293 projects are registered in Wardha district: 17,746 units across them, 6 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

293Projects covered
6Registered, last 12 months
17,746Units declared
15,060Units not yet booked
17Completion dates revised
0With declared litigation

Of the 293 covered registrations, 17 have revised their promised completion date and 0 declare litigation. The median project here is 0% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Wardha projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 293 projects with a promised date, 199 are recorded delivered, 41 are still on the register and 53 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 2 projects, delivered’172018: 10 projects, delivered’182019: 7 projects, delivered’192020: 4 projects, delivered2020: 2 projects, registration lapsed or cancelled’202021: 11 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 21 projects, delivered2022: 15 projects, registration lapsed or cancelled’222023: 38 projects, delivered2023: 9 projects, registration lapsed or cancelled’232024: 48 projects, delivered2024: 12 projects, registration lapsed or cancelled’242025: 30 projects, delivered2025: 4 projects, registration lapsed or cancelled’252026: 17 projects, delivered2026: 4 projects, on the register2026: 8 projects, registration lapsed or cancelled’262027: 9 projects, delivered2027: 12 projects, on the register’272028: 1 projects, delivered2028: 10 projects, on the register’282029: 1 projects, on the register’292030: 1 projects, delivered2030: 6 projects, on the register’302032: 7 projects, on the register’322034: 1 projects, on the register’34

77 projects promise possession in 2026 or later. Facts as per filings on RERA website.

01,2502,5003,7505,000today’172018: 415 flats, delivered’182019: 176 flats, delivered (only 2 of 7 projects filed a flat count)’192020: 182 flats, delivered’202021: 507 flats, delivered2021: 90 flats, registration lapsed or cancelled’212022: 1,070 flats, delivered2022: 900 flats, registration lapsed or cancelled’222023: 2,125 flats, delivered2023: 489 flats, registration lapsed or cancelled’232024: 3,407 flats, delivered2024: 464 flats, registration lapsed or cancelled’242025: 2,121 flats, delivered2025: 65 flats, registration lapsed or cancelled’252026: 1,609 flats, delivered2026: 147 flats, on the register2026: 547 flats, registration lapsed or cancelled’262027: 1,090 flats, delivered2027: 508 flats, on the register’272028: 45 flats, delivered2028: 848 flats, on the register’282029: 130 flats, on the register’292030: 427 flats, on the register’302032: 215 flats, on the register’322034: 169 flats, on the register’34

5,735 flats are promised in 2026 or later, across the 94% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Wardha possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 17 of 293 projects (6%) have moved at least once; the median move is 24 months and the longest is 62 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 2 projects kept the original date, 100% of the year’17Originally due 2018: 10 projects kept the original date, 91% of the yearOriginally due 2018: 1 projects moved by under 2 years, 9% of the year’18Originally due 2019: 6 projects kept the original date, 67% of the yearOriginally due 2019: 2 projects moved by under 2 years, 22% of the yearOriginally due 2019: 1 projects moved by 2 years or more, 11% of the year’19Originally due 2020: 5 projects kept the original date, 100% of the year’20Originally due 2021: 13 projects kept the original date, 87% of the yearOriginally due 2021: 1 projects moved by under 2 years, 7% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 7% of the year’21Originally due 2022: 35 projects kept the original date, 92% of the yearOriginally due 2022: 1 projects moved by under 2 years, 3% of the yearOriginally due 2022: 2 projects moved by 2 years or more, 5% of the year’22Originally due 2023: 44 projects kept the original date, 94% of the yearOriginally due 2023: 1 projects moved by under 2 years, 2% of the yearOriginally due 2023: 2 projects moved by 2 years or more, 4% of the year’23Originally due 2024: 58 projects kept the original date, 95% of the yearOriginally due 2024: 1 projects moved by under 2 years, 2% of the yearOriginally due 2024: 2 projects moved by 2 years or more, 3% of the year’24Originally due 2025: 33 projects kept the original date, 94% of the yearOriginally due 2025: 1 projects moved by under 2 years, 3% of the yearOriginally due 2025: 1 projects moved by 2 years or more, 3% of the year’25Originally due 2026: 27 projects kept the original date, 100% of the year’26Originally due 2027: 16 projects kept the original date, 100% of the year’27Originally due 2028: 11 projects kept the original date, 100% of the year’28Originally due 2029: 1 projects kept the original date, 100% of the year’29Originally due 2030: 7 projects kept the original date, 100% of the year’30Originally due 2032: 7 projects kept the original date, 100% of the year’32Originally due 2034: 1 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000’17Originally due 2018: 415 flats kept the original date, 91% of the year’18Originally due 2019: 176 flats kept the original date, 67% of the year (only 2 of 9 projects filed a flat count)’19Originally due 2020: 182 flats kept the original date, 100% of the year’20Originally due 2021: 597 flats kept the original date, 87% of the year’21Originally due 2022: 1,970 flats kept the original date, 92% of the yearOriginally due 2022: 12 flats moved by under 2 years, 3% of the yearOriginally due 2022: 59 flats moved by 2 years or more, 5% of the year’22Originally due 2023: 2,602 flats kept the original date, 94% of the yearOriginally due 2023: 41 flats moved by under 2 years, 2% of the yearOriginally due 2023: 38 flats moved by 2 years or more, 4% of the year’23Originally due 2024: 3,830 flats kept the original date, 95% of the yearOriginally due 2024: 98 flats moved by 2 years or more, 3% of the year’24Originally due 2025: 2,159 flats kept the original date, 94% of the yearOriginally due 2025: 16 flats moved by under 2 years, 3% of the yearOriginally due 2025: 30 flats moved by 2 years or more, 3% of the year’25Originally due 2026: 2,273 flats kept the original date, 100% of the year’26Originally due 2027: 1,414 flats kept the original date, 100% of the year’27Originally due 2028: 893 flats kept the original date, 100% of the year’28Originally due 2029: 130 flats kept the original date, 100% of the year’29Originally due 2030: 427 flats kept the original date, 100% of the year’30Originally due 2032: 215 flats kept the original date, 100% of the year’32Originally due 2034: 169 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Wardha

Whose name the land is in

Every one of the 293 registrations on this page answers this: on 230 the promoter is the only owner named; on 62 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 1 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Wardha: projects by taluka

293 of the 293 registrations on this page name their taluka.

TalukaProjectsShare
Wardha17259%
Hinganghat5117%
Seloo269%
Deoli259%
4 other talukas196%

Projects in Wardha

Showing 1 to 60 of 293 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Subhash ResidencyMouza Shahalangadi, 442301Abhijit Subhash Bidkar and Amol Subhash Bidkar3760%16 Oct 2025Completed
Shri Ram VatikaUmari Meghe, 442001Krishnagiri Developers3540%15 Apr 2024Completed
Baramati CityPimpalgaon, 442301ATUL NAMDEO WANDILE3000%8 Mar 2022Completed
Chhoriya Future City - Deoli Wardha PlottingAt Post - Deoli , Wardha, 442101Chhoriya Developers and Construction Company2955%5 Oct 2021Registered
LITTLE EARTH UNIT 11S. NO. 87/1 & 87/2, MAUJA SEWAGRAM WARDHA, 442001SANJAY P. MANMODE, GANESH P. ATKAR AND MOHAN P. MANMODE2510%22 Mar 2024Completed
Shree Sadguru Krushnagiri NagariUmari Meghe, 442001Shree Samarth Infra22442%23 Oct 2021Completed
DATTADHAM PART 4S.NO. 100,101,102 AND 103, MAUJA KARLA, WARDHA, 442001HARIBHAU WASUDEORAO WAZURKAR2131%30 Apr 2025Registered
R M Dhariwal Township - Arvi Bhaipur Plotting Phase - 2Arvi Bhaipur, 442201Dhariwal And Chhoriya Developers LLP21248%1 Dec 2020Registered
KESARIYA PARKRIMDOH, 442301RAKESH MOHANRAO MADE2037%24 Jan 2023Completed
baramati cityPimpalgaon, 442301MAHESH SHANKARRAO GULHANE20149%14 Mar 2022Completed
MAHALAXMI TOWNDEOLI, 442101VASTU LAND DEVELOPERS AND BUILDERS1840%22 Nov 2021Completed
SAHARA TOWNHINGANGHAT DIST WARDHA, 442301HARE KRISHNA LAND DEVELOPERS17972%20 Feb 2018Completed
Mahalaxmi CIty Part-2NA, 442001Krushna Builders & Developers17563%8 Dec 2023Completed
Omkar NagarMouza- Pimpalgaon, 442301A. V. Infratech1690%21 Dec 2024Registered
ISHWAR NAGARPimpalgaon, 442001Mahesh Batra & 2 Others1640%22 Feb 2022Completed
BARAMATI CITYPimpalgaon, 442101MAHESH SHANKARRAO GULHANE1620%14 Mar 2022Completed
MAHALAXMI CITY RESIDENTIAL LAYOUT PLAN IN SURVEY NO 128 129 108/1NA, 442001MAHESH SHANKARRAO GULHANE15646%3 Jan 2023Completed
ISHWAR NAGARPimpalgaon, 442001KESHAR INFRA1550%15 Feb 2022Completed
R M Dhariwal Township Wardha PlottingWardha - Bhivapur, 442111Dhariwal And Chhoriya Buildcon Pvt Ltd15181%23 Aug 2017Completed
NANO PARK-2JUNONA, 442301SAWAN JAGDISH MIHANI1500%23 Oct 2021Registration lapsed
Shree Krushnai CityWardha, 442001Krishnagiri Developers1460%28 Feb 2025Completed
KESARIYA NAGARIRehki road, 442104RAKESH M. MADE1450%11 Apr 2022Registration lapsed
Mauli parkPulgaon road, 442101KAUSALYADEVI BANSILAL TAORI1380%3 Nov 2021Registration lapsed
MANISH NAGARMHASALA WARDHA, 442001URBAN HERITAGE GROUP LAND DEVELOPERS1360%25 Mar 2021Completed
SUKHMANI NAGARPIMPALGAON, 442301SUKHMANI DEVELOPERS AND BUILDERS1340%2 Oct 2020Completed
GANESH NAGAR PART - 4SURVEY NO 194/3 MAUJA DEOLI, WARDHA, 442101PRATIMA DILIPRAO SHANKARPALE13010%6 Mar 2023Completed
R M Dhariwal Township - Aravi Bhaipur Plotting Phase -1Aravi - Bhaipur, 442201Dhariwal And Chhoriya Developers LLP13021%9 Jul 2020Registered
Shri Ram VatikaNA, 442001Krushna Builders & Developers12813%10 May 2024Completed
ANAND SAGAR CITY PART 2SURVEY NO 105/1 & 105/2, MAUJA UMARI (MEGHE), 442001MAHAJAN LAND DEVELOPERS1260%30 Aug 2022Completed
Chhoriya Fortune City - Sindhi Meghe Wardha Plotting Phase -1At/P- Sindhi (Meghe) , Wardha, 442001Dhariwal And Chhoriya Developers LLP12310%10 Jan 2021Registered
VAIBHAV NAGAR - 1DEOLI, 442101ASHISH SHARADKUMAR TIWARI1230%6 Oct 2025Completed
MAULI PARKMASALA, 442001SNEHAL BHAIYYAJI PISUDDE1200%22 Dec 2022Registration lapsed
MAULI PARKRENKAPUR, 442305RUPALI PRAVIN GHURDE1180%19 May 2023Completed
VAIBHAV NAGAR 2MOUJA DEOLI, 442101Vaibhav Ravi Kashikar1160%13 Oct 2025Completed
SUNANDA NAGRIANJI MOTHI, 442001SHARAD BHAGWANTRAO TALHAN1120%29 May 2025Completed
KINGS VILLAGESeloo, 442104VYANKATESH ASSETS MAXIMIZER ASSETS PRIVATE LIMITED1113%14 Aug 2017Registration lapsed
Mahakali Nagari-7Pimpalgaon, 442301Krishnagiri Developers1100%26 Feb 2020Completed
SHREE SHYAM NAGARWardha Raod, 442201SHREE SHYAM DEVELOPERS10833%7 Nov 2020Registration lapsed
KANHA CITYS NO 112/1 MAUJA SINDI MEGHE WARDHA, 442001SHRI KRISHNA LAND DEVELOPERS AND BUILDERS1070%28 Apr 2022Completed
SAI NAGARSURVEY NO 80-1 & 80-2, MAUJA PIMPALGAON, 442301NIRAJ LOHAKARE, SANJAY SHARMA, SUNIL LANGADE, VIKRAM TAORI AND PRADEEP NAHALE1060%11 Jun 2024Completed
AKSHARDHAMWARDHA, 442001GOVINDAM INFRA1050%2 May 2024Registered
GMR PLOTSBHIDI, 442101GMR Plots10582%14 Jun 2021Registration lapsed
KRUSHNA KAMAL NAGRIMASALA, 442001VITTHAL KACHOLE, ESHWAR KACHOLE, MANDA ZADE, MAYA SONTAKKE AND CHITRA DAIGAVANE1050%27 Dec 2023Completed
LITTLE EARTH - UNIT 5WARDHA, 442001SAI SAHARA LAND DEVELOPERS10415%30 Apr 2020Completed
SAI NAGARBORGAON MEGHE WARDHA, 442001SAI SAHARA LAND DEVELOPERS1040%17 Aug 2021Completed
AAI KRUPA NAGARISindi Meghe, 442001MAHESH SHANKARRAO GULHANE1030%5 Apr 2021Completed
Siyaram NagarNA, 442001Balkrishna Jajodiya, Geetadevi Jajodia and Shriniwas Jajodiya10310%31 Jan 2024Completed
MAULI PARKDEOLI, 442101SNEHAL BHAIYAJJI PISUDDE10217%6 Mar 2023Registration lapsed
SHUBHANGI S THAKRE AND VAISHALI K GALHATARVI, 442201SHUBHANGI SUBODH THAKRE1010%12 Apr 2023Registered
ANAND SAGAR CITY - PART 7S. No. 108/1/A and 108/1/K, Mauja Umari Meghe Wardha, 442001MAHAJAN LAND DEVELOPERS1000%10 Nov 2023Completed
Baramati CityPimpalgaon, 442301MAHESH SHANKARRAO GULHANE10042%14 Mar 2022Completed
DEHU AALANDI PARKSELOO, 442104DAMOHAR MAHADEORAO MANKAR980%24 May 2022Registration lapsed
Aai NagariSindi Meghe, 442001Manoj Vora, Anju Tiwari & Ujwala Purohit970%19 Nov 2020Completed
Nano Parkjunona, 442301SUNIL HARPALDAS MIHANI970%19 Nov 2020Completed
AARADHYA NAGAR PART 2SEWAGRAM WARDHA, 442001PAWAN SHRIRAM PODDAR961%4 Jan 2021Completed
MAHAKALI NAGARI-7Pimpalgaon, 442301Krishnagiri Developers960%9 Mar 2020Completed
MAHAKALI NAGRI - 6Hinganghat, 442301Krishnagiri Developers960%13 Mar 2019Completed
Mauli ParkPIMPALGAON, 442301SANJAY TEJMAL OSTWAL960%27 Aug 2020Completed
NAKSHTRA NAGARIPIMPALGAON MA, 442301VINOD PANDURANG NIKHADE950%24 Jul 2020Registration lapsed
SHREE SAI NAGARSAWANGI MEGHE, 442001KESHAR INFRA9494%23 Jul 2020Completed
Planning a launch in Wardha? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Wardha

MAHESH SHANKARRAO GULHANE (10), Krishnagiri Developers (8), MAHAJAN LAND DEVELOPERS (6), SAI SAHARA LAND DEVELOPERS (6), SANJAY TEJMAL OSTWAL (6), ATUL NAMDEO WANDILE (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Wardha projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 0% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Wardha project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Wardha district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Wardha registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Wardha project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Wardha district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.