29Originally due 2030: 411 flats kept the original date, 100% of the year’30Originally due 2032: 215 flats kept the original date, 100% of the year’32Originally due 2034: 169 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Wardha

ProjectDeveloperUnits BookedRegistered
Subhash ResidencyAbhijit Subhash Bidkar and Amol Subhash Bidkar3760%16 Oct 2025
Shri Ram VatikaKrishnagiri Developers3540%15 Apr 2024
Baramati CityATUL NAMDEO WANDILE3000%8 Mar 2022
Chhoriya Future City - Deoli Wardha PlottingChhoriya Developers and Construction Company2955%5 Oct 2021
LITTLE EARTH UNIT 11SANJAY P. MANMODE, GANESH P. ATKAR AND MOHAN P. MANMODE2510%22 Mar 2024
Shree Sadguru Krushnagiri NagariShree Samarth Infra22442%23 Oct 2021
DATTADHAM PART 4HARIBHAU WASUDEORAO WAZURKAR2131%30 Apr 2025
R M Dhariwal Township - Arvi Bhaipur Plotting Phase - 2Dhariwal And Chhoriya Developers LLP21248%1 Dec 2020
KESARIYA PARKRAKESH MOHANRAO MADE2037%24 Jan 2023
baramati cityMAHESH SHANKARRAO GULHANE20149%14 Mar 2022
MAHALAXMI TOWNVASTU LAND DEVELOPERS AND BUILDERS1840%22 Nov 2021
SAHARA TOWNHARE KRISHNA LAND DEVELOPERS17972%20 Feb 2018
Mahalaxmi CIty Part-2Krushna Builders & Developers17563%8 Dec 2023
Omkar NagarA. V. Infratech1690%21 Dec 2024
ISHWAR NAGARMahesh Batra & 2 Others1640%22 Feb 2022
BARAMATI CITYMAHESH SHANKARRAO GULHANE1620%14 Mar 2022
MAHALAXMI CITY RESIDENTIAL LAYOUT PLAN IN SURVEY NO 128 129 108/1MAHESH SHANKARRAO GULHANE15646%3 Jan 2023
ISHWAR NAGARKESHAR INFRA1550%15 Feb 2022
R M Dhariwal Township Wardha PlottingDhariwal And Chhoriya Buildcon Pvt Ltd15181%23 Aug 2017
NANO PARK-2SAWAN JAGDISH MIHANI1500%23 Oct 2021
Shree Krushnai CityKrishnagiri Developers1460%28 Feb 2025
KESARIYA NAGARIRAKESH M. MADE1450%11 Apr 2022
Mauli parkKAUSALYADEVI BANSILAL TAORI1380%3 Nov 2021
MANISH NAGARURBAN HERITAGE GROUP LAND DEVELOPERS1360%25 Mar 2021
SUKHMANI NAGARSUKHMANI DEVELOPERS AND BUILDERS1340%2 Oct 2020
R M Dhariwal Township - Aravi Bhaipur Plotting Phase -1Dhariwal And Chhoriya Developers LLP13021%9 Jul 2020
GANESH NAGAR PART - 4PRATIMA DILIPRAO SHANKARPALE13010%6 Mar 2023
Shri Ram VatikaKrushna Builders & Developers12813%10 May 2024
ANAND SAGAR CITY PART 2MAHAJAN LAND DEVELOPERS1260%30 Aug 2022
Chhoriya Fortune City - Sindhi Meghe Wardha Plotting Phase -1Dhariwal And Chhoriya Developers LLP12310%10 Jan 2021
VAIBHAV NAGAR - 1ASHISH SHARADKUMAR TIWARI1230%6 Oct 2025
MAULI PARKSNEHAL BHAIYYAJI PISUDDE1200%22 Dec 2022
MAULI PARKRUPALI PRAVIN GHURDE1180%19 May 2023
VAIBHAV NAGAR 2Vaibhav Ravi Kashikar1160%13 Oct 2025
SUNANDA NAGRISHARAD BHAGWANTRAO TALHAN1120%29 May 2025
KINGS VILLAGEVYANKATESH ASSETS MAXIMIZER ASSETS PRIVATE LIMITED1113%14 Aug 2017
Mahakali Nagari-7Krishnagiri Developers1100%26 Feb 2020
SHREE SHYAM NAGARSHREE SHYAM DEVELOPERS10833%7 Nov 2020
KANHA CITYSHRI KRISHNA LAND DEVELOPERS AND BUILDERS1070%28 Apr 2022
SAI NAGARNIRAJ LOHAKARE, SANJAY SHARMA, SUNIL LANGADE, VIKRAM TAORI AND PRADEEP NAHALE1060%11 Jun 2024
GMR PLOTSGMR Plots10582%14 Jun 2021
KRUSHNA KAMAL NAGRIVITTHAL KACHOLE, ESHWAR KACHOLE, MANDA ZADE, MAYA SONTAKKE AND CHITRA DAIGAVANE1050%27 Dec 2023
AKSHARDHAMGOVINDAM INFRA1050%2 May 2024
LITTLE EARTH - UNIT 5SAI SAHARA LAND DEVELOPERS10415%30 Apr 2020
SAI NAGARSAI SAHARA LAND DEVELOPERS1040%17 Aug 2021
AAI KRUPA NAGARIMAHESH SHANKARRAO GULHANE1030%5 Apr 2021
Siyaram NagarBalkrishna Jajodiya, Geetadevi Jajodia and Shriniwas Jajodiya10310%31 Jan 2024
MAULI PARKSNEHAL BHAIYAJJI PISUDDE10217%6 Mar 2023
SHUBHANGI S THAKRE AND VAISHALI K GALHATSHUBHANGI SUBODH THAKRE1010%12 Apr 2023
Baramati CityMAHESH SHANKARRAO GULHANE10042%14 Mar 2022
ANAND SAGAR CITY - PART 7MAHAJAN LAND DEVELOPERS1000%10 Nov 2023
DEHU AALANDI PARKDAMOHAR MAHADEORAO MANKAR980%24 May 2022
Aai NagariManoj Vora, Anju Tiwari & Ujwala Purohit970%19 Nov 2020
Nano ParkSUNIL HARPALDAS MIHANI970%19 Nov 2020
MAHAKALI NAGRI - 6Krishnagiri Developers960%13 Mar 2019
MAHAKALI NAGARI-7Krishnagiri Developers960%9 Mar 2020
Mauli ParkSANJAY TEJMAL OSTWAL960%27 Aug 2020
AARADHYA NAGAR PART 2PAWAN SHRIRAM PODDAR961%4 Jan 2021
NAKSHTRA NAGARIVINOD PANDURANG NIKHADE950%24 Jul 2020
SHREE SAI NAGARKESHAR INFRA9494%23 Jul 2020
GAYATRI PARKPavan S Vidhwani, Pradip V Giradkar, Shankarrao Champatrao Yeulkar, Vrushabh Anantrao Thakre910%29 Dec 2023
SHRI SAMARTH DADAJI MAHARAJ NAGRIRAJESH BHAIYALAL SAHU9052%8 Jun 2020
Aai nagariMAHESH SHANKARRAO GULHANE880%6 Jan 2020
LITTLE EARTH UNIT - 6VASTU LAND DEVELOPERS AND BUILDERS8836%30 May 2020
MAULI PARKManoj Bansilal Taori880%12 Nov 2021
SHIV SAHARA TOWNSUDHARKAR SATONE , RAJU PACHGHARE , NARHARI KOLHE , MANISH BHOYAR , PRAVIN PAHADE8760%17 Mar 2020
URBAN HERITAGE TOWNBALAJI LAND DEVELOPERS8610%30 Oct 2018
UTTAM TOWN - UNIT 2UTTAM PARK LAND DEVELOPERS8358%21 Sep 2017
Ganesh Nagar Part 2MANISH SHARADKUMAR TIWARI831%3 Dec 2021
Mauli TownSanjay Tejmal Ostwal820%25 Aug 2020
DATTADHAM PART 1HARIBHAU WASUDEORAO WAZURKAR820%22 Feb 2022
ANAND SAGAR CITY PART - 1MAHAJAN LAND DEVELOPERS820%5 Aug 2022
RAJE CHHATRAPATI GOLDEN CITY ALLIPPURBHALCHANDRA CHHATRAPTI HARNE810%27 Jan 2020
SUBHASH NAGARADARSH UMRE AND DARSHAN UMRE810%15 Jul 2021
Balaji Town - Residential Layout Plan in Sr No 62/1 and 62/3Surendra Mahakalkar And Vinod Dhoble8173%7 Nov 2022
MAULI PARKSUNIL PURUSHOTTAM DHOBLE8019%22 Feb 2023
GOKUL CITY VIShourya Builders and Developers790%16 Jan 2020
BHASKAR NAGARIBHUSHAN ORKE, ROSHAN ORKE, ASHISH ORKE, REKHA ORKE, JYOTI BHELE7911%15 Aug 2021
MAHALAXMI NAGRI GREEN CITYJITENDRA RAMESHRAO KAMDI790%25 Aug 2022
ROYAL ESTATEFIROZ S/O FARUK HUSAIN AND KESHAVBHAI S/O JADAVBHAI PAGHADAL791%4 Mar 2024
GANESH NAGAR - 2SANJAY TEJMAL OSTWAL780%28 Apr 2022
VENKATESH NAGARIRAMESH HARIBHAU HOLAGARE770%23 Dec 2020
VAISHNODEVI NAGARISUNANDA PRABHAKAR DURBUDE770%15 Jun 2022
LITTLE EARTH - UNIT 8SHUBHALAXMI LAND DEVELOPERS770%21 Apr 2023
MAKAKALI NAGRI - 6ATUL NAMDEO WANDILE760%25 Mar 2019
Ayodhya City-Residential Layout Plan in Survey No-107/2MAHESH SHANKARRAO GULHANE76100%15 Dec 2022
SHREE KRISHNA NAGARARTH LAND DEVELOPERS750%20 Sep 2021
SUNDER TOWNAsif Hussain, Sushil Dhote, Surendra Chamat, Sudhakar Chamlate, Ravindra Ekapure, & Gopichand Mate750%22 Mar 2024
SHRI RAM TOWNSAI SAHARA LAND DEVELOPERS7485%10 Oct 2018
SAI SHRADDHA CITYSHRADDHA SANJAY MANMODE740%20 Apr 2022
REWATKAR COLONY SANTAJI NAGARDHARMARAJ DOMAJI REWATKAR730%2 Jan 2020
SHRI NARESH JAGJIWANDAS VASANI PROPRIETOR OF SHREE HARI REAL ESTATENARESH JAGJIWANDAS VASANI730%22 Jun 2022
MAHAKALI NAGRI - 6ATUL NAMDEO WANDILE720%15 Mar 2019
LITTLE EARTH UNIT 9SAI SAHARA LAND DEVELOPERS720%8 Dec 2023
LITTLE EARTH UNIT 4SAI SAHARA LAND DEVELOPERS7127%7 Apr 2020
VASTU PARKVASTU LAND DEVELOPERS AND BUILDERS7148%3 May 2021
SHREE GUNGARA BALAJI PARKSHREE GUNGARA BALAJI PARK7146%9 May 2023
MAULI PARKSNEHAL BHAIYYAJI PISUDDE700%21 Apr 2023
DATTADHAM PART 2HARIBHAU WASUDEORAO WAZURKAR690%2 Mar 2022
ANAND SAGAR CITY PART 5MAHAJAN LAND DEVELOPERS690%5 Oct 2023
NARENDRA NAGARSHREE VINAYAKA DEVELOPERS680%22 Nov 2021
GOKUL CITY 4SHOURYA BUILDERS AND DEVELOPERS680%10 May 2021
Krushnai NagarMahesh K. Batra and Deepak G Mandokar6866%3 Nov 2021
BALAJI PARKSUNIL PURUSHOTTAMRAO DHOBLE670%15 Feb 2023
ARUN SAKHARAM VIRULKARARUN SAKHARAM VIRULKAR660%27 Jun 2023
BALAJI NAGARI 2ANIL ARUNRAO KAROTKAR6549%31 Jul 2020
Shree Mahalaxmi NagariGorakhnath P Choudhari & 4 Other6525%22 Nov 2021
Mauli parkVilas Narayanrao Neware640%4 Jan 2022
HARIOM NAGARPravin S/o Panditrao Kachole And Pankaj S/o Panditrao Kachole640%10 Nov 2023
MADHAV CITYSHRI KRISHNA LAND DEVELOPERS AND BUILDERS6297%18 Feb 2020
GANESH NAGARSanjay Tejmal Ostwal620%22 Nov 2021
JAIHIND NAGARBABARAO JAMBHULKAR AND UTTARA JAMBHULKAR622%28 Apr 2022
NITIN GAWANDE, RUTUJA GHARFALKAR AND YOGESH JAISWALNITIN D. GAWANDE, RUTUJA A. GHARFALKAR, YOGESH C. JAISWAL626%25 Jan 2024
MAHESH NAGARASHISH S. TIWARI AND ARCHANA M. TAORI620%31 May 2024
MAHAKALI NAGRI-7ATUL NAMDEO WANDILE610%24 Feb 2020
KIRANGE NAGARIVISHVANATH RAMA KIRANGE610%20 Sep 2021
MAA RANI NAGARI PART - 1Sharad Ramaji Vihirkar6072%11 Jun 2021
SHIVGARHASHISH SHARADKUMAR TIWARI6015%8 Nov 2021
SHREE GUNGARA BALAJI PARKSHREE GUNGARA BALAJI PARK6015%3 Nov 2021
SHANKAR BABA NAGARIGopi Hariram Kriplani607%22 Jun 2022
SARA NAGARI IIUDAY MANSARAM NITNAWARE600%21 Mar 2023
GANRAYA GARDENAMIT DEEPAKRAO BHANDARWAR AND DEEAK MADHUKAR BHANDARWAR590%25 Dec 2020
Gokul City IIIShourya Builders and Developers570%14 Jun 2019
KACHOLE LAYOUT PART-2RAVINDRA GOVIND KACHOLE572%6 Mar 2023
NANDI TOWNJITENDRA RAMESHRAO KAMADI560%16 Dec 2019
MAHAKALI NAGARIDAMODAR MANIKRAO KACHORE560%1 Jul 2020
AARADHYA NAGAR PART 1PAWAN PODDAR AND SAURABH PODDAR564%4 Jan 2021
SHIV NAGARI MOTGHARE LAYOUTPANDURANG KISAN MOTGHARE560%22 Jun 2022
DHP TOWNDHP INFRAVENTURES560%19 Sep 2022
Mathura Nagari- Residential Layout Plan In Survey No 27Gurukrupa Land Developers5612%17 Jan 2023
SARA NAGARI IUDAY MANSARAM NITNAWARE560%29 May 2023
UTTAM TOWN - UNIT 1UTTAM PARK LAND DEVELOPERS5481%21 Sep 2017
AABAJI NAGARSACHIN BUTE , ASHOK LUTHDA , INDRARAJ BATRA5441%9 Aug 2020
SAUMYA NAGARIASHISH SHARADKUMAR TIWARI540%10 Sep 2022
SAI NAGARISAI INFRATECH5372%4 Sep 2018
AAI NAGARIKrishnagiri Developers530%5 Feb 2020
Shriram NagarMAHAVIR LAND DEVELOPERS52100%6 Jun 2020
SHREE GUNGARA BALAJI PARKSHREE GUNGARA BALAJI BUILDCON5248%20 Aug 2020
BALAJI NAGARIANIL ARUNRAO KAROTKAR5231%29 Jul 2020
NEW SHIKSHAK COLONYASIF HUSSAIN5235%29 Aug 2022
RAMYA NAGARINIRAJ LOHAKARE AND HARISH TAORI5133%3 Nov 2020
Muskan ParkIqbal Haroon Kasmani510%15 Jun 2022
LITTLE EARTH UNIT 1SAI SAHARA LAND DEVELOPERS500%23 May 2020
MAHAKALI NAGARIMaa Rani Hospitality and Infra502%9 Feb 2022
NARAYAN NAGARRAJENDRA NARAYAN PETKAR5020%15 Feb 2023
RAMAI NAGAR-2Mahesh Kesardas Batra500%11 Jun 2024
VALLABH NAGARSADGURU LAND DEVELOPERS490%28 Nov 2023
Dwarka CityKrishnagiri Developers480%28 May 2018
Shankar NagarMAHESH SHANKARRAO GULHANE480%9 Feb 2022
BARAMATI CITYATUL NAMDEO WANDILE480%8 Mar 2022
DATTADHAM PART 3HARIBHAU WASUDEORAO WAZURKAR482%22 Feb 2022
Sai Park-2 Residential Layout PlanMahesh Kesardas Batra4829%28 Nov 2022
SUBHADRA HEIGHTHARISH SUDHAKAR SHENDE4827%22 May 2024
DREAM PARKRUDRAKASH ASSOCIATES470%21 Feb 2024
Manoram NagariSanjay Manohar Dhamane450%4 Aug 2022
LITTLE EARTH - UNIT 7VASTU LAND DEVELOPERS AND BUILDERS450%24 Feb 2023
KACHOLE LAYOUT PART-1SUDHAKAR G KACHOLE4527%24 Feb 2023
RADHA NAGARINARESH NARAYANRAO DOD4516%21 Nov 2023
SHREE HARI NAGARA R ASSOCIATES440%10 Nov 2020
Baramati CityMaa Rani Hospitality and Infra4418%4 Aug 2022
PRASHANT INGALE LAYOUTPRASHANT WASUDEORAO INGALE440%3 Jan 2023
LAXMINARAYAN NAGAR PART IVDILIP WASUDEORAO SHANKARPALE4363%9 Apr 2019
Mahakali Nagri-5Krishnagiri Developers430%12 Mar 2020
Radha CityManoj Ghansham Vora430%15 Apr 2021
Mauli Park - 3SHRIKANT VASANT KORDE420%19 Mar 2020
MAULI TOWNSNEHAL BHAIYYAJI PISUDDE420%28 Jun 2020
Shankar NagarYogesh Laxmikant Gawande420%2 Feb 2022
MATOSHREE NAGARTAHER ESSAJI, ATUL PISE, ATUL FATING, AMIT DURGE AND ANIL SAHU420%26 Aug 2022
ANAND SAGAR CITY PART 6MAHAJAN LAND DEVELOPERS420%13 Jul 2023
DHP TOWN-WING BDHP INFRAVENTURES420%30 Jul 2025
AAI NAGARIDEEPAK GANGADHAR MANDOKAR415%10 Feb 2020
BALAJI NAGARI 1ANIL ARUNRAO KAROTKAR4168%29 Jul 2020
SAKHUAAI DEVELOPERSAJAY P. DESHMUKH, RUPALI J. KHODAKE415%10 Sep 2022
Dream CityIqbal Haroon Kasmani4171%8 Jun 2023
Dwarka CityDeepak G. Mandokar And Rahul M. Sharma400%28 May 2018
LITTLE EARTH UNIT - 2LITTLE EARTH UNIT - 2400%28 Jun 2020
VITHAI NAGRIPurushottam Wamanrao Bhaimare400%14 Jan 2022
NEW MAULI PARKSUNIL PURUSHOTTAM DHOBLE400%22 Feb 2023
ANAND SAGAR CITY PART 4MAHAJAN LAND DEVELOPERS400%21 Mar 2023
RAMAI NAGARKeshar Infra400%20 Jun 2024
Chhoriya Township - Karanja Gadge PlottingNiraj Santosh Chopda3979%11 Apr 2018
VASANT DHAWALEVASANT VITHOBAJI DHAWALE3921%8 Jul 2021
UTTAM TOWN - UNIT 3UTTAM PARK LAND DEVELOPERS3868%26 Sep 2017
SHREE HARIRAM NAGARSAIPARTH GROUP38100%3 Jul 2020
LEELA NAGARIROSHAN NAMDEORAO SHENDE3863%9 Jul 2020
Ganesh NagarSanjay Tejmal Ostwal380%7 Aug 2020
Laxmi NagarPratik Anil Meghe380%1 Jun 2023
MEHER NAGARMUSTAFA ASIF ZAHID380%29 Jul 2024
KEYSTONE ELEVATE-TOWER A1KEYSTONE COMMUNITIES LLP3845%17 Oct 2024
SHIVHARI NAGARRAJU N KACHOLE,MORESHWAR N KACHOLE,DNYANESHWAR N KACHOLE,RAMESHWAR N KACHOLE,SHAKUNTALABAI N KACHOLE380%13 Jan 2025
KEYSTONE ELEVATE-TOWER A2KEYSTONE COMMUNITIES LLP380%17 Mar 2025
VASTU ROYAL PARKVASTU LAND DEVELOPERS & BUILDERS3622%5 Dec 2017
MANMODE TOWN UNIT 1SANJAY MANMODE AND MOHAN MANMODE368%24 May 2022
Himalaya Heights - 2Maa Vaishnavi India City Developer and Builder Co3636%22 Mar 2024
Balaji Town -2Surendra Ramchandra Mahakalkar & Vinod Purushottam Dhoble3633%2 May 2024
KEYSTONE ELEVATE-TOWER B1KEYSTONE COMMUNITIES LLP360%25 Feb 2025
BALAJI TOWN-1Balaji Land Developers350%8 Nov 2021
BALAJI TOWN-2Balaji Land Developers3551%31 Oct 2021
MATRUBHUMI NAGARSACHIN SURYABHAN MOON3569%20 Jun 2022
PAWANSUT NAGARHARISH NANDLAL TAORI AND SUNIL VITTHAL LANGADE350%7 Nov 2022
SAI NAGARKISNA SARANGDHAR GOLHAR340%29 May 2020
LITTLE EARTH UNIT 3SHUBHALAXMI LAND DEVELOPERS3462%28 Jun 2020
SAI VILLAShourya Realtors340%29 Aug 2020
GOKUL CITY IXSHOURYA BUILDERS AND DEVELOPERS340%10 Oct 2020
SHRI BABA AASHIRWAD NAGARIMAHESH SHANKARRAO GULHANE3435%14 Sep 2021
LADOLE LAYOUTAishwarya S Ladole and Viraj S Ladole320%14 Jan 2020
GOVIND NAGARIGOVINDA TANBAJI FATING320%2 Mar 2022
BARAMATI CITYMaa Rani Hospitality and Infra3228%15 Jun 2022
MAJESTIC HEIGHTSEZ DEVELOPERS329%29 Dec 2023
HIMALAYA VISHWA-IISKYLINE HORIZON PVT LTD AND DILIP JAYSHUKLAL DOSHI310%27 Oct 2023
Ayodhya CityYogesh Laxmikant Gawande30100%30 Nov 2023
DHP TOWN-WING CDHP INFRAVENTURES280%30 Jul 2025
DHP TOWN-WING DDHP INFRAVENTURES280%24 Jul 2025
CHANDAN NAGARNARENDRA SONULE & 3 OTHERS RAMESH SONULE2748%7 Sep 2020
Vrundavan Park- Residential Layout Plan In Survey No-82Radha Builders & Developers277%8 Dec 2022
Maa Vaishnavi Nagari 9- Wing IIINiklesh Deshmukh, Sangita Rithe, Priyanka Deshmukh, Vandana Deshmukh(Part. Maa Vaishnavi Buil.&Dev.)260%20 Mar 2025
KEYSTONE ELEVATE-TOWER C1KEYSTONE COMMUNITIES LLP260%9 Apr 2026
SHIVANI TOWNSATONE SUDHAKAR PANDURANGJI HUF2556%21 Sep 2017
SHRI RAM LAKSHMAN VATIKAGANGADHAR RAMKRISHNA INGLEKAR250%15 Jan 2018
MAA RANI NAGARI PART - 2Parag Bhausaheb Mudey2584%4 Jan 2022
RAAVEE KI NAGARIRAJESH MOTILAL JAISWAL2516%12 Jan 2023
Midas Natures NestMidas Dream Built Pvt Ltd2454%16 Mar 2018
GANESH NAGAR-2SANJAY TEJMAL OSTWAL220%6 Jun 2022
VIDYA NAGRIPramod Wamanrao Kolhe2264%27 Jul 2023
KEYSTONE ELEVATE-COMMERCIALKEYSTONE COMMUNITIES LLP210%7 Mar 2025
Maa Vaishnavi Nagari 9 Wing 2Rajkumar Deshmukh Sangita Rithe (Partner Maa Vaishnavi Builders and Developers)2085%26 Sep 2022
SHIV SANDESH COLONYSHIV SANDESH COLONY190%21 May 2020
Gurukrupa Nagari- Residential Layout Plan in Survey No 66/4/1AShree Krushnagiri Hospitality & Infra190%10 Jan 2023
Sai Prakash ColonyPrakashchandra Ganpatrao Daf180%26 Jan 2021
VIBHAVARI ENCLAVEMANGESH VINODRAO SATPUTE180%14 Jul 2026
MANMODE TOWN UNIT 2SANJAY MANMODE AND MOHAN MANMODE160%24 May 2022
HARIOM NAGARSunil Purushottam Dhoble166%22 Feb 2023
MAJESTIC RESIDENCYSKYLINE INFRA1675%3 May 2023
GAJANAN LEELA 7KAPITAL HOMES160%6 Jul 2026
CHALAKH ARCADEPANDURANG GOVINDRAO CHALAKH1436%29 May 2021
MANMODE TOWN UNIT 3SANJAY MANMODE AND MOHAN MANMODE147%24 May 2022
AMBIKA2RAMESH BADRIPRSAD AGRAWAL12100%27 Jan 2020
AMBIKA 1ASHOK NATHURAM JOSHI12100%27 Jan 2020
The PalaciaShree Kushalguru Constructions120%16 Apr 2024
KESHAV PARKPUNJAB KESHAVRAO RAUT119%22 Oct 2020
Mahakali NagariAshish Ganesh Akare And Atul Namdev Wandile80%27 May 2019
VANDANA VIHARVANDANA DINKARRAO BHOYAR729%14 Nov 2024
Gurukrupa Nagari - Residential Layout Plan in Survey No.66/4/1KMAHESH SHANKARRAO GULHANE425%3 Jan 2023
SHIVNERI FORTVMB HOMES--25 Jul 2017
SAHAS ICONICSAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITED--26 Jul 2017
MAJESTIC PARADISEBURHANI BUILDER AND LAND DEVELOPERS--31 Jul 2017
VARCO PINNACLEVARCO REALITIES PRIVATE LIMITED--16 Aug 2017
SADGURU HEIGHTSSADGURU DEVELOPERS--7 Sep 2017
NALINI - SUMANTVINOD SUMANT UGEMUGE--23 Aug 2017
Abdullah HeightsHoney Garden Projects Private Limited--19 Aug 2017
MAHALAXMI APARTMENTMAA VAISHNAVI CITY DEVELOPER--31 Aug 2017
RICH RESIDENCYSWAMI SAMARTHA BUILDERS AND DEVELOPERS--31 Aug 2017
SHREE NATH RESIDENCYShreenath developers--14 Aug 2017
green leafVIKRANT VIJAYRAO BHUTE--6 Sep 2017
Vastuvishwa Apartments, BapatwadiRSV Realities--1 Sep 2017
WARDHA IT PARK PROJECTMaharani Paints Private Limited--31 Aug 2017
Maa Vaishnavi Complex No 8MAA VAISHNAVI BUILDERS & DEVELOPERS--22 Aug 2017
Tulip TowerV4 Infra--9 Oct 2017
SAIPRASAD APPARTMENTSAIKRUPA DEVELOPERS--22 Sep 2017
DREAMHEIGHT-2D H INFRASTRUCTURES--24 Nov 2017
Construction of 534 EWS T/s under PMAY, mauza Pimpalgaon, Tah. Hinganghat, Dist. WardhaMHADA (NAgpur Board)--12 Apr 2018
Rajgad apartmentPioneer Builders--16 Mar 2018
SUBHADRA RESIDENCYHARISH SUDHAKAR SHENDE--16 Mar 2018
Daimond Galaxy ComplexJRK builders--4 Sep 2018
Shree ApartmentPrashant Pralhad Muley--14 Jan 2019
JHULELAL HIGHTSVMB HOMES--31 May 2019
MAA MAHALAXMI RESIDENCYMAA VAISHNAVI INFRA--9 May 2019
SAHAS SHIVKUNJSAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITED--23 Jul 2019
URICH MALLSAWRABH BUILDERS--5 Sep 2019
Maa Vaishnavi Nagari - 9Rajkumar Deshmukh Sangita Rithe (Partner Maa Vaishnavi Builders and Developers)--12 Mar 2020
GAJANAN LEELA -VIKAPITAL HOMES--13 May 2020
MAJESTIC ARCADEBURHANI DEVELOPERS--31 Jul 2020
vastuvishwa apartments bachelor roadSaju Anapara Joseph Verghese--22 Oct 2020
Bhawani CommercialBHAWANI REAL ESTATE--8 Dec 2020
Vasant PalaceAtul Vasantrao Ghumde--23 Apr 2021
Shashi-GirChintamani Homes, Builders and Developers--7 Apr 2021
VAISHNO WARE HOUSEVAISHNO DEVELOPERS--5 Apr 2021
CRYSTAL RESIDENCYPRAVIN RAMESHRAO JAIN--23 Apr 2021
SADGURU PLAZASADGURU ASSOCIATES--18 May 2021
Shree Ganesh MansionPawansut Builders--18 May 2021
SATPUTE SHOPPING COMPLEXMANGESH VINODRAO SATPUTE--29 May 2021
PRATAPGAD APARTMENTPIONEER BUILDERS--22 Nov 2021
SHRIKRUPA COMPLEXRAJESH RAMESHRAW DAGWAR--9 Feb 2022
VASTUVISHWA APARTMENTS - SAMTA NAGARSaju Anapara Joseph Verghese--20 Jun 2022
CONSTRUCTION OF 468 EWS TENEMENTS UNDER PMAYHINGANGHAT MUNICIPAL COUNCIL--18 May 2022
Sahas Paradise proposed Apartment on Plot 8 and 9 In Sr No 39/1SAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITED--27 Oct 2022
DREAM HEIGHTS-3D H INFRASTRUCTURES--29 Sep 2022
Balaji Pride Commercial Cum Residential Complex on Plot no A and B in Sr No 39/3, 41/1-2,42/1-2BALAJI BUILDCON--30 Jan 2023
ARMORS NAGARARMORS DEVELOPERS PRIVATE LIMITED--8 Jun 2023
KRUSHNAKUNJ APARTMENTManoj Wasudeo Agrawal, Manju Manoj Agrawal and Shankar Wasudeo Agrawal--31 Jan 2024
AKSHARDHAM PHASE - 2GOVINDAM INFRA--17 Dec 2024
City CenterGUNGARA BALAJI VENTURE--1 Oct 2025
Planning a launch in Wardha? The area consolidated report packs launches, inventory movement, unit sizes and absorption across the projects you pick into one document. Rs 2,999 for the first project and Rs 1,999 for each additional one. Area report · Rs 2,999 · coming soon  See what is coming

Developers active in Wardha

MAHESH SHANKARRAO GULHANE (10), Krishnagiri Developers (8), MAHAJAN LAND DEVELOPERS (6), SAI SAHARA LAND DEVELOPERS (6), SANJAY TEJMAL OSTWAL (6), ATUL NAMDEO WANDILE (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Wardha projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 0% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Wardha project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Wardha district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Wardha registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Wardha project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Data from official MahaRERA filings.